Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Sep 1, 2026otc alterations permit: 28th floor: t.i.demo of a partition of existing pantry and adding one all gender restroom. new non-structural partitions doors, lighting, millwork minor electrical and fixturesElectrical$185,000—issued202608116388
Aug 4, 2026otc alterations permit: 11/f: selective demolition of non-load-bearing partitions. removal of power and data outlets, lighting, switches, and associated electrical devices including removal of suspended ceiling tiles, grid, and related ceiling mounted devices, except smoke control devices as well as removal ofElectrical$300,000—issued202603117394
Jun 30, 2026otc alterations permit: 18/f: mechanical and electrical for bpa# 202605141295Electrical$545,000—issued202606263995
Jun 3, 2026otc alterations permit: 16/f: suites 1660/1680: title 24 electrical spec suite office tenant retrofit: lighting fixtures & assocated circuiting / controls, power & signal devices & associated wiringElectrical$150,000—Finaled Aug 25, 2026202605282083
Dec 3, 2025otc alterations permit: 23rd fl suite 2350 ref pa #202509266161: deferred electrical permit. light fixtures & associated circuiting/controls, power and signal devices & associated wiringElectrical$90,000—Finaled Jan 6, 2026202512030822
Nov 20, 2025otc alterations permit: 3rd floor: hvac work including installation of 4 fan coil units and 1 supply for the atrium area of the 3rd floor. this will include new electrical under different permit/contrators) not moving existing walls, no seismic retrofit, accessible entrance and legalizing a unit.ref# 202403188032Heating and cooling$55,009—Finaled Mar 25, 2026202511069037
Jun 20, 2025otc alterations permit: electrical work for new security operations center on level lobby. deferred electrical submittal ref#: 202405242925Electrical$56,450—issued202506138664
Mar 28, 2025otc alterations permit: 19/flr- demo of non load bearing partitions, finishes, ceilings construction of full height partitions, doors, glazing, assoocated electrical power lighting, associates mechanical system distribution and finishesElectrical$400,000—Finaled Aug 19, 2025202503263060
Mar 4, 2025otc alterations permit: suite 1630: deferred mechanical & electrical permit ref pa 202502079849 mech- mech modifications to accommodate arch layout changes, new dual duct rav box & new ductwork as needed. reconfigure of ductwork & air dist. electrical- new power & signal devices throughout space new title 24Heating and cooling$100,000—Finaled May 2, 2025202503041481
Feb 7, 2025otc alterations permit: ste 1630: selective demo of millwork, non structural walls, power outlets, & finishes. construction of non structural partitions, doors/ store-fronts, electrical, millwork & finishes. no change in occupancy, use in area. mep deferredElectrical$498,278—Finaled May 2, 2025202502079849
Oct 3, 2024otc alterations permit: 19th/f: demo of non-load bearing partitions, finishes & ceiling. construction of new full height partitions, interior finishes, associated electrical power/lighting distribution. mech & plumbingPlumbing$600,000—Finaled Mar 27, 2025202409170925
Jul 31, 2024otc alterations permit: 23rd flr - deferred electrical permit. permit ref# 2024-0621-4954. lighting fixtures + associated circuitung/controls, power + signal devices + associated wiringElectrical$50,000—Finaled Oct 17, 2024202407317653
Jun 20, 2024otc alterations permit: fire only: work for bxp remodel on floor 3: additions and replacement are 19 smoke detectors, 14 duct detectors, 6 modules, 2 pull stations, 31 speakers, 39 speaker/ strobes, and 4 strobes. permit ref# 202403188032Heating and cooling$125,000—Finaled Oct 31, 2024202406204812
Jun 5, 2024otc alterations permit: suite 480: permit ref# 2024-0426-08255: deferred electrical permit: office tenant retrofit: new power receptacles, tele data outlets, and associated wiring in an existing to remain office suiteElectrical$30,000—Finaled Jul 11, 2024202406053734
May 8, 2024otc alterations permit: 4th fl selective demolition of millwork, non structural walls, power outlets and finishes. construction of non structural partitions, door/stovefronts, electrical, millwork finishes. no change in occupancy, use or areaElectrical$363,520—Finaled Jul 11, 2024202404260825
Apr 24, 2024otc alterations permit: hvac modification to support t.i. add 2 return grilles, new power & lighting. ref 202403157877Heating and cooling$25,000—issued202404190350
Mar 26, 2024otc alterations permit: selective demolition of non structural ceilings, lights, electrical millwork and finishes. construction of non structural partitions, lights, doors/windows, ele milwork finishes. no change in occupancy. use or areaElectrical$130,000—Finaled Jul 16, 2024202403157877
Aug 7, 2023otc alterations permit: unit 2200: mechanical & electrical properties work for t.i. to consist of new ducktwork, grilles & diffusers, new lighting & controls, power & signal. ref pa 202305117552Electrical$20,000—Finaled Dec 19, 2023202308013379
Jan 10, 2023otc alterations permit: deferred electrical permit, pa# 2022-1031-5542Electrical$50,000—Finaled Feb 10, 2023202301109908
Jul 19, 2022otc alterations permit: suite 2700: interior t.i.: demo of office & adding 1 all gender restroom. new non-structural partitions, door, lighting, plumbing fixtures, fittings & finishesPlumbing$200,934—Finaled Mar 23, 2023202207088028
Jan 19, 2022otc alterations permit: 16th fl: non-structural demo. non-structutal partitions, finishes, plumbing, fixtures & accessories. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permitPlumbing$157,000—Finaled Mar 3, 2023202102114453
Jun 8, 2021otc alterations permit: fire work only for the "jams sfo" remodels on floors 14 and 15; additions are 1 smoke detector, 18 modules, 1 strobe power supply, 14 speakers, 40 speaker/strobes, 10 strobes, as well as the replacement of 27 smoke detectors and 6 duct detectors. ref. permit app # 2021-0114-2680 and 2021-011Heating and cooling$64,800—issued202104269366
Apr 7, 2021otc alterations permit: suite 1500:t.i.: selective demo & construction of non-load bearing partitions, new celings & light fixtures, new electrical, new office doors & frames, newmillwork & new finshes. mep is deferred. maher n/aElectrical$1,800,000—Finaled Feb 22, 2022202101142691
Mar 16, 2021otc alterations permit: suite 1400: t.i.: selective demo & construction of non-load bearing partitions, new celings & light fixtures, new electrical, new office doors & frames, new millwork & new finshes. mep is deferred. maher n/aElectrical$126,490—issued202101142680
Feb 4, 2021otc alterations permit: fire alarm work for floor 2 restrooms remodel; additions are 2 duct detectors and 8 strobes. ref. permit app # 2020-0918-4477Heating and cooling$7,570—Finaled Mar 3, 2021202101042039
Dec 22, 2020otc alterations permit: 2nd fl: mechanical - demo existing duct & hvac equipment. install new fire/smoke dampers, install low pressure ductwork. electrical - lighting, power & signal. ref ti pa# 202009184477Heating and cooling$1—Finaled Mar 22, 2021202011309871
Nov 24, 2020otc alterations permit: fire only work for the lobby renovation remodel; additions are 6smoke detectors, 3 duct detectors, 1 module, and 5 speaker/strobes. ref #2019-1003-3419Heating and cooling$12,070—Finaled Dec 16, 2021202010287654
Nov 16, 2020otc alterations permit: 2nd fl: renovation of existing restroom & elevator lobby, restroom, include replacing existing light & plumbing fixtures, new finishes. elevator lobby includes new finishes. no work on elevators. deferred mepPlumbing$600,000—Finaled Mar 18, 2021202009184477
Jan 28, 2020otc alterations permit: deferral mep permit for building permit 201912200104; minor hvac modifications to accomodate new offices new title 24 lighting and work stations powerHeating and cooling$75,000—Finaled Jun 13, 2020202001232560
Oct 1, 2019otc alterations permit: 28th fl. t-24 electrical for work under pa's 201907166005, 201907166006 & 201907166007Electrical$1—Finaled Mar 12, 2020201909242572
Aug 1, 2019otc alterations permit: install hvac unit on roof, replace 1 piece of glass at skylight, no change in occupancy, use or atrea, sprinklers & life sagety under sep permitHeating and cooling$160,000—Finaled Jan 21, 2020201907307278
Jul 9, 2019otc alterations permit: 2, promenade level, suite r2308. interior build-out of building incl demo, finishes, plumbing, minor electrical and partitions. mech, electrical, plumb and sprinkler system modification is under separate permitPlumbing$500,000—Finaled Aug 12, 2020201907095363
May 3, 2019otc alterations permit: 16th fl mech,elec, plumbing to support apprvd arch. in stall 4 new wshps and 4 new vav boxes. ref 201901140263Plumbing$60,000—Finaled Jun 24, 2019201902112570
Apr 5, 2019otc alterations permit: above ground flr - office ti of new non structural partitions, ceiling, casework, finishes, mechanical, electrical and plumbing work maher naPlumbing$600,000—Finaled Nov 19, 2019201902223624
Sep 28, 2018otc alterations permit: 22nd fl: non-structural dmeo., non-structural partitions, doors, lighting, electrical, finishes. no change in occupancy, use or area. mep, life safety, sprinkler under sep permit. maher naElectrical$89,910—Finaled Apr 9, 2019201809261406
Jun 6, 2018otc alterations permit: title 24 electrical only 1st floor . ref app#201804196806Electrical$15,000—Finaled Nov 29, 2018201805240027
Apr 30, 2018otc alterations permit: minor demolition, and new non-structural partitions, finishes and millwork. reuse and new lighting. relocate hvac ducts, and grilles, relocate sprinklers to accomodate new layout on separate permitsHeating and cooling$253,500—Finaled Nov 29, 2018201804196806
Feb 23, 2018otc alterations permit: fire alarm as-built permit for the addition of 2 duct detectors and update to the existing sequence of operation per the sffd testing inspector. the work was done for the "wework" remodels on floor 17. ref. permit app #201707101404Heating and cooling$3,170—issued201802232053
Jan 30, 2018otc alterations permit: 4th fl - non structural, demo. non-structural partitions, lighting, doors, electrical, finishes. no change in occupancy, use or area. mep, life safety, sprinklers under sep permit. maher n/aElectrical$146,172—Finaled Oct 16, 2018201801037734
Oct 23, 2017otc alterations permit: electrical work for ti on the 16th fl. ref pa 2017-0920-9050. maher naElectrical$10,000—issued201710231894
Oct 20, 2017otc alterations permit: fire alarm work for the "restroom upgrade: remodel on floor 11. additions are 2 duct detectors, 2 speaker/strobes and 1 strobe. ref pa 2017-1006-0581. maher naHeating and cooling$2,750—Finaled Jan 16, 2018201710201769
Sep 14, 2017otc alterations permit: r2106:gr fl ti food service to food service. new work includes non bearing partiton, casework, lighting, plumbing, elec, finishes. no seating or eat in dining. all food prepacked and prepared offsite with no req for additional food prep. reuse of mechanical maher not reqPlumbing$100,000—Finaled Dec 22, 2017201709067108
Aug 30, 2017otc alterations permit: t-24 electrical for work done under pa 2017-0602-8212Electrical$4,000—issued201708306403
Jul 18, 2017otc alterations permit: 17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404Water heater$150,000—Finaled May 7, 2018201707172003
Jul 18, 2017otc alterations permit: 9/f: addition of single user restroom including toilet, sink, elec, hvacHeating and cooling$12,000—issued201707101324
Jun 9, 2017otc alterations permit: non structural demo. non structural partitions, electrical, millwork finishes. no change in occupancy, use or area. mep under sep permit. maher n/a. future tenant require ti permitElectrical$25,000—issued201706028212
Mar 31, 2017otc alterations permit: 1,2,3/f-interior renovation to gym include: demo lighting, plumbing, hvac terminals & vav boxes, casework-desks,lockers,storage,flooring, acoustic ceiling & limited non bearing partitions. new lighting,plumbing,hvac fixtures,floor,wall finishes,acoustic ceiling & non bearing partitionsHeating and cooling$245,000—Finaled Mar 9, 2018201703222048
Feb 10, 2017otc alterations permit: 14th flr: t-24 electrical for work under:201602260584 maher naElectrical$7,000—Finaled Mar 1, 2017201702099092
Feb 10, 2017otc alterations permit: ground flr: t-24 electrical for work under: 201611082277 maher naElectrical$11,000—Finaled May 18, 2017201702099091
Jan 25, 2017otc alterations permit: fire alarm to add 4 smoke detectors, 9 duct detectors, and 10 modules to the wework remodels on floors 7, 8, 9. this is permit 2 for the fire alarm additions on these remodels. ref 201607283557 n/a for maherHeating and cooling$10,430—issued201701257822
Jan 25, 2017otc alterations permit: removing e demising wall, build new demising wall and expansion of tenant space for added storage. new flooring, ceiling, and lighting as noted. no exterior work. mechanical, electrical, plumbing, lighting and life safety work permormed on a design build basis as required and submitted as sep permiPlumbing$35,524—Finaled May 18, 2017201611082277
Jan 19, 2017otc alterations permit: promenade - new electrical for gym equipment, new accessible restroom, new finishes, and paint by owner. expansion of extg gym to include 5000 sq ft of new space. total gym use 17,000 sf. n/a for maherElectrical$150,000—Finaled Feb 16, 2017201611303781
Jan 11, 2017otc alterations permit: t24 mechanical and electrical for work under 201610190673Electrical$82,000—Finaled Jan 9, 2018201701116916
Jan 9, 2017wall or painted sign: replacement sign copy n/a maher ord. 155-13Electrical$775—issued201701096727
Jan 9, 2017sign - erect: new electric sign ; n/a maher ord. 155-13Electrical$890—issued201701096725
Jan 9, 2017sign - erect: new sign, electric double faced wall sign; n/a mher ord. 155-13Electrical$5,400—issued201701096722
Dec 28, 2016otc alterations permit: 22nd flr: t-24 electrical for work donw under 201609066806 maher naElectrical$1—Finaled Mar 17, 2017201612235812
Dec 28, 2016otc alterations permit: 4th flr: t-24 electrical for work donw under 201609066806 maher naElectrical$1—Finaled Mar 17, 2017201612235810
Nov 18, 2016otc alterations permit: fire alarm work for sephora remodel on floor 1, additions are 7 duct detectors, 6 speaker strobes, 3 strobes, as well as relocation of 1 pull station maher not reqHeating and cooling$9,200—Finaled Feb 21, 2017201611152671
Oct 24, 2016otc alterations permit: 6th floor:demo selected non-structural partitions, build new non-structural partitions, millwork, finishes, plmg, electrical. mep, fire life safety sprinklers under seperate permit. n/a for maherElectrical$50,000—issued201610190672
Oct 4, 2016otc alterations permit: mechanical, electrical, plumbing to install and relocate equipment on the 13th floor. please refer to pa 2016-0922-8567 for ti work. life safety deferredPlumbing$900,000—Finaled Mar 14, 2017201609309309
Sep 27, 2016otc alterations permit: space #r-2109: full remodel of existing retail space, scope includes new storefront, non-bearing interior partition walls,new floor finishes,new paint,new casework & furniture,structural work,electrical work,mechanicalwork, and plumbing work; maher n/aPlumbing$895,000—Finaled Nov 15, 2017201603041173
Sep 26, 2016otc alterations permit: 22th floor - non-struct demo, non-struct partitoins, ceiling, lights, electrical, millwork finishes. no change in area, occupancy, use. m.e.p. under separate permit. n/a maher ordinanceElectrical$401,998—Finaled Mar 17, 2017201609066808
Sep 26, 2016otc alterations permit: 4th floor - non-struct demo, non-struct partitoins, ceiling, lights, electrical, millwork finishes. no change in area, occupancy, use. m.e.p. under separate permit. n/a maher ordinanceElectrical$574,673—Finaled Mar 1, 2017201609066806
Sep 14, 2016otc alterations permit: refit of mep system on floor 7 and 8 of existing office building , installation of lights and control systems, controlled receptacles per title 24. new plumbing fixtures and plumbing connections. new terminal units to be installed and utilze building hvac system ref 201607283557 no new fsd'sHeating and cooling$1,884,524—issued201608044166
Sep 14, 2016otc alterations permit: refit of mep systems on 9th fl of e office building. no new fsd's. installation of lights and control system and controlled receptacles for title 24. new plumbing fix and plumbing connections, new terminal units installed and utilize building hvac systemHeating and cooling$942,262—issued201608044154
Sep 14, 2016otc alterations permit: 7th, 8th & 9th floors: installation of new partitions and gyp board ceiling. installation of nnew millwork, countertops and fixtures, . new finishes throughout, paint and floor covering. mechanical/electrical/ plumbing/life safety under sep permit maher naPlumbing$4,981,977—issued201607283557
Aug 15, 2016otc alterations permit: 23rd flr: mech, elect & plumb. ref pa 201608034056Plumbing$325,000—Finaled Aug 10, 2017201608094524
Apr 21, 2016otc alterations permit: fire alarm work for the "restrooms" on floor 14; additions are 2 duct detectors. ref pa 2016-0226-0584. maher naHeating and cooling$1,220—issued201604215300
Mar 7, 2016otc alterations permit: 14th floor work - new toilet rooms, plumbing fixtures, accessories, finishes, new finishes in common elevator lobby and corridor. no change in occupancy, use, or area. mep and fire under sep permitPlumbing$151,000—Finaled Mar 1, 2017201602260584
Feb 25, 2016otc alterations permit: 18th & 19th floor - ada upgrades to install new partitions, toilets, urinals, sinks & accessories. n/a maher ordinance. electrical, sprinklers, & fire alarm separate permitElectrical$151,000—Finaled Jun 30, 2016201602220177
Feb 19, 2016otc alterations permit: center a, space r-2210: interior tenant improvement to existing retail tenant, non structural work, electrical fixture upgrades and minor plumbing fixture updates, total 1,310 sq.ft. n/a ordinance #155-13Plumbing$175,000—Finaled Mar 28, 2016201512013813
Nov 9, 2015otc alterations permit: ref# 2015 0730 2915: install roof top unit. install 4 new fan coil units. install mechanical piping for new units. install new low pressure duct work. maher naHeating and cooling$130,000—Finaled Aug 3, 2016201510079101
Nov 5, 2015otc alterations permit: 1st floor: fire alarm work for the "spec suite" t.i. remodel on the promenade level, additions are 1 smoke detector, 2 duct detectors, 8 speakers, and 3 strobesHeating and cooling$7,300—Finaled Feb 26, 2016201511031648
Oct 7, 2015otc alterations permit: 23rd flr: non-structural demo, non-structural partitins, lighting,electrical,finishes,no change in occupancy, use or area. life safety & mep under separate permit; maher n/aElectrical$477,396—issued201509227631
Sep 3, 2015otc alterations permit: 3rd floor: t.i. includes the demo of non-structural partitions and bldg . new non-structural partitions. all new or revised hvac electrical, plumbing life safety. work will be design build and submitted seperately. bldg is fully sprinklered. n/a for maher. change from restuarant to officeHeating and cooling$400,000—Finaled Aug 3, 2016201507302915
Aug 17, 2015otc alterations permit: 10th and 11th floor: non-structural partitions, new acoustical grid and tile and gyp board ceilings. mechanical, electrical, plmg included. n/a for. library shelve structural will be under separate permit. l/s under separate permitElectrical$1,915,860—Finaled Jun 28, 2016201507222117
Jun 23, 2015otc alterations permit: 12th floor: renovate extg elevator lobby and reception area to include: new finishes, new lighting, re-work extg hvac and fire sprinklers. n/a for the maherHeating and cooling$500,000—Finaled Sep 15, 2016201505085868
May 20, 2015otc alterations permit: 4th floor: fire alarm work. remodel at the restrooms. addition are 2 duct detectors. ref. appl. # 2015.0224.9136. n/a for maherHeating and cooling$1,000—issued201505206740

On Embarcadero Center

377 permits on record on Embarcadero Center.

TradePermitsSince Oct 4, 2024Median declaredRangeLast
Roofing20—under 5Feb 16, 2024
Electrical18222$167,500$50,645–$684,500Oct 1, 2026
Heating and cooling12217$131,940$37,005–$930,000Jul 9, 2026
Plumbing697$1,660,000$534,232–$5,150,000Jul 23, 2026
Water heater20—under 5Nov 3, 2022

Roof replacement cost in San Francisco

Across 5,889 one- and two-family reroof permits since October 4, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,760. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 4, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 4, 2026. Owner names are not shown on any page.