Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Sep 22, 2026otc alterations permit: 45th floor: reference#202607305820 mechanical and electrical for the projectElectrical$44,335—issued202609188315
Aug 12, 2026otc alterations permit: 45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491Electrical$202,000—issued202607225371
Aug 12, 2026otc alterations permit: 10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491Electrical$202,000—issued202606253884
Aug 4, 2026otc alterations permit: 45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072Electrical$254,000—issued202607305820
Jul 8, 2026otc alterations permit: 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbingPlumbing$1,583,313—issued202606183505
Apr 17, 2026otc alterations permit: 28/f - ste #2820: mechanical and electrical . ref pa# 202512051088Electrical$460,000—Finaled Aug 6, 2026202604109205
Mar 25, 2026otc alterations permit: 9th flr: suite 925: mech + electrical for 202512051085Electrical$710,000—Finaled Jul 6, 2026202603117335
Mar 18, 2026otc alterations permit: 16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electricalElectrical$80,000—Finaled Jun 9, 2026202603137519
Mar 18, 2026otc alterations permit: 24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electricalElectrical$80,000—Finaled Jun 9, 2026202603137517
Nov 6, 2025otc alterations permit: g/f: retail space, electrical for space. add new coversheet to remove deferred sumbitals ech and plumbing from this project. reference # 202502210835Plumbing$13,090—Finaled Dec 4, 2025202511058999
Oct 23, 2025otc alterations permit: 35th fl. fire alarm 1-2 way 1 smoke supply 31 ceiling speaker strobes, 10 strobes, 2 call stations, 39 smoke detectors, 5 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 2025-0519-6756Heating and cooling$117,351—Finaled Aug 21, 2026202510237967
Oct 23, 2025otc alterations permit: 34th fl. fire alarm 1 2-way call station: 1 remote power supply, 23 ceiling speaker strobes, 10 strobes,2 call stations, 39 smoke detectors, 6 duct detectors, 23 relay modules, 1 control module and 1 monitor module to be added pa ref# 202505206899Heating and cooling$67,728—Finaled Aug 21, 2026202510237960
Jul 18, 2025sign - erect: suite 1050:to erect non electrical and non-illuminated blade sign. project includes 2 identical signs. sign a and sign bElectrical$3,000—Finaled Oct 23, 2025202507181106
Jul 1, 2025otc alterations permit: fitout of 770 sq ft kiosk located at 101 california plaza. use will be a sake bar, no food will be prepared on site. packaged food maybe served. millwork installed as well gwb finishes. plumbing & electrical work will be deferred. change of usePlumbing$42,500—Finaled Dec 4, 2025202502210835
Jun 16, 2025otc alterations permit: 8f ref pa #2024-1212-6710: fire alarm 11 speaker strobes, 5 strobes, 4 relay modules, 3 duct detectors will be added. 11 smoke detectors were relocatedHeating and cooling$29,700—Finaled Dec 2, 2025202506138659
Jun 2, 2025otc alterations permit: unit #300: replacing evo event 48e electric cooktop model #10-0148-evt w/ new evo event 48e plus electric cooktop model #10-0600-evt. inkind. install per manufacturer's installaion instructionsElectrical$67,125—issued202505196806
Mar 27, 2025otc alterations permit: 42nd/f, ste 4200: ref to t.i. pa# 202412187066. mechanical & electricalElectrical$30,000—Finaled Jun 12, 2025202503242867
Mar 27, 2025otc alterations permit: 35th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234Electrical$200,000—Finaled Mar 18, 2026202503192542
Mar 27, 2025otc alterations permit: 34th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234Electrical$200,000—Finaled Mar 18, 2026202503192541
Feb 12, 2025otc alterations permit: 19/f - fire alarm as built. 1 duct detector and relay module was removed for fcu-2 as it never existed. 1 smoke detector added to idf room. ref f/a permit 202412247370Heating and cooling$720—Finaled Feb 14, 2025202502110104
Feb 7, 2025otc alterations permit: 42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittalsPlumbing$250,000—Finaled Jul 1, 2025202412187060
Feb 4, 2025otc alterations permit: mechanical and electrical work ref 2024.1121.5485Electrical$105,000—Finaled Mar 26, 2025202501238929
Dec 26, 2024additions alterations or repairs: 17th fl ref pa #202407267324 fire alarm 1 remote power supply, 28 speakers strobes, 27 speakers, 12 strobes, 37 smoke detectors, 9 duct detectors, 15 relay modules, 1 monitor module to be added to provide proper coverageHeating and cooling$123,562—Finaled Jan 27, 2025202410304044
Dec 24, 2024otc alterations permit: 19th floor. fire alarm: 11 smoke detectors, 2 duct detectors, 4 relay modules, 14 speaker strobes, 1 speaker, 13 should be added to provide proper coverage. pa#: 202410112776Heating and cooling$37,206—Finaled Feb 14, 2025202412247370
Dec 10, 2024otc alterations permit: ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018Electrical$11,000—Finaled Mar 18, 2025202412056238
Nov 25, 2024additions alterations or repairs: 18th fl ref pa #202408027822 fire alarm 1 remote power supply, 28 speakers strobes, 29 speakers, 9 strobes, 32 smoke detectors, 6 duct detectors, 12 relay modules, 2 monitor module to be added to provide proper coverageHeating and cooling$14,000—Finaled Jan 27, 2025202410304047
Nov 22, 2024otc alterations permit: 19th floor: relocate 16 pendents, repipe existing 37 drops with pendents to uprights, add 11 uprights. ref to t.i. 202410112776Plumbing$37,900—Finaled Mar 26, 2025202411225574
Nov 8, 2024otc alterations permit: rev to pa# 2024-0802-7822: new private office and conversion of flex rooms to private offices plus mehanical lighting and electric. 18th flElectrical$19,272—Finaled Mar 7, 2025202410253712
Sep 30, 2024otc alterations permit: scope of work includes bringing restroom and hines.com drinking fountains on the 20th fl. to full accessiblity compliance demo of restrooms partitions, finishes and plumbing fitures to be replaced with new mep and fire safety and sprinkler system modifications will be defferredPlumbing$375,000—Finaled Jan 28, 2025202408209067
Sep 18, 2024otc alterations permit: fire alarm 2 call stations2 power supply 48 smoke detectors, 11 duct detectors, 2 monitor modules, 13 relay modules, 40 ceiling speaker strobes, 1 ceiling speaker, 33 ceiling strobes to be added to proved proper covarage ref pa# 2024-0514-2058Heating and cooling$146,325—Finaled Feb 19, 2025202409050088
Sep 18, 2024otc alterations permit: 21/f: fire alarm- 1 remote power supply, 31 ceiling speaker strobes, 2 wall speaker strobes, 8 ceiling strobes, 32 smoke detectors, 10 duct detectors, 13 relay modules, 1 control module, and 1 monitor module to be added. ref pa# 202406053739Heating and cooling$104,221—issued202407257256
Sep 17, 2024otc alterations permit: fire alarm: 2 smoke detectors, 3 duct detectors, 5 relay modules, 4 ceiling speaker strobes, 5 ceiling strobes to be added to provide proper coverage. ref#: 202407267334Heating and cooling$6,000—Finaled Dec 17, 2024202409160866
Jul 30, 2024otc alterations permit: bring restroos and drinking fountains on 17th fl to full accessibility compliance. demo of restroom partitons, finishes, plumb fixt. to be replaced w new. mep, ls/sprinkler deferred. permit shall provide apprd docs to show restroom/drking fountain full complaince for future ti's 17th flPlumbing$140,000—Finaled Jan 31, 2025202407166566
Jul 29, 2024otc alterations permit: 25th fl - revision to pa 202310199039 electrical/lighting for ti ref pa 20221228954/202403016889Electrical$1—Finaled Feb 12, 2025202407267334
Jun 17, 2024otc alterations permit: 26th:renovation of full floor existing b occupancy space proposed tenant improvement work includes demo of interior non structural partitions, ceilings, lighting & finishes. construction of new non load bearing partitions, mech,plumb, elec and communciation,ceiling systems with new lighting,flooringPlumbing$3,456,280—Finaled May 5, 2025202405142058
Jun 12, 2024otc alterations permit: ground floor: demo of walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atmPlumbing$305,636—Finaled Aug 13, 2024202405152153
Jun 6, 2024otc alterations permit: 17/f: interior demo of non-structural elements including but limited to int. partitions, doors, finishes, ceilings, lighting, mech and electrical outlets. per admin. bulletin ab107: occupancy/exiting to be addressed under separate permit, f/s & l/s to remain operational, p.o.t/accessibility scope isElectrical$190,000—Finaled Aug 29, 2024202405021242
Jun 3, 2024sign - erect: 2 electric wall sign "citizens"Electrical$15,000—Finaled Jan 16, 2025202405303252
Jan 18, 2024otc alterations permit: basement level 1 and 2: extg fire sprinkler system. t.i. ev -charging areas. 94 sprnklers. - installation for ev charger coverage, installed under electrical permit, not required at the time of ev charger install. ref elec pn: 202301128317Electrical$59,000—issued202401103704
Nov 9, 2023otc alterations permit: ste 2870: scope of work on the 28th fl consists of interior demolition of non-structural elements including-interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlet switchesElectrical$270,000—Finaled Apr 8, 2024202310058086
Nov 8, 2023otc alterations permit: 30/f: mechanical/electrical, ref bpa#202308295499Electrical$170,000—issued202310209089
Oct 24, 2023otc alterations permit: 9/f: electrical for restroom upgrades, ref bpa#202211106261Electrical$20,000—issued202310199069
Oct 24, 2023otc alterations permit: 8/f: electrical for restroom upgrades, ref bpa#202309206978Electrical$20,000—issued202310199067
Oct 24, 2023otc alterations permit: 25/f: mechanical/electrical for t.i., ref bpa#202212228954Electrical$150,000—Finaled Feb 12, 2025202310199039
Oct 19, 2023otc alterations permit: 25/f: mechanical/electrical for restrooms, ref bpa#202211106261Electrical$14,620—Finaled Feb 19, 2025202310199040
Oct 19, 2023otc alterations permit: 28/f: mechanical and electrical work for tenant improvement on the 28th fl ref 202212218831Electrical$75,000—Finaled Feb 16, 2024202310188952
Sep 22, 2023otc alterations permit: 8/f: bring restrooms & drinking fountains to full compliance. demo of rr partitions, finishes & plumbing fixtures to be replaced w/new mech, elec, l/s & sprinkler system modification will be deferred submittals. this permit shall provided stamped docs to show restrooms & drinking fountains full compPlumbing$125,000—Finaled Feb 16, 2024202309206978
Sep 15, 2023otc alterations permit: project scope consists of bringing restrooms and drinking fountains on floors 9,14 and 25 to full compliance. demolition of restrooms, partitions, finishes, and plumbing fixture to be replaced with new. me, fire alarm/sprinklers under sep permitsPlumbing$140,000—Finaled Feb 8, 2024202211106261
Aug 16, 2023additions alterations or repairs: 7th fl: 1 power supply, 23 smoke detectors, 9 9 duct detectors, 1 control module, 12 relay modules, 20 ceiling speaker strobes, 7 ceiling strobes,6 ceiling speakersHeating and cooling$76,215—Finaled Aug 28, 2023202306301340
Jan 30, 2023additions alterations or repairs: modification to fire alarm system. pyro-comm systems, inc. will design & provide following material remote power supply, smoke detectors (smoke detector in common area to match bldg design) duct detectors, relay modules, ceiling speaker/strobe, ceiling strobeHeating and cooling$19,000—Finaled Feb 10, 2023202301180339
Jan 5, 2023otc alterations permit: fire alarm as builts to show 4 added wp wall speaker strobes, 1 added wall speaker strobe, deleted 1 duct detector and relay for ac-r-1 5 deleted smoke detectors made new smokes existing show heat in elevator equipment room as ref pa 2022-0504-3525Heating and cooling$1—Finaled May 3, 2023202301059694
Dec 22, 2022additions alterations or repairs: 7th floor:modification to fire alarm system.1 new power supply.,29 smoke detectors,4 duct detectors,1 monitor module,6 relay modules,28 ceiling speaker strobes,12 ceilings strobes & 1 ceiling speaker.two way communication will be provided in the passenger elevator pyro-comm systems, incHeating and cooling$45,000—issued202209192719
Dec 13, 2022otc alterations permit: 5th/flr: as builts fire alarms & two way communication systems- to reflect field markups as well as 1 added speaker strobe, 2 relay modules for av shutdown, 1 relay module for global from control shutdown, deleted 2 duct detectors to used area smoke for coverage, corrected 3 smoke detectorsHeating and cooling$1—Finaled Jan 13, 2023202212138192
Dec 13, 2022otc alterations permit: 3rd/flr: as built fire alarms - 3 relays were added to 3 fsd. changed 3 smoke dectors from new to existing. changed new remote power supply to existing. shows existing av shutdown relay. shows existing relay for door holders. delete 1 duct detector and used area smoke. pa ref # 2022-0419-2548Heating and cooling$1—issued202212138189
Nov 10, 2022otc alterations permit: 15th, 18th, 19th fl: electrical for pa# 202204011344Electrical$22,500—Finaled Jan 17, 2023202211106297
Sep 15, 2022otc alterations permit: 7/f: mechanical, electrical & plumbing for t.i. ref bpa#202208231049Plumbing$195,000—Finaled Sep 12, 2023202209152536
Aug 24, 2022otc alterations permit: suite 3240: title 24 electrical compliance. ref t.i. pa202111031723Electrical$35,000—Finaled Nov 7, 2022202208080062
Aug 24, 2022otc alterations permit: suite 2710: title 24 electrical compliance. ref t.i. pa202109218877Electrical$35,000—Finaled Dec 2, 2022202208080061
Aug 9, 2022otc alterations permit: mechanical, electrical, plumbing for tenant improvement on 2nd fl. ref 202207219014, 202201286897Plumbing$195,000—Finaled Mar 22, 2023202208019621
Jul 29, 2022otc alterations permit: floors 15, 18, 19 restrooms: bring restrooms and drinking fountains to full compliance per ab-056.demo of rr partitions, finishes & plumbing fixtures to be drelace with cn. scope for each floor identical.mech,elec,life safety and f/s mods will be defered and sep permPlumbing$240,000—Finaled Jan 17, 2023202204011344
Jul 20, 2022otc alterations permit: 31st fl: modification to fire alarm system. 4 smoke detectors will be relocated and 1 new smoke detector will be added. relocate 2 duct detectors and add 1 new duct detector . 2 ceiling strobes, 1 relay module, and 7 new ceiling speaker strobes to be added for coverage. ref pa# 202206136181Heating and cooling$4,000—Finaled Jan 6, 2023202207208914
May 4, 2022otc alterations permit: roof & elevator- modification of fire alarm system. 8 smoke detectors, 1 duct detector, 1 monitor module, 5 relay modules, and 2 firefighter phone jack. ref pa# 202106283370Heating and cooling$12,000—Finaled Apr 28, 2023202205043525
May 3, 2022additions alterations or repairs: 4th floor:1remote power supply.44smoke detectors,17 duct detectors,1 monitor modules,19relay modules,1control module,2 monitor module,53ceiling speaker/strobe,2wall speaker/strobe,29ceiling mount strobe ,11 ceiling speaker:ref bpa# 202110180645Heating and cooling$123,039—Finaled Aug 29, 2022202204192551
May 3, 2022additions alterations or repairs: 3rd floor:1remote power supply.53smoke detectors,13 duct detectors,3 monitor modules,15relay modules,1control module,2 monitor module,52ceiling speaker/strobe,2wall speaker/strobe,1ceiling weatherproof speaker/strobe ,32 ceiling strobes, 10 ceiling speakers:ref bpa# 202110180645Heating and cooling$122,300—Finaled Sep 2, 2022202204192548
Apr 21, 2022otc alterations permit: relocate 13 sprinklers around new stair @ level 7 & roof & relocate roof standpipe to opposite corner; ref pa 202106283370Roofing$15,000—Finaled May 3, 2023202204212672
Apr 14, 2022otc alterations permit: 7th floor: mechanical, electrical and plumbing for t.i. ref arch #202201286894. 1 new fsd. fire alarm and sprinkler under sep permitsPlumbing$1—Finaled Jan 31, 2023202204142221
Mar 23, 2022otc alterations permit: 32nd floor addition of non-structural partition to separate an existing tenant into 2 spaces. suite 3250. minor electrical, finish & mech changesElectrical$75,000—issued202203230688
Feb 28, 2022otc alterations permit: 44/f: add 12 fire sprinklers, relocate 22 & change out 6 fire spirnkler heads per t.i. pa202112023570. job# 22-604Heating and cooling$12,600—Finaled Apr 18, 2022202202248615
Feb 11, 2022additions alterations or repairs: modifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layerRoofing$4,669,527—Finaled May 16, 2023202106283370
Feb 1, 2022otc alterations permit: mechanical & electrical and plumbing for tenant improvement on 3rd fl. ref arch pa# 202109077816Plumbing$600,000—Finaled Dec 1, 2022202201125839
Jan 18, 2022sign - erect: install two electric,wall,single faced new signs 4'x13' each. sets face/halo illuminated letters "chime" b.1 & b.2Electrical$10,500—Finaled Dec 13, 2022202111041833
Jan 18, 2022sign - erect: install two electric, wall, single faced new signs 6'x19.5' each. face/halo, illuminated letter "chime" a.1 & a.2Electrical$16,500—Finaled Dec 13, 2022202111041832
Jan 12, 2022otc alterations permit: fire alarm, lobby: addition of voice/alarm comm system cfc907 nfp72 and ahj. 11 smoke detectors, 5 duct detectors, 1 heat detector, 1 monitor modules, 10 relay modules, 8 celing speakers strobes & 1 wall speaker stobe to be added; ref pa# 2020-0619-8935; fitness ctr fa/ti on ll2Heating and cooling$21,741—Finaled Apr 14, 2023202111172598
Jan 12, 2022otc alterations permit: clubhouse: fire alarm 23 smoke detectors, 2 duct detectors, 14 ceiling speaker strobes, 3 ceiling strobes to be added to e facuHeating and cooling$28,173—Finaled Jan 23, 2024202110120256
Dec 15, 2021otc alterations permit: 44th flr - bxc/dci suite - new partitions, ceilings, lighting, finishes, electrical and mechanical for a partial flr t.i. structural limited to headers, framing and monitor walls. fire alarm/sprinkler deferredElectrical$95,000—issued202112023570
Dec 1, 2021otc alterations permit: 8/f: hvac & electrical modifications for new elevator and stairsHeating and cooling$11,000—Finaled May 16, 2023202108267226
Nov 17, 2021otc alterations permit: 5 duct detector and 5 relay modules to be added to provide proper coverage to existing facu; ref pa# 2020-0619-8935; mechanical fa/ti on ll2Heating and cooling$10,565—cancelled202110120259
Nov 16, 2021otc alterations permit: 5/f: mechanical, electrical and plumbing for t.i. on 5/f. ref: 202109278805Plumbing$800,000—Finaled Dec 19, 2022202110261176
Nov 15, 2021otc alterations permit: 4th floor: mechanical, electrical and plumbing for t.i. ref app#202109289283Plumbing$750,000—Finaled Dec 19, 2022202111011553
Nov 10, 2021otc alterations permit: 27/f suite 2700: t.i to reduce sq. ft of training room to create a small team room. minor demolition and construction. suite entry/egress doors and egress paths to remain. minor mechanical and electrical. scope on a-101. fire alarm/sprinkler/emer lighting on sep permitsElectrical$280,480—Finaled Aug 10, 2022202110251096
Oct 26, 2021otc alterations permit: 6th floor: mechanical, electrical, and plumbing for t.i. . ref app#202109148385Plumbing$1,800,000—Finaled Jan 18, 2023202110150574
Oct 19, 2021otc alterations permit: rev to pa 202006198935 canopy drain gutters amd plumbing drains and plazaPlumbing$1—Finaled Jun 27, 2023202110150579
Aug 26, 2021otc alterations permit: modify & replace existing windows washing davits for new window washing eq. modify/replace guardrails at 8th level roofRoofing$20,000—Finaled May 16, 2023202108236918
Jul 22, 2021otc alterations permit: modification to an existing fire alarm system, including two way comm. system. 24 smoke detectors, 6 duct detectors, 1 control module, 3 strobes, 8 relay modules, 37 speaker strobesHeating and cooling$31,935—Finaled Nov 10, 2021202106031571
Jul 13, 2021otc alterations permit: 32nd fl: modification to an existing fire alarm system, including two way comm. system. 10 smoke detectors, 9 duct detectors, 11 relay modules, 1 monitor module, 6 strobes, 18 speaker strobesHeating and cooling$25,521—Finaled Oct 20, 2021202106031574
Jun 30, 2021otc alterations permit: 5th, 6th, 7th floors: bring restrooms and drinking fountains to full compliance per ab-056. replace restroom partitions, finishes and plumbing fixturesPlumbing$98,000—issued202104168782
May 26, 2021otc alterations permit: 44th fl electrical only permit to remove various electrical elements from the scope. ref 202008282894, 201912058796Electrical$1—issued202105251006
Jan 12, 2021otc alterations permit: 18th flr, suite 1800: 606 sq ft of upgrade. demo walls & doors, relocate lighting fixtures, partition & door. mechanical & electrical included. life safety & sprinklers no included in this permit. ref pa 201406259433 is for 12th floorElectrical$80,000—Finaled Mar 19, 2021202011249622
Dec 30, 2020otc alterations permit: 37/f: selected demo of non-load bearing walls & ceiling systems. new finishes and electrical throughout. mep deffered. maher n/aElectrical$480,000—Finaled Jun 3, 2021202009265050
Oct 30, 2020otc alterations permit: revision to pa 202008051155 - electrical only for flrs 28, 29 & 32Electrical$80,000—Finaled Nov 18, 2020202009295386
Aug 29, 2020otc alterations permit: 28th,29th and 32nd floors: barrier removal only. demo of restroom accessible stall partitions. finishes & plumbing fixtures to be replaced with new identical work scope area occurring in restroomsPlumbing$98,000—Finaled Nov 17, 2020202008051155
Jan 8, 2020otc alterations permit: 15th fl - ti including construction of new non-load bearing full height demising wall for new sublease suite. minor mechanical & plumbing to be altered a required by new partitionPlumbing$100,000—issued201912200103
Oct 15, 2019otc alterations permit: 23rd fl. non structural intertior t.i. partitions, finishes, casework, mechanical,& elec, plumbing to tie into building utilitesPlumbing$3,311,336—Finaled Aug 17, 2020201907317429
Oct 15, 2019otc alterations permit: 22 fl. non structural intertior t.i. partitions, finishes, casework, mechanical,& elec, plumbing to tie into building utilitesPlumbing$3,311,336—Finaled Aug 17, 2020201907317426
Sep 5, 2019otc alterations permit: 27th flr electrical work for bathroom only ref 201908078181Electrical$88,000—Finaled Nov 8, 2019201909050770
Aug 28, 2019otc alterations permit: 42nd fl mechanical and electrical for 201907014746 suite 4200 maher not reqElectrical$50,000—Finaled Oct 22, 2019201908078184
Apr 17, 2019otc alterations permit: 46th floor tenant improvement: to include new non load bearing partitions. glazing doors, millwork, lighting and associated electrical mep. fire alarm/ sprinklers under separate paerit submittalElectrical$850,000—Finaled Oct 11, 2019201904036983
Apr 12, 2019otc alterations permit: 1st floor: add 0, relocate 0, change out 11 and plug 1 sprinkler to conform with new wall/ceiling layout of t.i. demo. n/a for maherHeating and cooling$2,535—Finaled Apr 15, 2019201904127909
Apr 4, 2019otc alterations permit: selective demo of non load bearing partitions, ceiling, light fixture, millwork, plumbing and finishes. ste 150Plumbing$23,235—Finaled Apr 19, 2019201903074660
Sep 27, 2018otc alterations permit: ste 800: mechanical hvac - extend existing lowside duct to match new added private office. ref #201808288508. maher naHeating and cooling$15,000—Finaled Dec 7, 2018201809271538
Sep 19, 2018otc alterations permit: 15th flr - electrical work only for ti. adding power to work stations maher naElectrical$5,000—issued201809180595
Aug 29, 2018otc alterations permit: suite 800. tenant improvements, add 3 new provate offices to tenant space, new electrical outlets. maher n/a electrical, mechanical, data, life safety under separate permitElectrical$90,599—Finaled Dec 7, 2018201808288508
Jul 10, 2018otc alterations permit: ti includes add 2 duct detectors to exissting fa systems for two new meat pumpsHeating and cooling$3,200—Finaled Jan 18, 2019201807104041
Apr 16, 2018otc alterations permit: 16th - add 11 smk det, 9 speaker/strobes. replace 16 discontinyued ion smk det with new photoelectric in location, 1 disconnected ion duct det with photoelectric in same location ref 201803134065 maher naHeating and cooling$25,000—Finaled Jun 4, 2018201804166389
Apr 3, 2018otc alterations permit: ion duct detectors with photo electric smoke and duct detectors, as built drawings for 201712085905Heating and cooling$48,000—Finaled Apr 4, 2018201804035331
Apr 3, 2018otc alterations permit: ti for elevator upgrade: add 7 replay modules to existing fa system; replace 9 discontinued ion smoke detectors and 2 duct detectors with new photoelectric detectors. adding flashing helmet, in the elevator equipment room on ground, 16, 28, 38. 47 and penthouseHeating and cooling$15,000—issued201804035303
Dec 8, 2017otc alterations permit: 40/f: ti includes: add 21 shore detectors, 14 strobes, 5 speakers, 24 speaker/strobes, 2 addresable relays, 1 control relay to f/a system; replace 9 discontiuned ion smoke detctors, 2 ion duct detectors with photoelectrive smoke and duct detectors. ref t.i.201709117597 maher n/aHeating and cooling$48,000—Finaled Apr 4, 2018201712085905
Oct 27, 2017otc alterations permit: partial 17th flr t.i. - demolition of offices. new construction is converting offices into open office area & converting conference rooms into new offices, includign partition, doors, millwork, mechanical, electrical & plumbing. no structural work to be performed. n/a maher ordinancePlumbing$180,000—Finaled Jan 30, 2018201710171441
Sep 27, 2017otc alterations permit: add 30 smoke detectors, 27 speaker/strobes; 16 strobes; 9 speakers to fire alarm system; replace 9 ion smoke detectors with photo smoke detectors, 2 ion duct detectors with photo duct detectors. ref pa 2017-0612-9000Heating and cooling$45,000—Finaled Dec 26, 2017201709279650
Sep 18, 2017otc alterations permit: 40th fl interior tenant improvement, including mech, elec, plumbing engineering drawings. sprinklr design & fire alarm sep permitPlumbing$2,000,000—Finaled Apr 20, 2018201709117597
Sep 12, 2017otc alterations permit: 48th floor - to dajust mechanical & electrical. ref pa #201609208164 & 201610069651. n/a maher ordinanceElectrical$1—Finaled Sep 5, 2018201709127692
Aug 28, 2017otc alterations permit: 17th fl: electrical and lighting only. provide new lighting and branch circuits to existing panel. t-24. maher naElectrical$17,000—issued201708286138
Aug 28, 2017otc alterations permit: 18th fl: electrical and lighting only. provide new lighting and branch circuits to existing panel. maher naElectrical$17,000—issued201708286137
Aug 28, 2017otc alterations permit: 32nd fl: electrical and lighting only. provide new lighting and branch circuits to existing panel. maher naElectrical$17,000—issued201708286135
Aug 28, 2017otc alterations permit: 11th fl: electrical and lighting only. provide new lighting and branch circuits to existing panel. maher naElectrical$17,000—issued201708286132
Aug 28, 2017otc alterations permit: 25th fl: electrical and lighting only. provide new lighting and branch circuits to existing panel. maher naElectrical$17,000—issued201708286130
Aug 23, 2017otc alterations permit: 38th fl-add smoke detectors, speakers/strobes, ceiling mounting strobes, relay module and control relay to fire alarm system. replace ion smoke detectors with photo smoke detectors, ion duct detectors with photo duct detectors. 39th fl-add smoke detectors, speaker, spHeating and cooling$90,000—issued201708235617
Jun 28, 2017otc alterations permit: 38th floor tenant improvement to include new non-load bearing partitions, mechanical, electrical & plumbing, ceiling & lighting & finishes. n/a maher ordinance. alarm/sprinkler deferredPlumbing$2,000,000—issued201706270453
Jun 28, 2017otc alterations permit: 39th floor tenant improvement to include new non-load bearing partitions, mechanical, electrical & plumbing, ceiling & lighting & finishes. n/a maher ordinance. alarm/sprinkler deferredPlumbing$1,500,000—Finaled Feb 22, 2018201706270451
Dec 21, 2016otc alterations permit: 48th fl: fa ti includes: add 29 smoke detector, 2 duct detectors, 1 dual monitor module; 2 relay modules, 2 control relay, 8 speakers, 27 speaker/strobes and 18 strobes to fa system. ref 2016-0920-8164Heating and cooling$53,000—Finaled Mar 29, 2017201612144883
Dec 7, 2016otc alterations permit: 47nd flr: add 16 smoke det, 19 speaker/strobes, 4 strobes to . replace 16 ion smoke det with photo smoke det, replace 3 ion duct det with photo duct det, 4 old strobes with new maher naHeating and cooling$40,000—Finaled Mar 29, 2017201612074324
Nov 21, 2016otc alterations permit: 47th flr: electrical for 201608306383Electrical$1—Finaled Apr 21, 2017201611021675
Nov 15, 2016otc alterations permit: 48th floor - mechanical and electrical work for ti on the 48th floorElectrical$300,000—Finaled Jun 2, 2017201610069651
Oct 6, 2016otc alterations permit: mechanical and electrical work for ti ref pa 2016-0920-8166and replacing existing fsd. maher naElectrical$300,000—Finaled Jun 2, 2017201610069643
Sep 21, 2016otc alterations permit: 8/f- mechanical and electrical work for ti. ref pa 2016-0819-5465. maher naElectrical$20,000—issued201609087039
Sep 8, 2016otc alterations permit: 30th floor - demo of non-strl partitons, finishes, elec & lighting. construction of non-strl partitions, doors/frames/hardware. elec. fixtures, lighting, plumbing, mech. mep under separate permit. life safety, fire sprinkler, fire alarm under separate permitPlumbing$192,000—Finaled Nov 3, 2016201608195564
Aug 10, 2016otc alterations permit: 46th flr: add 36 smoke detectors, 3 duct detectors housing, 3 manual pull stations, 2 dual monitor modules 16 speakers, 22 speaker/strobes; 20 strobes, 2 sync modules. 2 relays modules, 2 relay, replace 3 smoke detectors. maher naHeating and cooling$66,961—Finaled Sep 2, 2016201608104657
Jul 6, 2016otc alterations permit: suite # 1550:reuse 15th floor air handler & duct mains. provide new duct diffusers & thermostats. provide inline transfer fan for it closet. ref pa 2016-0428-5954. maher naHeating and cooling$1—issued201606220629
Mar 16, 2016otc alterations permit: modify hvac, electrical & lighting systesm to accomodate new office and conference room. title 24 compliance. ref t.i. pa#2016-0217-9789Heating and cooling$58,000—issued201603081527
Mar 7, 2016otc alterations permit: basement: mechanical & electrical for ref pa 2015 1207 4309 maher naElectrical$80,000—Finaled Apr 22, 2016201603071307
Jan 21, 2016otc alterations permit: electrical work for suite 3125; ref ti 2015-0902-5880Electrical$45,000—Finaled Apr 21, 2016201601217561
Dec 16, 2015otc alterations permit: added finish & electrical scope to permit 2015-1014-9646. maher naElectrical$7,500—issued201512155152
Nov 23, 2015otc alterations permit: barrier removal only. demo of restroom stall partitions. new restroom partitions and plumbing fixtures. compliance with maher ordinance no 155-13 not requiredPlumbing$63,000—Finaled Feb 26, 2016201511193124
Nov 19, 2015otc alterations permit: 33rd flr: mechanical & electrical work for tenant improvement, ref. pa 201509298275; maher n/aElectrical$750,000—Finaled Feb 16, 2016201511182936
Oct 21, 2015otc alterations permit: 9/f: refresh of finishes to elevator lobby & common hallway to include new carpet, paint base suspended ceiling. electrical under separate permit. compliance with maher ordinance no 155-13 not requiredElectrical$105,000—issued201508204817
Jul 31, 2015otc alterations permit: 23rd flr: t.i. includes demo of non-structrual partitions & build non structural partitions.all new or revised hvac,elec,plmbg & l/s work will be design build & submitted separately. ; maher n/aHeating and cooling$50,000—Finaled Sep 21, 2015201507292769
Jul 28, 2015otc alterations permit: 31st floor: electrical work for t.i. ref app#201506088340. n/a on maherElectrical$31,665—Finaled Oct 5, 2015201507232220
Jun 9, 2015otc alterations permit: 31st floor - refresh of finishes to elevator lobby & common hallway. scope includes new carpet paint, base & susp ceiling, lighting/electrical to be under separate permit. n/a maher ordinanceElectrical$150,000—Finaled Oct 5, 2015201506088340
Jun 2, 2015otc alterations permit: suite # 2940: new non-rated partitions, doors finishes. mechanical and electrical included. life safty and fire sprinkler under seperate permit. n/a for the maherElectrical$194,000—Finaled Mar 11, 2016201505075658
May 21, 2015otc alterations permit: 32nd flr: ti- includes non-structural demo of finishes, construction to include new partitions, finishes. lighting, hvac, elect, plumb and equip not in scope of work. ref pa 1346253Heating and cooling$925,000—Finaled Feb 4, 2016201505196719
Apr 15, 2015otc alterations permit: tenant improvement on the 31st fl including new partitions, doors, glazing, ceilings, finishes, associated mep inlcuding new duct work and lighting. life safety under separate permitHeating and cooling$1,670,000—Finaled Jan 13, 2016201504143609
Feb 26, 2015otc alterations permit: 26th floor:new lighting and power: new hvac ducting. ref arch #201406249210. n/a for the maher ordinance #155-13 note: fire sprinklers and life safety on separate permits)Heating and cooling$770,000—Finaled Aug 26, 2015201406269513
Feb 11, 2015otc alterations permit: 45th floor:new lighting and power. new hvac ducting. arch ref# 201406269510 not issued yet. n/a for the maher ordinance #155-13- sprinklers and fire alarm separate permitsHeating and cooling$77,000—Finaled Aug 25, 2015201406269511
Feb 5, 2015otc alterations permit: mechanical and electrical work for tenant improvement on the 43rd floor. referenced ti 2015.0113.5557Electrical$300,000—Finaled Dec 2, 2015201501135558
Jan 14, 2015otc alterations permit: 32/f: ti for "blackstone" including non structural demo of finishes. to include new partitions, finishes, lighting, hvac elec, plumbing, and equipment. f/a and sprinklers under separate permitHeating and cooling$925,000—Finaled Feb 4, 2016201501145728

On California St

1,703 permits on record on California St.

TradePermitsSince Oct 6, 2024Median declaredRangeLast
Roofing30551$22,000$8,978–$198,000Jul 20, 2026
Electrical535104$100,000$3,000–$785,000Sep 23, 2026
Heating and cooling51370$33,865$1,470–$385,794Sep 21, 2026
Plumbing32760$90,392$3,450–$747,457Oct 1, 2026
Solar144—under 5May 7, 2026
Water heater93—under 5Sep 4, 2026

Roof replacement cost in San Francisco

Across 5,872 one- and two-family reroof permits since October 6, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 293 one- and two-family heating and cooling permits since October 6, 2024, most declared values run from $21 to $223,693 (the middle 80%); the median is $25,996 and half fall between $5,000 and $120,000. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 6, 2026. Owner names are not shown on any page.