Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Dec 13, 2022otc alterations permit: 18 fl: demo int walls and finishes. construct new walls, ceilings, install new plumbing, cabinetry, and appliances. paint and new floor finishes unit 0Plumbing$750,000—Finaled Nov 22, 2024202211096211
Dec 5, 2022otc alterations permit: 7/f-unit 7c: renovation, new architectural partitions, new finishes, new cabinetry, exhaust/mechanical to remain, new electrical wiring & new plumbing fixturesPlumbing$362,000—Finaled Dec 14, 2023202212027624
Mar 29, 2022otc alterations permit: unit 11d: interior remodel. kitchen + baths. kitchen, bath's walls as shown on plan. remove all interior doors, trim, cabinetry, and plumbing fixtures at kitchen, bath's unit 11Plumbing$45,000—Finaled Apr 12, 2023202203291083
Jan 28, 2022otc alterations permit: guest bath remodel: remove old and replace in same location vanity, stovetop, tile, electrical and plumbing fixtures. no structural work unit 16Plumbing$45,000—Finaled Aug 15, 2022202201146031
Jan 14, 2021otc alterations permit: unit 5b: remodel of guest bath & master bath. new plumbing fixtures in existing locations unit 5Plumbing$33,000—Finaled Nov 12, 2021202101142679
Aug 13, 2018otc alterations permit: apt 1g: kitchen remodel to include new cabinets, tile and appliances only. bathroomremodel: new tile and fixtures. no change to electrical or walls. maher n/a unit 1Electrical$40,000—Finaled Apr 17, 2019201808137209
Nov 22, 2017otc alterations permit: #5b: install new tile shower. paint throughout. new kitchen appliances and countertops. no change of layout, no rough plumbing and electrical. maher na unit 5Plumbing$20,000—Finaled Apr 19, 2018201711224680
Oct 16, 2017otc alterations permit: arch renovation of 6th fl unit 6c. new partitions, finishes, cabinetry. existing exhaust and mechanical to remain, new elec wiring and plumbing fixtures. maher n/a unit 6Plumbing$180,000—Finaled Sep 27, 2018201707101338
May 4, 2017otc alterations permit: unit 4b: full remodel of master bathroom, powder room and kitchen , includes new floor throughout,. update plumbing and electrical. no structural work. same layout unit 4Plumbing$22,000—Finaled Apr 17, 2018201705045680
Apr 18, 2017ReRoof: reroofing unit 0Roofing$160,000—Finaled Sep 28, 2017201704184257
May 18, 2015otc alterations permit: kitchen: remove and replace with new plumbing fixtures, outlets, cabinetry and countertops, new stone, tile and paint. bathrooms remove and replace with new plumbing fixtures, outlets, vanities and countertops. new stone, tile & paint. new hardwood floors in living room, dining room unit 9Plumbing$125,000—Finaled Aug 22, 2016201505186525

On Chestnut St

306 permits on record on Chestnut St.

TradePermitsSince Oct 3, 2024Median declaredRangeLast
Roofing15323$20,000$12,160–$79,546Aug 11, 2026
Electrical6721$30,000$3,500–$115,000Jun 2, 2026
Plumbing5713$65,000$7,600–$118,000Aug 19, 2026
Heating and cooling255$7,000$2,060–$86,800May 21, 2026
Water heater31—under 5Feb 10, 2026
Solar11—under 5Apr 6, 2026

Roof replacement cost in San Francisco

Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.