Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Sep 23, 2026otc alterations permit: mechanical and electrical work for t.i. at suite 1825. ref: 202606223639Electrical$82,000—issued202609107907
Sep 3, 2026otc alterations permit: 31st floor: restroom upgrade consisting of demo and construction of non-structural partitions, finishes, accessories, plumbing fixtures and light fixturesPlumbing$112,286—issued202607235431
Aug 24, 2026otc alterations permit: #1850: mechanical and electrical work to tenant improvement ref 202605261889Electrical$60,000—issued202608126469
Aug 18, 2026otc alterations permit: 30th fl, ste 3050 interior ti including selective demo and construction of non-structural partitions, doors, glazing, electrical outlets, finishes and lightingElectrical$139,810—issued202608046004
Dec 23, 2025otc alterations permit: 2nd floor: mechanical and electrical work for t.i. ref pa #202511048880Electrical$180,000—Finaled Feb 11, 2026202512020695
Nov 3, 2025otc alterations permit: tenant improvement of office for installation of non bearing partition wall, extend mechanical duct for return grille and relocate electrical outlets, no wall demolition, reference p/a 2024-0620-4858 for previously performed partial floor/subject tenant space tiHeating and cooling$115,304—issued202508143043
Jun 26, 2025otc alterations permit: demolition of non structural walls, doors, glazing, flooring, electrical, millwork, finishes, ceilings, light fixtures, demo only. no build backElectrical$127,035—issued202506118398
May 21, 2025otc alterations permit: 8th floor: new control relays. qty 3 for heat pumps. as built to fire permit pa #202505166654Heating and cooling$1,800—issued202505216964
May 16, 2025otc alterations permit: 8th/f fire alarm modification demo 4 speaker strobes, 1 smoke detector, 1 transfer fan relay. remove & replace 2 speaker strobes, 2 smoke detectors with base. install n 3 duct smoke detector assemblies, 1 smoke detector with base, 2 interposting relays, 16 speaker storbes, 8 strobes ref 202412267405Heating and cooling$34,379—issued202505166654
May 15, 2025otc alterations permit: 18th fl ref pa # 2025-0212-0145 fire alarm tenant improvement project consisting of notification appliances and duct smoke detectors to accommodate the new layoutHeating and cooling$19,050—issued202505156510
May 6, 2025otc alterations permit: 18th fl- electrical: power, lighting & signal ref pa #2025-0210-0043Electrical$87,000—Finaled Nov 5, 2025202504295431
May 6, 2025otc alterations permit: 18/f: deferred mechanical and electrical. ref pa# 202502120145Electrical$400,000—Finaled Nov 5, 2025202504224982
Apr 8, 2025otc alterations permit: ste 1800a - interior ti including, selective demo and construction of non-structural partitions, doors, glazing, electrical, millwork, finishes and lighting. mep deferrElectrical$1,112,286—Finaled Sep 12, 2025202502120145
Feb 20, 2025otc alterations permit: 2/f: fire alarm t.i. - demo speakers, speaker strobes, strobes. install (30 speaker/strobes, strobes, smokes, duct smokes, relays. ref arch permit 202410253783 and mech permit 202501168465Heating and cooling$35,422—Finaled Jun 18, 2025202502200715
Jan 16, 2025otc alterations permit: hvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783Heating and cooling$871,153—Finaled Jul 10, 2025202501168465
Jan 13, 2025otc alterations permit: 8th floor; interior demolition of ceiling height partitions construction of new partiations, doors, glazing, millowrk, finishes, associated mechanical, electrical, and plumbingPlumbing$2,500,000—Finaled Jul 22, 2025202412267405
Dec 5, 2024sign - erect: reface existing banner signs, non electric doulbe faced sign. sign same as citibank with 10'x3'. signs on plans as gElectrical$16,000—Finaled Jan 26, 2026202411195252
Dec 5, 2024sign - erect: install electric illuminated, single faced sign. sign sname as citibank with 26" x9'2". signs on plans as aElectrical$8,000—Finaled Jan 26, 2026202411195251
Dec 5, 2024sign - erect: install electric illuminated , single faced sign. sign sname as citibank with 46" x16'4". signs on plans as b, c, d, eElectrical$24,000—Finaled Jan 26, 2026202411195249
Dec 5, 2024sign - erect: install electrical, single faced sign. sign sname as citibank with 16'x5'8". signs on plans as f, i, jElectrical$18,000—Finaled Jan 26, 2026202411195248
Sep 17, 2024otc alterations permit: 27/f: office ti - new minor demo of existing walls and ceilings, new office fronts, relocation of office fronts, doors, light fixtures, and electrical fixtures and finishesElectrical$350,000—Finaled Dec 9, 2024202409100445
Sep 10, 2024otc alterations permit: interior soft demo of vacant tenant space. demo includes non-bearing partitions, suspended ceilings, and light fixtures, millwork fixtures, flooring and wall finishes, mech, electric, plumbing fixtures and distributionPlumbing$125,000—Finaled Sep 18, 2025202408279534
Apr 19, 2024otc alterations permit: deferred submittal for pa# 2023-0824-5103 for electrical only. reference ew202404027733Electrical$20,000—Finaled Jun 27, 2024202404109727
Feb 9, 2024otc alterations permit: 12/f-ste 1225: minor selective demo & constructionof non-structural partitions, glazing, electrical outlets, millwork and lighting, new drinking fountain. no change in occupancy use or areaElectrical$185,538—Finaled Aug 30, 2024202401294863
Oct 23, 2023otc alterations permit: existing fire sprinkler system tenant improvement. ev charging garage upgrade, 48 sprinklersElectrical$30,000—Finaled Feb 9, 2024202310209092
May 4, 2023otc alterations permit: 23/f: t.i. with nonstructural partitions, mechanical, electrical, plumbing work includedPlumbing$592,900—Finaled Oct 2, 2023202305026903
Mar 27, 2023otc alterations permit: 29/f: interior renovation of tenant suite including addition of four private offices with non-load bearing walls, new tiles, new light fixtures, finishes and furniture. mech and electrical upgradesElectrical$304,000—Finaled Sep 14, 2023202212299382
Apr 22, 2022otc alterations permit: 19th floor: t-24 & mech to demo & add new lighting power, and hvac system. ref t.i. 202202248620Heating and cooling$12,000—Finaled Jun 3, 2022202204222796
Mar 28, 2022otc alterations permit: ste 130 - light remodeling, painting, restoring cabinets, installing wood paneling, wood floors, replace electric water heater, install store signs, build sheetrock and wall and door to create storage area. sprinkler under sep permit, if applicWater heater$40,500—issued202203049280
Feb 18, 2022otc alterations permit: 25th floor fire alarm addition: demo speaker strobs, add speaker strobs, control relays; 13 r/b relays; smoke detectors ; duct detectorHeating and cooling$15,000—Finaled Aug 31, 2022202202188333
Jan 28, 2022otc alterations permit: 25/f: fa modification, demo smoke detector & speaker strobes. install spkrs/strobe; strobes; control relays; rib relays; duct detectors; smoke detectors. replace strobe power suppply w/ 10 ampsHeating and cooling$36,402—Finaled Jun 6, 2022202201286873
Jan 28, 2022otc alterations permit: 28th fl ste 2822 - changeout & relocate fire sprinklers, per ti 2021-1202-3558Heating and cooling$900—Finaled Feb 9, 2022202201276840
Jan 25, 2022otc alterations permit: 28/f: t.i scope includes alterations to 1 corner office space. demo and construction of non structural partitions and finishes. alterations to existing ceiling and mechanical and electricalElectrical$24,000—Finaled Mar 17, 2022202112023558
Jan 24, 2022otc alterations permit: 25th fl: interior ti - includes demo & construction of non structural partitions, doors, ceilings, electrical, plumbing, hvac & finishesHeating and cooling$600,000—issued202110221009
Jan 24, 2022otc alterations permit: 24th fl interior tenant improvement - demo & construction of non-structural partitions, doors, ceilings, electrical, hvac & finishesHeating and cooling$600,000—issued202110221003
Jan 18, 2022otc alterations permit: 25th fl: add 44, relocate 27 & change out 32 fire sprinklers. ref ti pa# 202109309523Heating and cooling$56,300—Finaled Jun 6, 2022202201146063
Oct 1, 2021otc alterations permit: 25th fl:demo smoke detector, control relay, wall strokes, emergency door release.install duct detector, rib relays, control relay.relocate sprinklers/strobes & 1 pull station. replace speaker/strobe with new. ref#2021-0825-7080Heating and cooling$5,300—Finaled Nov 4, 2021202110019661
Aug 26, 2021otc alterations permit: basement: fire pump replacement jockey pump+ controllers with extg pump pad. electrical by othersElectrical$50,000—Finaled Feb 17, 2022202108247026
Apr 1, 2021otc alterations permit: reference pa 2020-11239536 f/a addition on the 21st floor: demp smoke det.; wall strobes; spkrs; duct detectors; (add spkr/strbs; control relays; rib relay; duct detectorHeating and cooling$8,240—Finaled May 11, 2021202103045950
Feb 25, 2021otc alterations permit: 21st fl: int tenant improvement off space. work incl non-struc demo & add of non-load bearing walls, doors & refresh of int finishes. no struc work. no chg of occup. no chg of use. new air distrib in area of work with new heat pump. ref pa 202010015688. sprinkler/fire alarm under sep permitsHeating and cooling$491,750—Finaled Aug 16, 2021202011239536
Feb 1, 2021otc alterations permit: barrier removal only at 21st fl. toilet rooms, remove, replace relocate accessories, all plumb fixtures to remain no mep sprinkler or life safety as all equipment and devices to remain. n/a maherPlumbing$29,865—Finaled Aug 16, 2021202010015688
Dec 3, 2020otc alterations permit: ref p/a 2020-0807-1367. 30th flr modification: remove spkr/strobes; smk detector; duct detector; heat detector. install strobe power supply; spkr/strbs; spkrs; smoke detector; duct detector; rib relaysHeating and cooling$24,608—Finaled Dec 21, 2020202011199340
Jan 28, 2020otc alterations permit: 22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systemsPlumbing$450,000—Finaled Aug 25, 2020201912190095
Jan 7, 2020otc alterations permit: unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing workPlumbing$580,000—Finaled Oct 1, 2020201912230407
Oct 18, 2019otc alterations permit: 22nd fl fa modifications: remove 2 smoke detectors; 9 strobes; 6 speakers. replace 3 speakers w/speaker/strobes; 1 strobe power supply. add 12 speaker/strobes; 2 smoke detectors; 1 duct detector, 2 control relays; 4 pilot relays. ref pa #201909161693. maher naHeating and cooling$15,760—Finaled Mar 18, 2020201910114216
Oct 8, 2019otc alterations permit: 22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/aPlumbing$590,000—Finaled Feb 13, 2020201909303021
Apr 29, 2019otc alterations permit: non structural demo only. demolish partitions, door, millwork, furnishings & equip. remove all electrical from demoed walls. per ab-017. mep/fire/life safety under sep permit. maher naElectrical$56,000—Finaled Sep 30, 2019201904258920
Mar 15, 2019otc alterations permit: f/a modification on 16th fl. remove 2 smoke detectors, 32 spker/strobes, 12 ceiling/wall strobes, 6 spklrs, 4 duct detectors, install 6 smoke detector, 37 sprklr/strobes, 3 sprkl. 12 rib relays, 4 duct detectors, 6 control relays, replace 6 smoke detectors with new. n/a maherHeating and cooling$42,480—Finaled May 4, 2019201903155309
Feb 19, 2019otc alterations permit: 28th fl - ref pa 2018-1126-6625 f/a modification on 28th fl - remove 8 smoke det; 24 strobes, 20 speakers, 4 door holder, 1 control relay; 1 emergency door release; install 7 smoke det; 31 speaker/strobe; 3 speakers; 13 rib relays; 11 duct detectors, 4 door holders; replace 3 smoke det w/new; 1Heating and cooling$44,220—Finaled Apr 8, 2019201902193212
Feb 8, 2019otc alterations permit: 16th floor:demo of non-structural walls. construction new tenant suite including non structural walls, plumbing and ceiling systems. life safety and sprinkler to be design build under seperate permit. n/a for maherPlumbing$1,672,776—Finaled Jun 4, 2019201901100071
Nov 28, 2018otc alterations permit: full floor ti non structural partitions, new ceiling millwork, mech, elec, plumbingPlumbing$3,700,000—Finaled May 22, 2019201811266625
Nov 5, 2018otc alterations permit: 28th flr - add zero, relocate zer, plug 11 and change out 138 sprinklers to conform with the new wall/ceiling layout of the ti ref 201810264287Heating and cooling$31,050—Finaled Apr 15, 2019201811024917
Oct 19, 2018otc alterations permit: 15th flr. f/a modification. remove 5 strobes, 7 spkr / strobes, 4 duct det, 1 smoke det. install 12 spkr / strobes, 2 control relays, 3 duct det, 4 rib relays, 1 smoke det. replace 1 strobe power supply, 4 strobes w/ spkr / strobes. n/a for maherHeating and cooling$15,380—Finaled Nov 6, 2018201810193663
Sep 28, 2018otc alterations permit: 17th flr - f/a modification - remove 22 sprk.strobes. 3 strobes add 26 sprinklers 3 spkr 4 smk det 2 control returns, 8 pilot relays, 2 emergency door release 4 duct det maher naHeating and cooling$27,480—Finaled Dec 7, 2018201809281695
Sep 21, 2018otc alterations permit: 17th floor: mechanical, electrical and plumbing work for t.i. . ref arch #201806141843Plumbing$1—Finaled Dec 2, 2019201809059147
Aug 31, 2018otc alterations permit: 15th - modifications remove strobes; 7 speakers; 1 speaker/strobes, replace 1 strobe power supply, 6 smoke detectors with new. add 8 speaker strobes; 5 smoke detectors; 2 duct detectors; 4 door holders and 6 rib relays. ref pa 2018-0720-5044Heating and cooling$15,850—Finaled Nov 14, 2018201808248216
Aug 28, 2018otc alterations permit: 24th fl - f/a modification - remove 9 speaker/strobes & 1 speaker; relocate 1 smoke detector; add 10 speaker/strobes; 1 control relay, 2 duct detectors; 3 rib relays. ref pa 2018-0529-0338Heating and cooling$8,320—Finaled Oct 24, 2018201808288490
Jul 17, 2018otc alterations permit: 17th fl - ref pa 2018-0614-1843, f/a modification. remove 4 strobes; 4 speakers/ 2 speakers/strobe; replace 1 strobe power supply to 10 amps; 9 smoke detectors with new. add 9 speaker/strobes; 4 smoke detectors, 2 control relays; 4 pilot relays; 2 duct detectors; 2 door holdersHeating and cooling$14,568—Finaled Oct 3, 2018201807164622
Jul 12, 2018otc alterations permit: 24th floor: interior t.i. of an extg leased space. work includes demo of extg office and construction of non structural partitions, ceilings, and finishes. mep work includes hvac, elecgtrical outlets and high fixtures and new plmg lines and fixtures. n/a for maherHeating and cooling$816,261—Finaled Mar 18, 2019201805290338
Jul 11, 2018otc alterations permit: 17th fl - bathrooms & corridors - demolition of non-structural partitions and ceilings. construction of new non-structural walls, ceiling, electrical, mechanical & plumbing life safety & fire sprinkler under separate permitPlumbing$2,500,000—Finaled Dec 17, 2019201806141843
Jun 26, 2018otc alterations permit: 29th fl - ref pa 2018-0504-8183 add 27 ceiling speaker/strobes; 3 smoke detecrs; 2 speakers, 5 control relays, 11 pilot relays; 1 emergenecy door relays. remove 20 speaker/strobe; 4 wall strobes; 5 speakers; 4 ceiling strobes replace; 1 strobe power supply; 9 smoke detector; 5 duct detectorHeating and cooling$27,000—Finaled Jul 31, 2018201806081422
Jun 20, 2018otc alterations permit: 9th flr - commercial tenant improvement. mechanical and electrical work. new heatpumpm, new transfer fan. ref p.a # 201806071275Heating and cooling$36,000—Finaled Sep 27, 2018201806182138
May 22, 2018otc alterations permit: tenant improvement on the 12th fl. to include new partitions, minor ceiling work, mechanical & electrical includedElectrical$330,000—issued201805229795
Apr 10, 2018otc alterations permit: f/a modifications on 12th fl: relocate smoke detector; speaker/strobes; speaker; strobe; control relays; rib relays; duct detectors. ti permit # 201801128488. maher naHeating and cooling$15,208—Finaled May 14, 2018201804105907
Feb 9, 2018otc alterations permit: ref pa 2017-1204-5422 - f/a modification on 14th floors; remove 4 duct detectors; 23 speaker/strobe; 4 speaker; 9 strobes. replace 1 strobe booster and 8 smoke detectors; install 36 speaker/strobes, 2 smoke detectors 6 duct detectors, 1 control relay; 7 pilot relays and 2 emergency door releaseHeating and cooling$38,371—issued201802090905
Feb 2, 2018otc alterations permit: f/a modification on 4th fl: install speaker/strobes; smoke detectors; control relays; door holders; duct detectors; rib relays; upgrade strobes power supply to 10 amps; replace smoke detectors w/new. remove wall strobes an speakers. ref ti 201801057908 maher naHeating and cooling$20,000—Finaled Aug 27, 2018201802020241
May 12, 2017otc alterations permit: 24th fl-demo 5 smoke detectors,5 strobes/speakers,6 magnetic door holders. install 1 pull station @ elevator lobby, 9 new smoke detectors w/base,10 new speaker/strobes,7 new duct detectors by new fsd's.add 7 rib relays,6 door holders, upgrade to new booster, add 1 relay for door holders.201703060753Heating and cooling$13,500—Finaled Aug 23, 2017201705126425
May 3, 2017otc alterations permit: 24/f: demo smoke det, 14 ceiling speakers,17 strobes, add 8 smoke det, add 26 celing speakers/strobes,relocate 3 speakers/strobes, add 1 wall speaker strobe, add 2 celing seakers,add 4 new duct det for new heat pumps, add 7 rib relays for heat pumps& trans fans. add 1 cr for new heat pumpHeating and cooling$20,000—Finaled Aug 11, 2017201705035600
Mar 3, 2017otc alterations permit: 27/f-fire alarm, demo 2 ceiling speaker/strobe, install 10 new ceiling speaker strobes. 1 new rps booster with batteries, 2 new smoke detectors in idf room & it room closet, 3 new duct detectors for 3 new heat pumps, 1 new control relay for new transfer bars, 7 new rib relays. t.i. pa#201612215510Heating and cooling$8,000—Finaled May 11, 2017201703030595
Feb 13, 2017otc alterations permit: demo 3 ceiling speaker strobes, install 21 ceiling speaker strobes, 1 wall strobe, 1 smoke detector for mdf room,2 duct detectors for 2 new heat pumps and 1 control relay for 2 new heat pumps. reference 2016.12.13.4810. n/a maherHeating and cooling$13,000—Finaled Mar 27, 2017201701127071
Feb 13, 2017otc alterations permit: 24/f -demo new non structural partitions, ceiling, lighting, electrical, finishes. no change in occupancy, use or area. maher not reqElectrical$194,280—Finaled Oct 5, 2017201611183070
Jan 25, 2017otc alterations permit: 27th flr: install 2 duct detectors for the 2 new fsd's, install 2 rib relays, replace 2 corridor speaker/strobes with ne, replace 3 corridor smoke detectors with new maher naHeating and cooling$2,500—Finaled Mar 27, 2017201701257844
Aug 10, 2016otc alterations permit: 12th flr common area-install 7 speaker/strobes, 2 door holders in south pel door, 5 duct detectors for new f.s.d.'s, add 1 smoke detector, add 5 rib relays, demo 6 ceiling speakers, 5 wall strobes in common area. replace 6 existing smoke detectors with new, relcoate 2 smoke detectors. #201606099510Heating and cooling$12,000—Finaled Oct 18, 2016201608104646
Aug 8, 2016otc alterations permit: mechanical, electrical and plumbing work for ti. tenant improvement for 23rd floor maher naPlumbing$1—Finaled Oct 19, 2016201607212937
Aug 5, 2016otc alterations permit: floors 12 & 12-m: install speaker/strobes, install strobe, speakers, control relay for heat pump, duct detector for heat pump, smoke detector, rib relay, replace speaker/strobes & upgrade strobe power supply to 10 amps. n/a ordinance #155-13. ref 2016-0617-0241Heating and cooling$14,500—issued201608054278
Aug 2, 2016otc alterations permit: 26th floor f/a - add strobe power supply; speaker/strobes; speakers; smoke detector; duct detectrors for fsd's; duct detectors for heat pumps; control relays; pilot relays; emergency door release; door hold opens; remove speaker/strobes. #2016.05.19.7914Heating and cooling$41,800—issued201608023915
Aug 2, 2016otc alterations permit: 6th fl f/a: install 1 strobe power supply, 7 ceiling speaker/strobes, 4 smoke det, 4 duct det, 9 pilot relays, 2 emergency door release, 2 monitor modules, replace 4 duct det, 5 ceiling speaker/strobes, relocate 2 smoke det, rewire 2 control module. t.i.#201604134657,2016.04.20.5232, 2016.04.13.4657Heating and cooling$21,600—Finaled Sep 26, 2016201606301269
Jul 14, 2016otc alterations permit: 8th flr: install 1 strobe power supply; 7 ceiling speaker/strobes;2 smoke detectors;2 duct detectors; 6 pilot relays;3 emergency door release; rewire 2 control modules; relocate 2 smoke detectors; replace 2 duct detectors. n/a for maher. ref app#201604134657/201604285926Heating and cooling$18,560—Finaled Sep 26, 2016201606301271
Jun 30, 2016otc alterations permit: 7th flr: install 1 strobe power supply;8 ceiling speaker/strobes; 4 smoke detectors; 2 duct detectors; 7 pilot relays; 2 emergency door release; replace 4 duct detectors;6 ceiling speaker/strobes;relocate 2 smoke detectors; rewire 2 control modules. 2016.0428.5922 & 2016.04.28.4657Heating and cooling$22,000—Finaled Sep 26, 2016201606301270
Jun 30, 2016otc alterations permit: 5th flr: install 1 strobe power supply; 32 speaker/strobes; 3 smoke detectors; 2 duct detectors; 8 pilot relays; 2 emergency door release; 1 dr release in fcc rm; 1 monitor modules; replace 5 duct detectors; relocate 2 smoke detectors; rewire 2 control modules. ref app#201604053943 n/a fro maherHeating and cooling$35,400—Finaled Sep 26, 2016201606301266
Apr 29, 2016otc alterations permit: 5th floor - mech, elec & plumbing work related to ref pa 2016-0413-4657 (partial floor ti, including office space, break room & restrooms). fire/life-safety/sprinklers shall be design building under separate permit. maher naPlumbing$1—issued201604205232
Apr 1, 2016otc alterations permit: 27th flr: add,relocate,remove & change out fire sprinklers per tenant improvement build out 2015-1221-5580, 3 add,9 relocate, 11 remove and 125 change out; maher n/aHeating and cooling$18,840—Finaled May 4, 2016201604013696
Mar 17, 2016otc alterations permit: 27th flr -install 10 ceiling speaker/storbes,4 smoke detectors, 1 strobe power supply with 2 batteries, 3 duct detectors, 5 rib relays, 6 door holders. replace 3 pull stations with new, 5 smoke detectors with new, 1 nac control module with new. revise all necessary software to t.i. ref #201512215580Heating and cooling$14,906—issued201603172301
Jan 20, 2016sign - erect: erect a single faced electrical sign ; maher n/aElectrical$5,000—issued201601197287
Jan 20, 2016sign - erect: erect a single faced electric wall sign ; maher n/aElectrical$3,000—issued201601197286
Oct 23, 2015otc alterations permit: deffered electrical for ref pa 2015 0401 2482 maher naElectrical$1—Finaled Dec 3, 2015201510159754
Jul 16, 2015sign - erect: erect ground, non-electric, indirect monument signsElectrical$80,000—Finaled May 25, 2016201506048066
Jul 9, 2015otc alterations permit: 23rd floor: fire alarm t.i.: install 34 speaker/strobes, 4 smoke detectors, 1 strobe power supply, 3 pull stations, 2 door holdings, 6 duct detector, 7 rib relays. ref app#201507030614 and 201504012482. n/a for maherHeating and cooling$29,298—issued201507090990
Jun 26, 2015otc alterations permit: 11th floor: f.a. t.i. relocate 9 speakers/strobes, add 19 speaker/strobes, 2 speakers, 1 smoke detector, 11 duct detectors, 17 rib relays, 2 control relay, new slc loop from level 10 for new detectors on level 11. n/a for maher. ref app#201504062040Heating and cooling$26,728—Finaled May 4, 2016201506260027
May 22, 2015otc alterations permit: 11th flr: non rated partitions, ceiling, lights, electrical, millwork, finishes, demo completed under separate permit, no change in occupancy use or area; maher n/aElectrical$1,595,000—Finaled May 4, 2016201504062840
Apr 7, 2015otc alterations permit: fire alarm modification on the 19th fl install 15 speaker, strobes, 3 smoke detectors, 1 strobe power supply, 1 control module, 2 control relay, 2 duct detecttors, 3 rib relays, 6 door holders, replace 3 pull stations, replace 5 smoke detectors, revised necessary software due the removal of interHeating and cooling$18,000—issued201504072953
Mar 11, 2015otc alterations permit: 19th floor: t.i. including construction of new non-structural partitions, plumbing, ceiling, electrical, lighting, millwork, finishes. no increase in area. demolition under separate permit #201408123586. n/a for the maherPlumbing$700,500—issued201503050056
Mar 10, 2015otc alterations permit: 19th floor non-structural demo. new non-structural partitions cieling, lighting, electrical finishes, stair removal and slab infill. no change in occupancy, use, or area. n/a for the maherElectrical$195,000—Finaled Apr 11, 2016201503039765

On California St

1,703 permits on record on California St.

TradePermitsSince Oct 5, 2024Median declaredRangeLast
Roofing30551$22,000$8,978–$198,000Jul 20, 2026
Electrical535104$100,000$3,000–$785,000Sep 23, 2026
Heating and cooling51370$33,865$1,470–$385,794Sep 21, 2026
Plumbing32760$90,392$3,450–$747,457Oct 1, 2026
Solar144—under 5May 7, 2026
Water heater93—under 5Sep 4, 2026

Roof replacement cost in San Francisco

Across 5,872 one- and two-family reroof permits since October 5, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 5, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 5, 2026. Owner names are not shown on any page.