3 Embarcadero Center, San Francisco
84 home-service permits on record at 3 Embarcadero Center, San Francisco; no roofing permit on record.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Jul 23, 2026 | otc alterations permit: suite 2350. remodel existing tenant suite, demo of lighting and finishes, construction of non structural partitions, ceilings, lighting, and finishes. no new plumbing fixtures. mep deferred | Plumbing | $95,282 | — | issued | 202607104811 |
| Apr 7, 2026 | otc alterations permit: 16th fl mechanical and electrical work for ti ref pa 202601214196 | Electrical | $140,000 | — | Finaled Jun 17, 2026 | 202603197880 |
| Mar 17, 2026 | otc alterations permit: 8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling | Heating and cooling | $300,000 | — | Finaled Aug 26, 2026 | 202603107215 |
| Feb 23, 2026 | otc alterations permit: 16/fl-scope of work includes creating spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-structural partitons, doors, ceilings,lighting, plumbing, and finishes. fls and mep deferred | Plumbing | $826,866 | — | Finaled Jun 17, 2026 | 202601214196 |
| Dec 19, 2025 | otc alterations permit: suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369 | Electrical | $80,000 | — | Finaled Jan 13, 2026 | 202512192290 |
| Dec 19, 2025 | otc alterations permit: deffered permit for ref ti 202510157369- for mep to include relocate of air duct and registers | Heating and cooling | $10,000 | — | Finaled Jan 13, 2026 | 202512161905 |
| Nov 14, 2025 | otc alterations permit: 25th fl - fire work only for suite 2500 remodel done under pa 202507160935; additions are 13 smoke detectors, 9 duct detectors, 2 pull stations, 9 modules, 44 speaker/strobes, 55 speakers and 3 strobes | Heating and cooling | $131,940 | — | Finaled Apr 15, 2026 | 202511129336 |
| May 23, 2024 | otc alterations permit: ref pa# 2023-0703-1429 1st fl: fire only work for the conference center remodel. add 2 smoke detectors, 15 duct detectors, 4 modules, 1 strobe power supply, 19 speakers/strobes and 8 strobes | Heating and cooling | $73,400 | — | Finaled Oct 16, 2024 | 202405232754 |
| Mar 19, 2024 | otc alterations permit: 11th fl, ste 1120 - deferred mech & elect. pa 202401123863 & 202403067187 mech. demo & replacement of grilles, registers & diffusers for office refresh. demo & install new dual duct vav boxes. electrical lighting fixtures & associated circuiting/controls. power & signal devices & associated wiring | Heating and cooling | $150,000 | — | Finaled Apr 4, 2024 | 202402286700 |
| Aug 7, 2023 | otc alterations permit: unit 1480: mechanical & electrical properties work for t.i. to consist of new ductwork, grilles & diffisuers as required. new lighting, controls, power & signal devices. ref pa 202305117614 | Electrical | $20,000 | — | Finaled Dec 20, 2023 | 202308013378 |
| Jun 22, 2022 | otc alterations permit: 17th fl: demo only permit. ab-017.includes demo of non-structural partitions, fixtures, finishes, suspended ceiling grid & lights. convert fire sprinklers to upright / turn up to return to warm shell condition. ref sprinkler pa# 202206146250. plumbing fixtures under separate permit | Plumbing | $132,000 | — | Finaled Aug 15, 2022 | 202206146292 |
| Apr 4, 2022 | otc alterations permit: 23/f suite 2350: add 9, relocate 37, change out 21 fire sprinklers per ti. ref ti permit 202203039131 | Heating and cooling | $14,135 | — | Finaled Jun 9, 2022 | 202204041525 |
| Feb 8, 2021 | otc alterations permit: 21-22 floor: ti improvement for mechanical, electrical, and plumbing. reference ti 2020-0714-0168 & 2020-0630-9411 | Plumbing | $1 | — | Finaled Aug 30, 2021 | 202010176743 |
| Jan 27, 2021 | otc alterations permit: 18th flr mep, ref arch 202006309375 - mechanical, electrical and plumbing for tenant improvement | Plumbing | $1 | — | Finaled Jun 29, 2022 | 202009194508 |
| Dec 4, 2020 | otc alterations permit: fire only work for the lobby renovation remodel; additions are 6 smoke detectors, 3 duct detectors, 1 module, and 5 speaker/strobes. ref permit # 2019-1003-3420 | Heating and cooling | $12,070 | — | Finaled Nov 29, 2021 | 202010287659 |
| Dec 4, 2020 | otc alterations permit: 11/f: new non-structural partitions, new acousticl ceilings, new finishes, lighting, electrical outlets and pantry plumbing. mep included. maher n/a. life safety deferred | Plumbing | $850,000 | — | Finaled Apr 28, 2021 | 202010206953 |
| Sep 11, 2020 | otc alterations permit: fire only permit for the cooley remodel on floor 22; additions are 11 smoke detectors, 4 duct detectors, 1 strobe power supply, 9 modules, 43 speakers/strobes,10 strobes, and 2 2-way comm stations. ref app#202006309411 | Heating and cooling | $53,200 | — | Finaled Sep 22, 2021 | 202008262686 |
| Sep 4, 2020 | otc alterations permit: fire only permit for the "cooley" remodel on floor 20; additions are 11 smoke detectors, 21 duct detectors, 1 strobe power supply, 10 modules, 47 speaker/strobes, 6 strobes and 2 2-way comm stations. ref app# 202007089841 | Heating and cooling | $74,600 | — | Finaled Sep 29, 2021 | 202008282902 |
| Sep 4, 2020 | otc alterations permit: fire only permit for the "cooley" remodel on 19th fl; additionals are 11 smoke detectors, 4 duct detectors, 1 strobe power supply, 10 modules, 41 speakers/strobes, 13 strobes & 2 2-way comm stations. ref pa# 202007089839 | Heating and cooling | $54,100 | — | Finaled Jun 29, 2022 | 202008272794 |
| Sep 2, 2020 | otc alterations permit: fire only permit for the "cooley" remodel on floor 21; additions are 12 smoke detectors, 15 duct detectors, 1 strobe power supply, 10 modules, 51 speaker/strobes, 6 strobes and 2 2-way comm stations. ref app# 202006309411 | Heating and cooling | $74,600 | — | Finaled Aug 16, 2021 | 202008292911 |
| Sep 2, 2020 | otc alterations permit: 18 floor: fire only permit for the cooley remodel; additions are 20 smoke detectors, 3 duct detectors, 8 modules, 1 strobe power supply, 39 speakers/strobes, and 12 strobes, and 2 2-way comm station. ref app#202006309375 | Heating and cooling | $55,400 | — | Finaled Sep 29, 2021 | 202008262688 |
| Feb 20, 2020 | otc alterations permit: 14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishes | Electrical | $2,500,000 | — | Finaled Oct 27, 2020 | 202001172205 |
| Aug 14, 2019 | otc alterations permit: 8th floor: t.i. to construct new partitions and t-24 lighting. fire alarm and spirnklers on seperate permit. no new mechanical or plumbing. n/a for maher | Plumbing | $184,320 | — | Finaled Mar 13, 2020 | 201908148774 |
| Jul 25, 2019 | sign - erect: install electric single faced wall sign 5-'-4 1/4" x 3 3/8 " | Electrical | $2,500 | — | issued | 201907256942 |
| Jul 25, 2019 | sign - erect: install electric single faced window sign 2'-9" | Electrical | $1,000 | — | issued | 201907256941 |
| Jul 25, 2019 | sign - erect: install breakfast, lunch, ninner, snacks, non -electric single faced window sign 2nd surace windlow vinyls centered in windows | Electrical | $500 | — | issued | 201907256936 |
| Jun 19, 2019 | otc alterations permit: ste 1350: non structural demo, new drywall partitions, doors, millwork , electrical mechanical and plumbing. no change to extg egress or bldg occupancy types. n/a for maher | Plumbing | $905,000 | — | Finaled Dec 2, 2020 | 201905150671 |
| Apr 19, 2019 | otc alterations permit: ref permit app: 201812128172- fire alarm work for the suite r3112 remodel on floor 1: additions are 3 smoke detectors, 8 duct detectors, 6 modules, 1 strobe power supply, 1 speaker, 11 speakers/strobes, and 2 storage | Heating and cooling | $27,860 | — | Finaled Jun 21, 2019 | 201904198420 |
| Jan 22, 2019 | otc alterations permit: suite # r3112: 3451 sf new build out of existing tenant space including non-structural framing, plumbing, electrical, mechanical and interior decorative materials and surfaces | Plumbing | $1,100,000 | — | Finaled Jul 8, 2019 | 201812128172 |
| Dec 18, 2018 | otc alterations permit: 23rd fl: revision to 201808248225 new changed partitions, electrical and finishes | Electrical | $1 | — | Finaled Feb 13, 2019 | 201812188617 |
| Nov 29, 2018 | otc alterations permit: fire alarm "drybar_ 1st flr add 2 duct det, 1 modulem 7 speaker/strobes, 2 strobes maher na ref#201810112907 | Heating and cooling | $9,200 | — | Finaled Dec 5, 2018 | 201811276807 |
| Oct 23, 2018 | otc alterations permit: promenade level. electrical work for tenant improvement. new power & data, new lighting controlds. ref pa 201808036345. maher n/a | Electrical | $1 | — | Finaled Jan 3, 2019 | 201810163269 |
| Oct 16, 2018 | otc alterations permit: 23rd flr. electrical work for tenant improvement. provide new lighting & branch circuiting to panel, new power and signal outlets. ref pa 201807205048. maher n/a | Electrical | $1 | — | Finaled Nov 15, 2018 | 201810163268 |
| Oct 11, 2018 | otc alterations permit: 11th fl: include drywall, ceiling, finishes, lighting, electric & hvac | Heating and cooling | $1,200,000 | — | Finaled Mar 5, 2019 | 201810092582 |
| Oct 11, 2018 | otc alterations permit: 23rd flr. electrical work for tenant improvement. ref pa 201808248225 | Electrical | $20,000 | — | Finaled Feb 13, 2019 | 201810032129 |
| Jul 31, 2018 | otc alterations permit: promenade level - electrical for 201807063863 new power and data for new tv locations, 2 new decorative sconce light in room 1013 | Electrical | $1 | — | Finaled Jan 9, 2019 | 201807275690 |
| Jul 26, 2018 | otc alterations permit: 25th fl - mechanical & electrical for pa 2018-0329-4927 | Electrical | $70,000 | — | issued | 201807245405 |
| Jul 19, 2018 | otc alterations permit: promenade level: non structural demo. non-structural partitions, electrical finishes, no change in occupancy, use or area. mep, life safety & sprinklers under sep permit | Electrical | $306,598 | — | Finaled Nov 16, 2018 | 201807063863 |
| Apr 24, 2018 | otc alterations permit: 14th fl: t-24 electrical for work under pa #201801309842. maher na | Electrical | $6,800 | — | Finaled Oct 30, 2018 | 201804247266 |
| Apr 3, 2018 | otc alterations permit: fire alarm work for the "restrooms" remodel on floor 14; additions are 2 duct detectors, 2 speakers and 2 strobes. ref. permit applic. #201801309842 | Heating and cooling | $5,500 | — | Finaled Oct 24, 2018 | 201804035301 |
| Mar 20, 2018 | otc alterations permit: revision to pa 2017-1017-1431 space r3111a, relocate air handling unit, arch, mech & electrical work | Electrical | $300,000 | — | Finaled Aug 21, 2018 | 201802010130 |
| Mar 14, 2018 | otc alterations permit: 13th fl - demo ac unit and associated 3 fsd duct work, install new heat pump and condenser water piping. maher n/a | Heating and cooling | $12,500 | — | Finaled May 4, 2018 | 201803133558 |
| Feb 27, 2018 | otc alterations permit: provide & install new vav's & transfer fan ref arch pa 2017-1213-6314 provide plumbing for break room appliances | Plumbing | $50,000 | — | issued | 201802262235 |
| Feb 23, 2018 | otc alterations permit: provide new lighting and electrical to spec suite. ref pa 2017-1213-6314 | Electrical | $50,000 | — | Finaled Jun 19, 2018 | 201802232076 |
| Feb 7, 2018 | otc alterations permit: fire alarm work for the "ann taylor" remodel on floor 1; additions are 2 duct detectors, 2 pull stations, 11 speaker/strobes and 2 strobes. ref pa 2017-1017-1431 maher na | Heating and cooling | $12,600 | — | issued | 201802070597 |
| Jan 10, 2018 | sign - erect: space 41 "naturalizer" install 1 electric single faced wall sign | Electrical | $5,000 | — | Finaled May 17, 2018 | 201801098113 |
| Jul 5, 2017 | otc alterations permit: revision to pa #201611072128 for t-24 energy compliance . n/a maher | Plumbing | $1 | — | issued | 201707050979 |
| May 19, 2017 | otc alterations permit: 24th flr: revision to 201612215548: minor electrical - new lighting to panel maintained some of the power outlets and provided additional new power branch circuiting and raceway systems as reqd to new power and signal outlets. maher na | Electrical | $4,000 | — | issued | 201705197121 |
| May 9, 2017 | otc alterations permit: 13th flr: add 2 duct detectors, 2 speakers and 2 strobes. maher na ref 201702109126 | Heating and cooling | $3,260 | — | Finaled Jun 22, 2017 | 201705095995 |
| Apr 21, 2017 | otc alterations permit: 13th floor: t-24th electrical for work under app#201702109126. n/a for maher | Electrical | $2,500 | — | Finaled Sep 8, 2017 | 201704214566 |
| Mar 29, 2017 | otc alterations permit: 13th floor: non-structural demo, new non-structural partitions, lighting, ceiling, plumbing fixtures finishes at restrooms and elevator lobby no change in occupancy, use or area, mep, l/s, sprinklers under seperate permit. n/a for maher | Plumbing | $157,000 | — | Finaled Sep 7, 2017 | 201702109126 |
| Mar 17, 2017 | otc alterations permit: 6th floor: t-24 electrical for work done under app#201610190660 | Electrical | $13,000 | — | Finaled Apr 7, 2017 | 201703171667 |
| Feb 10, 2017 | otc alterations permit: 4th flr: t-24 electrical for work under:201602260587 maher na | Electrical | $20,000 | — | Finaled Mar 1, 2017 | 201702099093 |
| Jan 3, 2017 | additions alterations or repairs: basement- installation of supply and exhaust ventilation systems for existing fire pump room. no change in building envelope includes associated electrical work, and removal and replacement of fire pump. n/a ordinance #155-13 | Electrical | $423,000 | — | Finaled Sep 8, 2017 | 201606291156 |
| Dec 23, 2016 | otc alterations permit: 6th flr: fire alarm add 1 smoke detectors, 2 duct detectors, 1 strobe power supply,231 speaker/strobes and 6 strobe. ref 201611072128 maher na | Heating and cooling | $18,660 | — | Finaled Apr 24, 2017 | 201612235785 |
| Dec 5, 2016 | otc alterations permit: 19/f- arch/elec revision to pa#201608306338 creating new rooms, see grid between 12/11 and j/j1 . revision to electrical power page e02.19.01. mechanical and fire under separate permit. n/a ordinance #155-13 | Electrical | $10,000 | — | Finaled Sep 8, 2017 | 201612013969 |
| Nov 15, 2016 | otc alterations permit: promenade level - suite p2, electrical for ti pa #2016-0825-6028. provide lighting & branch circuiting to existing panel | Electrical | $14,000 | — | issued | 201611102438 |
| Nov 14, 2016 | otc alterations permit: 23/f- t.i., non-load bearing partitions, minor mechanical & electrical work, av installation, new carpet & new flooring. building fully sprinklered. n/a ordinance #155-13 | Electrical | $50,000 | — | Finaled Sep 8, 2017 | 201610039339 |
| Nov 14, 2016 | otc alterations permit: 21st and 22nd floors: single floor tenant work including non-load bearing partitions, new electrical work and av installation. minor mechanical and new paint and new flooring | Electrical | $200,000 | — | Finaled Oct 5, 2017 | 201608306344 |
| Nov 14, 2016 | otc alterations permit: 18/f- t.i. includes non-load bearing partitions, new electrical work and av installations, minor mechanical. n/a ordinance #155-13 | Electrical | $372,515 | — | Finaled Sep 8, 2017 | 201607263330 |
| Nov 14, 2016 | otc alterations permit: 17/f- t.i. includes non-load bearing partitions, new electrical work and av installations, minor mechanical. n/a ordinance #155-13 | Electrical | $178,680 | — | Finaled Sep 8, 2017 | 201607263327 |
| Oct 21, 2016 | otc alterations permit: 20th floor: single floor tenant work including non-load bearing partitions, new electrical work and av installation. minor mechanical and new paint and new flooring | Electrical | $251,000 | — | Finaled Sep 8, 2017 | 201608306349 |
| Oct 21, 2016 | otc alterations permit: 19th floor: t.i. work on single floor tenant floor including non-load bearing partitions, new electrical work an av installation, minor mechanical, new paint and new flooring | Electrical | $255,000 | — | Finaled Oct 5, 2017 | 201608306338 |
| Oct 17, 2016 | otc alterations permit: fire alarm work for the "goodwin procter" remodel on floor 27; additions are 1 smoke detector, 3 duct detectors, 7 speaker/strobes, and 1 strobe. ref pa 2016-0916-7944. maher na | Heating and cooling | $6,520 | — | Finaled Dec 27, 2016 | 201610170395 |
| Oct 14, 2016 | otc alterations permit: 11th flr: interior t.i. ,new partitions & finishes no electrical or hvac on this permit; maher n/a | Heating and cooling | $101,500 | — | Finaled Jan 26, 2017 | 201610140324 |
| Aug 11, 2016 | otc alterations permit: promenade level - mechanical & electrical work for ti. ref pa 2016-0711-1952. maher na | Electrical | $37,500 | — | Finaled Dec 8, 2016 | 201608023924 |
| Jul 29, 2016 | otc alterations permit: 26/f- barrier removal only, demo restroom & build back fully accessible, non structural partition, plumbing fixtures & finishes. no change in area, occupancy or use. n/a ordinance #155-13 | Plumbing | $100,000 | — | Finaled Oct 13, 2016 | 201606160126 |
| Jun 24, 2016 | otc alterations permit: minor electrical work including additional outlets at new and walls, installation of water source heat pump for supplemental cooling. maher na | Heating and cooling | $1 | — | Finaled Nov 3, 2016 | 201606220590 |
| May 16, 2016 | otc alterations permit: lobby level: minor construction clarifications inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931 | Electrical | $1 | — | Finaled Jun 1, 2016 | 201605167537 |
| May 13, 2016 | otc alterations permit: lobby level: electrical lighting for ref pa 2016 0422 5477 and 2016 0315 2018 | Electrical | $1 | — | Finaled Jun 1, 2016 | 201605096931 |
| Apr 21, 2016 | otc alterations permit: fire alarm work for the "restrooms" on floor 4; additions are 2 duct detectors. ref pa 2016-0226-0587. maher na | Heating and cooling | $1,220 | — | Finaled Aug 23, 2016 | 201604215299 |
| Mar 7, 2016 | otc alterations permit: 4th flr: new toilet rooms, plumb fixtures, accessories, finishes. new finishes in commn elevator lobby & cooridor. no change in occupancy, use or area. mep under sep permit maher na | Plumbing | $151,000 | — | Finaled Mar 1, 2017 | 201602260587 |
| Feb 9, 2016 | otc alterations permit: suite 1410, 14th floor- scope of project of existing office building. it is a multi-tenant floor. the scope consists of the construction of new partitions and minor electrical, plumbing. no mech work. electrical, plumbing, sprinkler on seperate permit. n/a maher ordinance | Plumbing | $55,000 | — | issued | 201601157223 |
| Jan 29, 2016 | otc alterations permit: promenade level - mechanical and electrical work for ti, ste 4. ref ar 2015-1124-3560. maher na | Electrical | $62,000 | — | Finaled Apr 1, 2016 | 201601267994 |
| Jan 26, 2016 | otc alterations permit: mechanical & electrical work associated with approved pa# 201511203815. n/a ordinance #155-13. distribution is being modified per new space plan. no new fsd's. fire under seperate permit | Electrical | $36,000 | — | Finaled Mar 30, 2016 | 201601257919 |
| Dec 30, 2015 | otc alterations permit: 23rd flr: t-24 electrical for work done under pa 201511122403; maher n/a | Electrical | $8,500 | — | issued | 201512306173 |
| Oct 26, 2015 | otc alterations permit: 4th flr: interior tenant improvement on floor including drywall, ceilings,doors, millwork and finishes, includes mechanical & electrical; maher n/a | Electrical | $1,026,360 | — | issued | 201510099342 |
| Oct 7, 2015 | otc alterations permit: 11th floor: demo non structural glazing, partitions, lighting, electrical, finishes. no change in occupancy, use or area. mep under sep permit. n/a for maher | Electrical | $29,337 | — | Finaled Apr 19, 2016 | 201510058778 |
| Sep 25, 2015 | otc alterations permit: 9th floor, fire alarm work for the "arnold & porter: ti remodel on floor 9; additions are 3 duct detectors, 6 speakers, 1 speaker/strobe and 6 strobes, 1 speaker and 2 strobes are also relocated. ref pa 2015-0527-7275. t-24 mep #201506118773 is on the plans. n/a for maher | Heating and cooling | $9,950 | — | Finaled Jan 26, 2016 | 201509227645 |
| Sep 25, 2015 | otc alterations permit: 8th floor, fire alarm work for the "arnold & porter: ti remodel on floor 8; additions are 3 smoke detectors, 2 duct detectors, 1 strobe power supply, 4 speakers, 44 speaker/strobes, and 1 strobe. ref pa 2015-0520-6826. t-24 mep app# 201506037999 is now on the plans. n/a for maher | Heating and cooling | $29,500 | — | issued | 201509227643 |
| Jun 23, 2015 | otc alterations permit: 9th floor: mechanical electrical, plumbing. t.i. to install new equipment and fixtures. ref. t.i. appl. #2015.05277.7275. maher n/a | Plumbing | $450,000 | — | issued | 201506118773 |
| Jun 23, 2015 | otc alterations permit: 8th floor: mechanical, electrical, plumbing to install new equipment and fixtures. ref app#201505206826 for t.i. work. n/a for maher | Plumbing | $1,800,000 | — | issued | 201506037999 |
| Jan 28, 2015 | otc alterations permit: 14th floor suite 1450 - electrical t-24 for work done under pa #2014.1218.3994. n/a maher ordinance | Electrical | $23,000 | — | Finaled Jul 2, 2015 | 201501276816 |
| Jan 5, 2015 | otc alterations permit: 14th floor - non-structural demo, new non-structural partitions, glass, electrical, finishes, millwork. no change in occupancy, use, area. n/a maher ordinance | Electrical | $125,000 | — | Finaled Mar 26, 2015 | 201412183994 |
On Embarcadero Center
377 permits on record on Embarcadero Center.
| Trade | Permits | Since Oct 5, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 2 | 0 | — | under 5 | Feb 16, 2024 |
| Electrical | 182 | 22 | $167,500 | $50,645–$684,500 | Oct 1, 2026 |
| Heating and cooling | 122 | 17 | $131,940 | $37,005–$930,000 | Jul 9, 2026 |
| Plumbing | 69 | 7 | $1,660,000 | $534,232–$5,150,000 | Jul 23, 2026 |
| Water heater | 2 | 0 | — | under 5 | Nov 3, 2022 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 5, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 5, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 5, 2026. Owner names are not shown on any page.