1 Embarcadero Center, San Francisco
102 home-service permits on record at 1 Embarcadero Center, San Francisco; the roof was last permitted on Feb 16, 2024 at a declared value of $500,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Oct 1, 2026 | otc alterations permit: ste 1150 - electrical new light fixtures & associated controls, power & signal. ref pa 202608257086 | Electrical | $297,000 | — | issued | 202609258646 |
| Jun 25, 2026 | otc alterations permit: 5th floor: mechanical & electrical for arch. ref.202605191540. provide and install new van boxes. demo the paneumatic thermostats and install new ddc thermostats | Electrical | $785,000 | — | issued | 202606223600 |
| Jun 24, 2026 | otc alterations permit: 20th/f ste# 2050: ref to t.i. 202604239930: hvac modification to support interior t.i. central equipment is e) to remain | Heating and cooling | $209,000 | — | Finaled Aug 25, 2026 | 202606163301 |
| Jun 23, 2026 | otc alterations permit: 20th floor, suite 2050: deferred electrical: office tenant retrofit: lighting fictures, and associated circuiting/controls, power & signals devices & associated wiring. ref pa# 202604239930 | Electrical | $138,000 | — | Finaled Aug 25, 2026 | 202606163320 |
| Jun 10, 2026 | otc alterations permit: 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit | Plumbing | $2,750,000 | — | issued | 202604109215 |
| Jun 10, 2026 | otc alterations permit: 30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31 | Plumbing | $8,750,000 | — | issued | 202604109211 |
| May 12, 2026 | otc alterations permit: electrical power, lighting, and signal ref 202603238043 | Electrical | $500,000 | — | issued | 202605070854 |
| Apr 9, 2026 | otc alterations permit: 8th fl: consists of non-structural demo and construction of interior partitions, doors, finishes, ceilings, lighting, plumbing, mechanical and electrical switches. mep and fire/life safety deferred submittals. valuation based on ti costs only, mep costs deferred | Plumbing | $2,441,122 | — | issued | 202603238043 |
| Nov 19, 2025 | otc alterations permit: 20th fl, ste 2020 deferred electrical permit ref pa 202509054626 new power & signal devices throughout space; new 2022 title 24 compliant light & controls in new phone room | Electrical | $20,000 | — | Finaled Jan 6, 2026 | 202511199952 |
| Nov 3, 2025 | otc alterations permit: 32nd and 33rd floors: t.i. include the removal of non structural partitions and new non-structural partition, doors millwork and finishes. all new or revised hvac electrical, plumbing and life safety work will be design build and submitted separately | Heating and cooling | $560,000 | — | Finaled May 8, 2026 | 202510217760 |
| Jul 17, 2025 | otc alterations permit: 38th fl: demolition of non structural interior partitions and doors. new construction to include doors, partitions, ceiling, lighting, plumbing finishes. mep, life safety & sprinkler modifications will be submitted as separate permits | Plumbing | $874,993 | — | issued | 202505307558 |
| May 6, 2025 | otc alterations permit: 12th/f: ref t.i. 202502130258. mech & electrical for t.i | Electrical | $700,000 | — | Finaled Dec 2, 2025 | 202504184750 |
| Apr 4, 2025 | otc alterations permit: 12th fl - fire only work for ste 1200 ref pa 202502130258; additions and replacements are 7 smoke detectors, 2 duct detectors, 2 pull stations, 5 modules, 38 speakers, 45 speaker/strobes and 10 strobes | Heating and cooling | $90,000 | — | Finaled Jun 9, 2025 | 202504043698 |
| Feb 26, 2025 | otc alterations permit: interior selective demo of non structural elements including partitons, doors, finishes, ceilings, lighting, mech and elec outlets and switches. new consturction to include doors, partitons, lighting, ceilings, finishes, plumbing. includes rr accessibility upgrades. mep and fire/ls deferred permits | Plumbing | $1,660,000 | — | Finaled Dec 2, 2025 | 202502130258 |
| Oct 31, 2024 | otc alterations permit: 10/f: suites 1010 & 1015: additions are 15 smoke detectors , 4 duct detectors, 2 pull stations, 8 moudules, 27 speakers, 41 speaker/strobe and 6 strobes. ref t.i. 202408088249 | Heating and cooling | $92,160 | — | issued | 202410314081 |
| Aug 16, 2024 | otc alterations permit: 10th floor: shall consist of interior demo of non-structural elements- partitions, doors, finishes, ceilings, lighting, outlets, and switches. new construction includes doors, partitions, ceilings, lighting, plumbing, and finishes, and restroom accessiblity upgrades. mep and fls deferred | Plumbing | $1,221,197 | — | Finaled May 30, 2025 | 202408088249 |
| Feb 16, 2024 | otc alterations permit: modify boiler flue to vent to roof. ref 2019 0306 4499 | Roofing | $500,000 | — | Finaled May 7, 2025 | 202401123870 |
| Feb 15, 2024 | otc alterations permit: ref 202305318934 fire only "as built" permit for the "gibson dunn" remodel on the 27th fl; 1 duct detector added per the actual installation | Heating and cooling | $2,679 | — | issued | 202402155936 |
| Nov 2, 2023 | otc alterations permit: electrical new 2022 title 24 compliant lighting and control ref 202302141996 | Electrical | $8,000 | — | Finaled Feb 27, 2024 | 202311020025 |
| Sep 25, 2023 | otc alterations permit: deferres electrical for 202306230692. new lighting & counter in conference rm: replace wall control for other remains, new power & sigmal devices & associated wiring | Electrical | $30,000 | — | Finaled Nov 7, 2023 | 202309227215 |
| Sep 18, 2023 | otc alterations permit: 25/f: floor consists of minor demo of non-structural interior partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing, and finishes. mep & fls deferred | Plumbing | $1,350,000 | — | Finaled May 13, 2024 | 202309136466 |
| Sep 8, 2023 | otc alterations permit: 26/f gibson dunn: additions are 11-smoke detectors, 10-duct detectors, 4-pull stations, 3-modules, 27-speakers, 34-speaker/strobes, and 5-strobes, ref pa# 202305308849 | Heating and cooling | $95,500 | — | Finaled Feb 28, 2024 | 202309086143 |
| Sep 7, 2023 | otc alterations permit: fire only 2ork for the gibson dunn remodel on floor 27. additions replacement 11 smoke detector, 8 duct detector,3 pull stations, 3 modules, 34 speakers, 37 speaker strobes, 6 strobes, ref 202305318934 | Heating and cooling | $99,320 | — | Finaled Feb 28, 2024 | 202309065969 |
| Aug 21, 2023 | otc alterations permit: 25/f: deferred electrical lighting & mechanical ductwork, ref pa# 2023-0316-3759 | Electrical | $125,000 | — | Finaled Feb 22, 2024 | 202306210470 |
| Aug 7, 2023 | otc alterations permit: 41/f: deferred electrical & mechanical: retrofit lighting fixtures & associated circuting/controls, power & signal devices & associated wiring, install 4-pipe fan coil, duct work for new flr layout. ref pa# 202306089520 | Heating and cooling | $127,000 | — | Finaled Jan 22, 2024 | 202308033624 |
| Aug 7, 2023 | otc alterations permit: unit 2050: mechanical & electrical properties work for t.i. to consist of new terminal units, new ductwork, grilles & diffusers, demo of grilles, difficusers as required, new lighting & controls. new power & signal. ref pa 202305047070 | Electrical | $15,000 | — | Finaled Dec 19, 2023 | 202308013377 |
| Aug 7, 2023 | otc alterations permit: 11th fl. design build ti. demo noin struct partioins, doors, glazing, lighting, plumbing,finishes. replace removed fireproofing w new to maintain e fire ratings. construct new non structural partitions. e ceilig grid to remain. replace damaged parts, new act, lighting, millwork, finishes throughout | Plumbing | $431,538 | — | Finaled Nov 7, 2023 | 202306230692 |
| Jun 21, 2023 | otc alterations permit: 41/f: design build t.i., rr/lobby remodel, demo of nonstructural partitions, doors, glazing, plumbing, vinishes, replace removed fire proofing w/new to match fire ratings, new nonstruc partitions. ceiling grid to remain, new act tiles, lighting, millwork, finishes | Plumbing | $870,830 | — | Finaled Jan 22, 2024 | 202306089520 |
| Mar 29, 2023 | otc alterations permit: interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017 | Plumbing | $230,000 | — | Finaled May 22, 2024 | 202212229027 |
| Feb 23, 2023 | otc alterations permit: #1350 - new power & signal, new title 24. demo duct & hvac equipment, install 5 new reheat vav boxes; install 9 new pneumatic thermostats for perimiter induction units | Heating and cooling | $350,000 | — | Finaled Aug 29, 2023 | 202302141941 |
| Nov 3, 2022 | otc alterations permit: ste 1520: deferred electrical permit only. new copy room with associated lighting/controls and power-signal requirments. new power in break room for point of use water heater and garbage disposal. pa 202208029710 | Water heater | $50,000 | — | Finaled Dec 28, 2022 | 202211025709 |
| Sep 13, 2022 | otc alterations permit: suite 340-350: mechanical & electrical title 24 compliance. ref t.i. pa 202207289448 | Electrical | $199,000 | — | Finaled Dec 19, 2022 | 202209132324 |
| Aug 30, 2022 | otc alterations permit: 3/f: interior ti: demo non structural partitions, new non structural partitions, design build for new or revised hvac, elec, plumbing, l/s | Heating and cooling | $376,000 | — | Finaled Dec 19, 2022 | 202207289448 |
| Jun 22, 2022 | otc alterations permit: 27th fl: demo only permit. ab-017.includes demo of partitions,fixtures, suspended ceiling grid & lights. convert existing fire sprinklers to upright/turn up to return to warm shell condition. ref sprinkler pa# 202206146248. plumbing fixtures under separate permit | Plumbing | $130,000 | — | Finaled Aug 12, 2022 | 202206146290 |
| Apr 22, 2022 | otc alterations permit: 37th fl: fire only work for the "lincoln international" remodel. additions are 7 smoke detectors, 2 duct detectors, 3 pull stations, 5 modules, 41 speaker / strobes, & 3 strobes. ref pa# 202112134280 | Heating and cooling | $39,000 | — | Finaled Jun 9, 2022 | 202204222759 |
| Mar 14, 2022 | otc alterations permit: mechanical install 2 new vav boxes, duct work for new vav redistribution elec-power lighting and signal | Heating and cooling | $180,000 | — | issued | 202203099571 |
| Jan 19, 2022 | otc alterations permit: 7th fl: non-structural demo. non-structutal partitions, finishes, plumbing. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit | Plumbing | $157,000 | — | Finaled Mar 3, 2023 | 202102114449 |
| Sep 8, 2021 | otc alterations permit: t-24 electrical to install new power and data for work stations and new lighting on controls. please see ref app #202107214814 for t.i. permit | Electrical | $10,000 | — | Finaled Nov 16, 2021 | 202109087920 |
| Jul 19, 2021 | additions alterations or repairs: replacement of existing boilers,cooling towers, chillers, associated pumps. reconfigure power distribution based on new equipment electrical requirements. *maher n/a** | Electrical | $5,000,000 | — | expired | 201903064499 |
| Mar 2, 2021 | otc alterations permit: 9th flr - fire alarm system additions and repl of 7 smoke detectors, 5 duct detectors, 1 strobe power supply, 9 modules, 27 speakers, 43 speaker/strobes, 7 strobes and 1 dlc card for the ogletree deakins remodel on floor 9. ref 202010096255 | Heating and cooling | $66,846 | — | Finaled Apr 19, 2021 | 202012020084 |
| Dec 23, 2020 | otc alterations permit: 24/f: install 2 new vav boxes and duct work. move one existing thermostat. reroute control to one existing induction unit | Heating and cooling | $16,500 | — | Finaled Feb 1, 2021 | 202011068427 |
| Sep 17, 2020 | otc alterations permit: fire only work for bike storage remodel on street level. add smoke detectors, duct detectors, pull stations, strobe power supply, speaker/strobes, strobes. ref pa# 201908088265 | Heating and cooling | $29,460 | — | Finaled Jun 10, 2021 | 202009083672 |
| Sep 10, 2020 | otc alterations permit: 35/f: electrical only, reference bpa#202003167121. floor lighting & power systems | Electrical | $150,000 | — | Finaled Jan 8, 2021 | 202008282906 |
| Mar 9, 2020 | otc alterations permit: 5/f: f/a work due to t.i. addition of 8 smoke detectors, 3 duct detectors, 8 modules, 42 speaker/srtrobes and 7 strobes. ref pa 201912190024. maher n/a | Heating and cooling | $44,200 | — | issued | 202003096451 |
| Oct 22, 2019 | otc alterations permit: 34th & 35th flrs fire alarm. fire alarm work for the "hsbc" remodels 34th and 35th floors; additions are 7 smoke detectors, 1 duct detector, 2 modules, 48 speaker/strobes and 14 strobes. ref pa 2019-0703-5059 | Heating and cooling | $44,200 | — | issued | 201910225122 |
| Oct 16, 2019 | otc alterations permit: rev to pa# 201907035059; to show mechanical and electrical revisions at network room at 3438 & 3551 on the 34th & 35th floors | Electrical | $1 | — | issued | 201910154420 |
| Sep 26, 2019 | otc alterations permit: fire alarm as built permit for the "restrooms" remodels on floors 17,18 and 19; this permit set of drawings reflects the replacement of 6 existing duct detectors with new units at the same location | Heating and cooling | $4,755 | — | Finaled Sep 27, 2019 | 201909262747 |
| Aug 20, 2019 | otc alterations permit: 2nd fl - non-structural, demo , non-structural partitions, electrical outlets. no change in occupancy use or area. mep, life safety, srpinklers under separate permit | Electrical | $6,004 | — | Finaled Feb 10, 2020 | 201908138606 |
| Aug 14, 2019 | otc alterations permit: 35th fl - non-structural demo, non-structural partitions, electrical, lighting, finishes, toilet room upgrades. mep, life safety & sprinklers under sep. permit. no change in area, occupancy, or use. maher na | Electrical | $210,000 | — | issued | 201907095365 |
| Jun 20, 2019 | otc alterations permit: 3rd flr, suites 340 and 360. mechanical, electrical for t.i pa 201903205737. n/a for maher | Electrical | $80,000 | — | Finaled Nov 22, 2019 | 201905301959 |
| Jun 18, 2019 | otc alterations permit: revision to pa's 201904309267 & 201809251272. 11th flr, suite 1120. mechanical, electrical for t.i pa 201812107852 | Electrical | $1 | — | issued | 201905301963 |
| Jun 14, 2019 | otc alterations permit: 9th fl: mechanical - install 1 new single duct vav & cieling exhaust fan, electrical - lighting, power, data & signal, & plumbing work. ref pa #201806283237 & #201809140205 | Heating and cooling | $1 | — | issued | 201811166088 |
| Jun 13, 2019 | otc alterations permit: 38th flr, suite 3860. mechanical, electrical for t.i pa 201903205739 | Electrical | $81,000 | — | Finaled Mar 11, 2020 | 201905301955 |
| Apr 22, 2019 | otc alterations permit: 17, 18 and 19th fl - electrical only permit to support architechtural. new lighting & controls for restroom. ref pa 2019-0211-2591, 2019-0117-0637 and 2019-0108-9816 | Electrical | $60,000 | — | Finaled Nov 1, 2019 | 201904228566 |
| Mar 5, 2019 | otc alterations permit: 38th floor: t-24 electrical for work under app#201901039580 | Electrical | $1 | — | issued | 201903044280 |
| Mar 1, 2019 | otc alterations permit: 19th fl mech and elec to support architectural. new vav box , exhaust fan, fcu, water pump, duct work, waterpiping ref 201901170637 | Heating and cooling | $85,000 | — | Finaled Aug 16, 2019 | 201902082504 |
| Jan 28, 2019 | otc alterations permit: mechanical, electrical, plumbing for tenant improvement on 38th fl ref 201901230964 | Plumbing | $140,000 | — | Finaled May 17, 2019 | 201901251243 |
| Jan 7, 2019 | otc alterations permit: lobby - fire alarm work the "lobby remodel" on floor 1; additions are 10 smoke detectors, 2 duct detectors, 1 pull station, 3 speaker/strobes and 2 strobes. ref pa 2018-0119-9061 | Heating and cooling | $13,140 | — | Finaled Jul 31, 2019 | 201812148324 |
| Dec 13, 2018 | otc alterations permit: 11th fl - mechanical and electrical for pa 2018-0925-1272 | Electrical | $110,000 | — | issued | 201812107852 |
| Nov 20, 2018 | otc alterations permit: 7th floor mech and electrical for app#201810011911. n/a for maher | Electrical | $50,000 | — | Finaled Mar 18, 2019 | 201811206442 |
| Oct 31, 2018 | otc alterations permit: 21st flr, t.i - electrical, mechanical, plumbing | Plumbing | $100,000 | — | Finaled Mar 27, 2019 | 201810314580 |
| Oct 10, 2018 | otc alterations permit: 36th floor: mechanical, electrical and plumbing for t.i. ref app#201808238154. n/a for maher | Plumbing | $4,000 | — | Finaled Mar 29, 2019 | 201810042309 |
| Sep 19, 2018 | otc alterations permit: revision to 201806283237, new accessible restroom locaton and relocating meeting room mech, elec, plumbing, life safety, sprinkler under sep permit | Plumbing | $1 | — | Finaled May 2, 2019 | 201809140205 |
| Apr 24, 2018 | otc alterations permit: 13th fl: t-24 electrical for work under pa #201801309841. maher na | Electrical | $3,500 | — | Finaled Oct 30, 2018 | 201804247272 |
| Apr 24, 2018 | otc alterations permit: 20th fl: t-24 electrical for work under pa #201803022654. maher na | Electrical | $27,500 | — | Finaled Nov 1, 2018 | 201804247270 |
| Apr 20, 2018 | otc alterations permit: 11th floor: non structural demo. new non-structural partitions, electrical, millwork, & finishes. no change in occupancy, use , or area. mep, life safty, sprinklers under seperate permit. n/a for maher | Electrical | $366,639 | — | Finaled Jul 24, 2018 | 201804065670 |
| Mar 29, 2018 | otc alterations permit: 1st floor: demo extg partitions, ceilings, casework finishes. construct new partitions, ceilings, case work finishes. relocate electrical, mech, for floor plan. n/a for maher | Electrical | $132,000 | — | Finaled Jun 12, 2019 | 201803012537 |
| Feb 2, 2018 | otc alterations permit: ste 2410-2440 - 3995 sq ft ti including elect/mech/plumbing. fully accessible, no occ class change. no exterior planting, signage, landscape or roof top work. maher na | Roofing | $500,000 | — | issued | 201712126250 |
| Jan 30, 2018 | otc alterations permit: 20th floor ti, suite 2020 ti. mep deferred. new enclosed office will be constructed at location of existing office cubicle work station. no change to ceiling. minor electrical. area of work 233sf. maher na | Electrical | $111,872 | — | Finaled Nov 2, 2018 | 201801269652 |
| Jul 27, 2017 | otc alterations permit: lobby suite r1203 - ref pa#201705035524. mep: 1 restroom with sink & water closet & 1 staff lounge with sink and diswasher, f/c chilled & hot water supply, exhaust fan, nw duct work and ventilation, provide lights and power to 2186 feet of office space. fire under separate permits | Heating and cooling | $120,000 | — | issued | 201706169556 |
| Jun 15, 2017 | otc alterations permit: 28th floor - non structural demo non-structural partitions, electrical finishes. no change in occupancy use, or area. mep under separate permit | Electrical | $60,000 | — | Finaled Aug 7, 2017 | 201705267725 |
| Jun 14, 2017 | otc alterations permit: fire alarm work for the "jump start md" remodel on floor 1; additions are 2 duct detectors, 9 speaker/strobes and 5 strobes. ref pa 2017-0503-5524 n/a for maher | Heating and cooling | $8,360 | — | Finaled Aug 25, 2017 | 201706139213 |
| May 11, 2017 | otc alterations permit: mechanical, electrical for ti on the 28th floor. ref pa 2017-0127-8070 | Electrical | $2,000 | — | issued | 201705106177 |
| Apr 21, 2017 | otc alterations permit: 3rd floor:t-24 electrical for work under app#201702078801. n/a for maher | Electrical | $3,000 | — | Finaled Sep 8, 2017 | 201704214565 |
| Apr 21, 2017 | otc alterations permit: 21st floor:t-24 electrical for work under app#201702078801. n/a for maher | Electrical | $3,000 | — | Finaled Sep 8, 2017 | 201704214563 |
| Mar 29, 2017 | otc alterations permit: non structural demo. non-structural partitions, lighting, ceiling, plumbing fixtures finishes. no change in occupancy use or area. mep, life safety, sprinklers under separate permit | Plumbing | $157,000 | — | Finaled Sep 7, 2017 | 201702078804 |
| Mar 29, 2017 | otc alterations permit: non structural demo. non-structural partitions, lighting, ceiling, plumbing fixtures finishes. no change in occupancy use or area. mep, life safety, sprinklers under separate permit | Plumbing | $157,000 | — | Finaled Sep 7, 2017 | 201702078801 |
| Feb 10, 2017 | otc alterations permit: 20th flr: t-24 electrical for work under:201602240337 maher na | Electrical | $5,000 | — | issued | 201702099090 |
| Feb 10, 2017 | otc alterations permit: 11th flr: t-24 electrical for work under:201602260583 maher na | Electrical | $20,000 | — | Finaled Mar 1, 2017 | 201702099089 |
| Dec 16, 2016 | otc alterations permit: 2/f-selective interior non structural demo, new non structural partition, door, ceiling, lights, millwork, finishes, electrical, plumbing, hvac. no change in occupancy or use, no change in floor area. mep under seperate permit. n/a ordinance #155-13 | Heating and cooling | $106,800 | — | Finaled Feb 6, 2017 | 201612165141 |
| Aug 29, 2016 | otc alterations permit: fire alarm work for the "blush" project on floor 1; additions are 1 duct detector, 1 pull station, 3 speaker/strobes and the relocation of 2 speaker/strobes. ref pa 2016-0610-9617 201603141932 | Heating and cooling | $3,250 | — | Finaled Oct 13, 2016 | 201608296184 |
| Aug 26, 2016 | otc alterations permit: t-24 electrical for work done under 2016-0727-3489 | Electrical | $1,500 | — | Finaled May 18, 2017 | 201608266103 |
| Aug 26, 2016 | otc alterations permit: convert jewelry store to cigar store, demo of select non-structural partitions, construct new non-structural partitions, minor electrical,no changes in life safety,hvac and sprinklers; maher n/a | Heating and cooling | $44,000 | — | Finaled Nov 22, 2016 | 201601288275 |
| Aug 24, 2016 | otc alterations permit: 29/f- mechanical, electrical for t.i. on 29/f to install new equipment and fixtures. t.i. pa#201607132248. n/a ordinance #155-13 | Electrical | $303,993 | — | Finaled Mar 15, 2017 | 201608023982 |
| Aug 5, 2016 | otc alterations permit: suite r-1206, 2nd floor inteiror tenant improvement - relocate doors, lighting & strobes, construction of partitions, counters & ceilings for tenant. mechanical, electrical & plumbing under separate permit. n/a maher ordinance | Plumbing | $127,375 | — | Finaled Oct 13, 2016 | 201604255563 |
| Aug 1, 2016 | otc alterations permit: t24 mechanical and electrical to install and relocate equipment on the 30th fl. ref 201607132253 maher not req | Electrical | $137,000 | — | Finaled Mar 15, 2017 | 201607263404 |
| Jul 28, 2016 | otc alterations permit: commercial ti which includes demo, construction of new non-structural partitions, lighting, elelctrical, finishes and plumbing. maher na | Plumbing | $345,000 | — | Finaled Mar 1, 2017 | 201607273489 |
| Jul 15, 2016 | otc alterations permit: 15th floor: new non-structural partitions, doors, glazing, finishes, and electrical. no change in occupancy use or area. mep and fire under seperate permit. n/a for maher | Electrical | $30,000 | — | issued | 201607142363 |
| Jun 10, 2016 | otc alterations permit: lobby & 2nd flr: tenant improvements with small office space electric panel upgrade, ref. 201603141932; maher n/a | Electrical | $110,000 | — | issued | 201606109617 |
| May 18, 2016 | otc alterations permit: 9th floor: t-24 electrical for work done under app#201602190010. n/a for maher | Electrical | $6,000 | — | Finaled Jan 26, 2017 | 201605187731 |
| May 17, 2016 | otc alterations permit: electrical work for ti. ref pa 2016-0502-6247. compliance with maher ordinance no 155-13 not required | Electrical | $12,400 | — | issued | 201605167465 |
| Mar 16, 2016 | otc alterations permit: fire alarm work for retail store r1114 t mobile remodel on floor 1, additions are 1 duct detector, 5 speaker/strobes, 2 strobes; ref. 201512114885; maher n/a | Heating and cooling | $4,100 | — | Finaled Mar 28, 2016 | 201603162131 |
| Mar 9, 2016 | otc alterations permit: 15th floor: t.i. convert file room to office, relocate partition. relocate electrical outlets. n/a for maher | Electrical | $15,000 | — | Finaled Mar 30, 2016 | 201603081478 |
| Mar 7, 2016 | otc alterations permit: 11th flr: new toilet rooms, plumb fixtures, accessories, finishes. new finishes in commn elevator lobby & cooridor. no change in occupancy, use or area. mep under sep permit | Plumbing | $151,000 | — | Finaled Mar 1, 2017 | 201602260583 |
| Mar 7, 2016 | otc alterations permit: 20th floor - new toilet rooms, plumbing fixtures, accessories & finishes. no hcange in occupancy, use, or area. mep under separate permit. n/a maher ordinance | Plumbing | $100,000 | — | issued | 201602240337 |
| Nov 6, 2015 | otc alterations permit: 23rd floor: t-24 electrical for work done under app#201506199391 | Electrical | $38,000 | — | Finaled Mar 9, 2016 | 201511061990 |
| Oct 14, 2015 | otc alterations permit: grd fl: interior bank t.i. including removal of non-bearing walls, relocation of tellers, new platform work areas, new carpet, new paint and electrical using extg circuitry. n/a for the maher. life safety not affected | Electrical | $305,000 | — | Finaled Jan 26, 2016 | 201507302872 |
| Jun 24, 2015 | otc alterations permit: 23nd floor suite 2350 - non-structural demo, non-structural partitions, electrical, finishes & millwork. no change in occupancy, use, or area. mep, sprinklers and fire alarm under separate permit | Electrical | $222,801 | — | Finaled Mar 9, 2016 | 201506199391 |
| Mar 20, 2015 | otc alterations permit: 39th floor:electrical for t.i. ref app#201501226333. n/a for the maher | Electrical | $10,000 | — | Finaled Sep 18, 2015 | 201503201398 |
| Mar 11, 2015 | otc alterations permit: 40th floor: mechanical and electrical work for t.i. n/a for the maher | Electrical | $38,000 | — | Finaled Sep 18, 2015 | 201502047415 |
| Mar 5, 2015 | otc alterations permit: 9th fl: mechanical and electrical work in relation to ti 2015-0212-8137 | Electrical | $75,000 | — | Finaled Aug 11, 2015 | 201503050088 |
| Feb 19, 2015 | otc alterations permit: 9th floor - non-structural demo & construct non-structural partitions, electrical, finishes. no change in occupancy, use or area. mep, life safty and sprinklers under separate permit. n/a maher ordinance | Electrical | $230,000 | — | Finaled Jun 22, 2015 | 201502128137 |
On Embarcadero Center
377 permits on record on Embarcadero Center.
| Trade | Permits | Since Oct 5, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 2 | 0 | — | under 5 | Feb 16, 2024 |
| Electrical | 182 | 22 | $167,500 | $50,645–$684,500 | Oct 1, 2026 |
| Heating and cooling | 122 | 17 | $131,940 | $37,005–$930,000 | Jul 9, 2026 |
| Plumbing | 69 | 7 | $1,660,000 | $534,232–$5,150,000 | Jul 23, 2026 |
| Water heater | 2 | 0 | — | under 5 | Nov 3, 2022 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 5, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 5, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 5, 2026. Owner names are not shown on any page.