150 California St, San Francisco
23 home-service permits on record at 150 California St, San Francisco; the roof was last permitted on Jun 24, 2026 at a declared value of $198,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Jun 24, 2026 | otc alterations permit: replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse | Roofing | $198,000 | — | issued | 202606243787 |
| Jun 9, 2026 | otc alterations permit: deferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring | Electrical | $121,554 | — | Finaled Jun 26, 2026 | 202604229880 |
| Jun 9, 2026 | otc alterations permit: 6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate thermostat | Heating and cooling | $39,186 | — | Finaled Jun 26, 2026 | 202604229872 |
| Apr 22, 2026 | otc alterations permit: 9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocated thermostats ref pa 202602175990 | Heating and cooling | $31,700 | — | Finaled Jun 26, 2026 | 202604229868 |
| May 29, 2025 | otc alterations permit: 8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086 | Heating and cooling | $83,680 | — | Finaled Sep 15, 2025 | 202505075944 |
| Nov 13, 2024 | otc alterations permit: work on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical deferred | Electrical | $1 | — | Finaled Jan 17, 2025 | 202410163090 |
| Sep 26, 2024 | otc alterations permit: 22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred | Plumbing | $228,339 | — | Finaled Jan 28, 2025 | 202408309800 |
| Aug 15, 2024 | otc alterations permit: ste: 300 ref pa # 2024-0531-3389 deferred mechanical & electrical | Electrical | $175,000 | — | Finaled Nov 20, 2024 | 202407267360 |
| Jul 6, 2023 | otc alterations permit: 11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926 | Heating and cooling | $175,000 | — | Finaled Oct 20, 2023 | 202306291139 |
| Mar 9, 2023 | otc alterations permit: 20/f ste# 2000: modification of existing life safety system, ref pa# 202210134259, install new 2-speakers and 8-strobes, install new 3-fire smoke dampers, 3-addressible output module and 1-duct mounting plate, relocation of existing speakers and strobes | Heating and cooling | $16,500 | — | issued | 202303093360 |
| Jun 24, 2021 | otc alterations permit: 1st fl: install new duct smoke detector and relay module for activation of new fire smoke damper to pa 202101213050 | Heating and cooling | $2,500 | — | issued | 202106243127 |
| Feb 22, 2021 | otc alterations permit: install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683 | Heating and cooling | $28,404 | — | Finaled Aug 16, 2021 | 202101213050 |
| Aug 21, 2020 | otc alterations permit: revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture | Electrical | $41,000 | — | Finaled Sep 30, 2020 | 202007019486 |
| Jul 3, 2019 | otc alterations permit: demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep permits n/a maher | Plumbing | $181,548 | — | Finaled Sep 3, 2020 | 201907014790 |
| Jul 3, 2019 | otc alterations permit: 8th flr. demo of non-structural walls, plumb and ceiling systems. construct tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be design-build under separate permits | Plumbing | $304,876 | — | Finaled Sep 30, 2020 | 201905080066 |
| Feb 6, 2018 | otc alterations permit: electrical revisions & title 24 electrical for ref 201801199043; n/a maher | Electrical | $12,000 | — | issued | 201802060437 |
| Mar 17, 2017 | otc alterations permit: t-24 electrical to provide new lighting and power to 17th flr, ti ref pa 201612306307 | Electrical | $8,745 | — | Finaled Apr 7, 2017 | 201703101230 |
| Feb 22, 2017 | otc alterations permit: 16th floor - revision to 201611303811 to indicate door hold opens on electrical plan per inspector comment | Electrical | $1 | — | Finaled Mar 20, 2017 | 201702219790 |
| Jan 31, 2017 | otc alterations permit: 23rd floor: t-24 electrical for work done under app#201611223335. n/a for maher | Electrical | $1 | — | Finaled Mar 9, 2017 | 201701278080 |
| Dec 5, 2016 | otc alterations permit: 16th floor: title 24 mechanical, electrical to install new exhaust fan, lighting and power, relocate diffusers and thermostats. please refer to app#2016-0831-6455. n/a maher | Electrical | $190,000 | — | Finaled Mar 20, 2017 | 201611303811 |
| Aug 16, 2016 | otc alterations permit: 1/f- install one new heat pump for supplemental cooling. n/a ordinance #155-13 | Heating and cooling | $30,000 | — | Finaled Feb 9, 2017 | 201608165086 |
| Nov 16, 2015 | otc alterations permit: 18th floor: mechanical work-modification of hvac systems-addition of vav box w/controls air balance. building pa 2015-1002-8676. maher na | Heating and cooling | $12,000 | — | Finaled Apr 22, 2016 | 201511132553 |
| Apr 10, 2015 | otc alterations permit: interior office t.i. mechanical and electrical work. ref app#201501095292. n/a for the maher | Electrical | $78,000 | — | Finaled Jun 25, 2015 | 201504103299 |
On California St
1,703 permits on record on California St.
| Trade | Permits | Since Oct 6, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 305 | 51 | $22,000 | $8,978–$198,000 | Jul 20, 2026 |
| Electrical | 535 | 104 | $100,000 | $3,000–$785,000 | Sep 23, 2026 |
| Heating and cooling | 513 | 70 | $33,865 | $1,470–$385,794 | Sep 21, 2026 |
| Plumbing | 327 | 60 | $90,392 | $3,450–$747,457 | Oct 1, 2026 |
| Solar | 14 | 4 | — | under 5 | May 7, 2026 |
| Water heater | 9 | 3 | — | under 5 | Sep 4, 2026 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 6, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 293 one- and two-family heating and cooling permits since October 6, 2024, most declared values run from $21 to $223,693 (the middle 80%); the median is $25,996 and half fall between $5,000 and $120,000. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 6, 2026. Owner names are not shown on any page.