4 Embarcadero Center, San Francisco
106 home-service permits on record at 4 Embarcadero Center, San Francisco; no roofing permit on record.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Jul 9, 2026 | otc alterations permit: 28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833 | Heating and cooling | $750,000 | — | issued | 202606183542 |
| Apr 21, 2026 | otc alterations permit: 8/f: permit ref# 202512091273 - deferred mech and electrical permit. mech: minor air distribution ungrades to the common area restrooms and corridors. electrical: new lighting fixtures, associated circuiting/controls, power devices, associated wiring | Electrical | $100,000 | — | Finaled May 29, 2026 | 202604159468 |
| Jan 29, 2026 | otc alterations permit: 25/fl- suite 2500- non structural parittions, ceilings, finishes, associated mechanical and electrical work | Electrical | $1,001,285 | — | Finaled Jun 16, 2026 | 202512302947 |
| Jan 21, 2026 | otc alterations permit: 14/f: fire only work for the remodel done under permit 202508082665. additions are 23 smoke detectors, 1 duct detector, 4 pull stations, 12 modules, 47 speakers, 42 speaker/strobes, and 2 strobes | Heating and cooling | $107,880 | — | issued | 202601214187 |
| Dec 18, 2025 | otc alterations permit: 8th fl - interior demo non-structural partitions, doors, millwork, ceilings flooring, finishes, hvac, electrical, plumbing and equipment; build back of restroom remodel, new demising partitions and tenant doors and new common corridor and elevator lobby finishes and ceilings | Heating and cooling | $476,317 | — | Finaled Aug 13, 2026 | 202512091273 |
| Dec 9, 2025 | otc alterations permit: 23/fl- ref 202506108325- electrical power lighting and signal | Electrical | $50,000 | — | issued | 202511250459 |
| Oct 31, 2025 | otc alterations permit: 32/f: suite #3200 - alteration of 2 private offices by moving shared wall. work will enlarge 1 office and reduce the size of the second.electrical and data work, glazin at to offices to be reconfigured. replacememt of crpet tiles | Electrical | $85,000 | — | Finaled Feb 3, 2026 | 202510036702 |
| Oct 2, 2025 | otc alterations permit: 13/f: mep. new ducts, heating cooling, lighting, power and plumbing. ref permit 202508112754 | Heating and cooling | $1,200,000 | — | issued | 202509115078 |
| Oct 2, 2025 | otc alterations permit: 14th fl ref pa # 2025-0808-2665. mep new ducts, heating, cooling, lighting, power and plumbing | Heating and cooling | $1,200,000 | — | issued | 202509105013 |
| Oct 1, 2025 | otc alterations permit: 26/f suite 2610: deferred mechanical and electrical for permit 202508294183. mech - removal of registers, ductwork, install new cooling vavs, new supply/return registers, relocate thermostats, air balancing. elec - lighting fixtures, asso. circuiting/controls, power, signal devices, wiring | Electrical | $200,000 | — | issued | 202509306413 |
| Aug 21, 2025 | otc alterations permit: suite 3120 31st fl ref pa # 202505287367. remove heatpump & pump | Heating and cooling | $1 | — | Finaled Dec 4, 2025 | 202508062447 |
| Aug 14, 2025 | otc alterations permit: ll2: partial demolition of existing interior non bearing partiton. removal of interior door, infill of non bearing interior partition to match. existing wall condition at previous door opening. elec, hvac, lighting to remain. no alterations | Heating and cooling | $82,566 | — | Finaled Dec 3, 2025 | 202507020049 |
| Jul 28, 2025 | otc alterations permit: electrical/lighting for restroom upgrades at 13th and 14th floors. ref 202505096175 13th, 202505096131 14th | Electrical | $20,000 | — | Finaled Aug 25, 2025 | 202507160897 |
| Jun 2, 2025 | otc alterations permit: suite 3120 ref pa # 2025-0411-4228: mech- new single duct vav boxes, new water source heat pump, new circulation condenser water pump & new ductwork & air distribution . electrical- power, lighting & signal | Heating and cooling | $150,000 | — | Finaled Dec 4, 2025 | 202505287367 |
| Sep 10, 2024 | otc alterations permit: 36/f: deferred electrical permit. ref pa# 202402135797. common corridor, elevator lobby and restroom light fixture replacement and power for water fountains | Electrical | $50,000 | — | Finaled Oct 11, 2024 | 202408299716 |
| Jul 25, 2024 | otc alterations permit: 22nd/f: demo of non-structural partitions & new construction of non-structural partitions including new millwork. mech & electrical | Electrical | $2,683,000 | — | issued | 202406275406 |
| Jul 25, 2024 | otc alterations permit: 10/f: demo, non structural partitions. construction of new non structural partitions & finishes. mechanical & electrical | Electrical | $1,000,000 | — | issued | 202406134380 |
| Apr 26, 2024 | otc alterations permit: 9/f: mechanical - new exhaust fans, ductwork, heat pump. electrical - power and lighting. ref pa 202404160076 | Heating and cooling | $550,000 | — | issued | 202404240632 |
| Apr 12, 2024 | otc alterations permit: 28th and 29th floors:adjacent mech & electrical etc. for reducing the rented space, refurning a portion of the 28th floor back to the owner. 28th floor have an extg communication stair which they will retain. ref arch. set pa# 202403298897 | Electrical | $60,000 | — | Finaled Aug 14, 2024 | 202404129867 |
| Apr 3, 2024 | otc alterations permit: deferred mechanical and electrical (ref pa# 202403046974). mechanical - hvac modifications to support interior ti. electrical - lighting fixtures and associated circuiting/controls. power and signal devices and associated wiring | Heating and cooling | $200,000 | — | Finaled Oct 11, 2024 | 202404039203 |
| Mar 11, 2024 | otc alterations permit: ref pa 202312061995 new power & data & lighting. modification of existing mechanical hvac & reconfigure of ductwork. new supplemental water source heat pump circulation pump & ceiling exhaust fan | Heating and cooling | $520,000 | — | Finaled Dec 12, 2024 | 202402236416 |
| Dec 4, 2023 | otc alterations permit: 15th fl - deferred mechanical & electrical . mechanical - demo & revise ductwork & diffusers. relocate lienar slot diffusers; furnish & install new duct & diffusers. blance terminal units; electrical - lighting fixtures & assoc circuiting/controls. power & signal device | Heating and cooling | $120,000 | — | Finaled Jan 11, 2024 | 202312041842 |
| Jul 18, 2023 | otc alterations permit: ste 710 - 7th flr: deferred mechanical + electrical (demo low pressure cooling branch ducts, exhaust fans + duct + pneumatic vav boxes, install new vav boxes, ltg, fixtures, and associated circuiting/controls, power + signal devices. ref pa# 2023-0530-8775 | Heating and cooling | $195,000 | — | Finaled Oct 6, 2023 | 202307172304 |
| Mar 28, 2023 | additions alterations or repairs: 1st fl tenant improvement for fedex office store. new finishes, graphics, lighting, new and relocated fixtures, equipment, relocated plumbing fixture, new mop sink, new restroom accessories, distribution of phone and pwr/data to equipment. mod mech, elec, plumbing work and mod to sprinkler/fire sys | Plumbing | $434,835 | — | Finaled Aug 14, 2023 | 202208120488 |
| Feb 23, 2023 | otc alterations permit: deferred electrical permit 202211227006 | Electrical | $50,000 | — | Finaled Jun 1, 2023 | 202302232434 |
| Oct 24, 2022 | otc alterations permit: 26/f suite 2600: mechanical and electrical work for ti. ref arch. permit 202206216646 | Electrical | $199,000 | — | Finaled Feb 15, 2023 | 202209082080 |
| Sep 27, 2022 | otc alterations permit: 30/f: fire alarm ti: full floor "vista equity" removal, addition of smoke detectors, duct detector, pull stations, modules, speakers, speaker/strobes, strobes. ref bpa#202207057733 | Heating and cooling | $64,800 | — | issued | 202209273167 |
| Sep 27, 2022 | otc alterations permit: 30th fl - mechanical and electrical for permit # 202207057733 | Electrical | $700,000 | — | Finaled Feb 27, 2023 | 202209233069 |
| Sep 8, 2022 | otc alterations permit: suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225 | Electrical | $25,000 | — | Finaled Oct 6, 2022 | 202209082084 |
| Jun 6, 2022 | otc alterations permit: suite 3660: deferred mechanical & electrical permit. ref t.i. pa 202203170209. maher n/a | Electrical | $1 | — | Finaled Sep 8, 2023 | 202206065644 |
| Apr 27, 2022 | otc alterations permit: 30th floor: demo of non load bearing partitions, doors/glazing, ceilings, finishes, mech, electrical, & plmg. srpinkler permit ref pa# 202204252880 | Electrical | $125,000 | — | Finaled Feb 22, 2023 | 202204273075 |
| Mar 17, 2022 | otc alterations permit: 36/f suite 3660: interior ti. new construction includes new interior partitions, ceilings, mechanical, electrical, lighting, millwork. life safety, fire sprinkler, and mep deferred. no exterior work, no hazmat, no structural | Electrical | $125,000 | — | Finaled Aug 17, 2022 | 202203170209 |
| Dec 13, 2021 | otc alterations permit: 36/f: mechanical and electrical work for tenant improvement. ref t.i pa 202107194589 | Electrical | $15,000 | — | Finaled Apr 11, 2022 | 202112013431 |
| Nov 23, 2021 | otc alterations permit: 37th/f t.i.: selective demo & construction of new non structural partitions, ceiling lights, doors/windows, electrical, millwork and finishes. no change of occupancy use or area. life safety and sprinklers are design-build | Electrical | $1,202,422 | — | Finaled Jun 8, 2022 | 202111192772 |
| Nov 18, 2021 | otc alterations permit: 31/f ste 3150 t.i.: demo of non-structural partitions and build new partitions.new or revised mech and electrical including in this set, life safety & fire sprinklers under sep permits. building has f/s. maher n/a | Electrical | $650,000 | — | Finaled Jun 10, 2022 | 202111152334 |
| Oct 6, 2021 | otc alterations permit: partial office ti on 32nd fl. 21,500 sf. incl new private offices partial restroom remodel. encl stair to 31st fl w/2hr rating no changes to site, ext appear or bldg struc are required. modifications to mech, elec, plumb, automatic fire sprinkler and fire alarm to be submitted under sep permits | Plumbing | $1,200,000 | — | Finaled Apr 15, 2022 | 202109178613 |
| Sep 30, 2021 | otc alterations permit: new interior improvement on the 36/f, new non-structural partitions, doors and hardware, glazing and frame and new ceiling. elect and hvac under sep permit | Heating and cooling | $100,000 | — | Finaled Apr 11, 2022 | 202107194589 |
| Aug 11, 2021 | otc alterations permit: 20/f: converting open office area 20024 to a fix office including full neight wall and interior storefront system and new security doors as outlined in accociated document. hvac system to remain | Heating and cooling | $22,160 | — | Finaled Sep 9, 2021 | 202108045733 |
| Jun 29, 2021 | otc alterations permit: 34th floor: select demo of non str. partitions, doors, glazing, lights and finishes. construct new non structural partition, doors/glazing lights & finishes. electrical & mech included in this permit | Electrical | $139,860 | — | issued | 202106071844 |
| Apr 30, 2021 | otc alterations permit: 19/f: mechanical, electrical and plumbing plans for approved pa 202101042019 | Plumbing | $1 | — | Finaled Nov 10, 2021 | 202104027828 |
| Apr 1, 2021 | otc alterations permit: fire only work for the "genstar" remodel on floor 19; additions are 23 smoke detectors, 3 duct detectors, 8 modules, 1 strobe power supply, 18 speakers, 39 speaker/strobes, and 13 strobes. ref. permit app # 2021 0104 2019 | Heating and cooling | $68,250 | — | Finaled Nov 29, 2021 | 202103106303 |
| Dec 17, 2020 | otc alterations permit: fire alarm "as-built" permit which indicates the deletion of 9 smoke detectors and 2 duct detectors at fsd locations where they were not required due to areas served by these fsds having smoke detector "total-coverage." ref. permit app # 2019-1112-6924 for initial permit | Heating and cooling | $1 | — | Finaled Jan 6, 2021 | 202012080569 |
| Dec 15, 2020 | otc alterations permit: 19th flr. interior demo partitions, doors, plumbing fixtures, sprinkler equipment and gtc . ab-017 applies customer supplied referenced f/s permit application 2020-1027-7517 12/3/2020-rl | Plumbing | $100,000 | — | Finaled Nov 10, 2021 | 202009124077 |
| Nov 3, 2020 | otc alterations permit: 20th fl: revision to pa# 201908158941. electrical drawings | Electrical | $25,000 | — | Finaled Dec 31, 2020 | 202009184479 |
| Sep 23, 2020 | otc alterations permit: 37th fl suite 3700 mechanical and electrical for 201912240445 | Electrical | $320,000 | — | Finaled Jan 21, 2021 | 202008202208 |
| Aug 26, 2020 | otc alterations permit: fire alarm revisions to reflect "as built" installation for the stockbridge remodel on floor 33; the changes result in the addition of 2 duct detectors & 4 modules, as well as the deletion of 1 smoke detector from original fa pa #2020-0110-1600 | Heating and cooling | $4,535 | — | issued | 202008061288 |
| Jan 10, 2020 | otc alterations permit: fire alarm work for the stockbridge remodel on floor 33, additions are 8 smoke detectors, 1 duct detector, 1 strobe power supply, 5 speakers, 40 speaker/strobes, 7 strobes | Heating and cooling | $26,365 | — | Finaled Jul 31, 2020 | 202001101600 |
| Nov 13, 2019 | otc alterations permit: new interior improvements noin structural partitions, new wall and flooring finishes, new millwork, plumbing fixtures, dfh, glazing and frames, meps fire alarm deferred maher not req | Plumbing | $2,500,000 | — | Finaled Aug 10, 2020 | 201911127069 |
| Nov 12, 2019 | otc alterations permit: ref pa# 201908088332; fire alarm work for the "marsh & mclennen" remodel of fl 11; additions are 16 smoke detecors, 12 duct detectores, 3 modules, 4 speakers and 15 speakr/strobes | Heating and cooling | $42,730 | — | Finaled Jan 6, 2021 | 201911126924 |
| Oct 17, 2019 | otc alterations permit: mechanical and electrical work tenant improvement for suite 3740 ref 201908280107 | Electrical | $150,000 | — | Finaled Jan 30, 2020 | 201909303052 |
| Sep 23, 2019 | otc alterations permit: 4th fl - fire alarm work for the "mmc" additions are 10 smoke detectors, 9 duct detectors, 1 strobe power supply, 33 speaker/strobes and 15 strobes ref pa 2019-0606-2703 | Heating and cooling | $51,400 | — | Finaled Dec 2, 2020 | 201909232307 |
| Sep 23, 2019 | otc alterations permit: 2nd fl - fire alarm work for the "mmc" additions are 8 smoke detectors, 11 duct detectors, 1 module, 1 strobe power supply, 39 speaker/strobes and 17 strobes ref pa 2019-0522-1464 | Heating and cooling | $58,700 | — | Finaled Dec 2, 2020 | 201909232305 |
| Sep 23, 2019 | otc alterations permit: 3rd fl - fire alarm work for the "mmc" remodel; additions are 14 smoke detectors, 15 duct detectors, 4 door holders, 1 strobe power supply, 47 speaker/strobes and 18 strobes. ref pa 2019-0528-1822 | Heating and cooling | $66,000 | — | Finaled Dec 3, 2020 | 201909232304 |
| Aug 16, 2019 | otc alterations permit: 25th fl - fire alarm work for "barclays"; additions are 7 smoke detectors, 9 duct detectors, 3 modules, 1 strobe power supply, 35 speaker/strobes and 5 strobes. ref pa 2019-0520-1181 | Heating and cooling | $46,700 | — | issued | 201908158892 |
| Aug 13, 2019 | otc alterations permit: 25/f: title 24 compliance: electrical for pa201812037203, 201903124971 & 20907236645. maher n/a | Electrical | $1 | — | Finaled Feb 5, 2020 | 201908128481 |
| Aug 8, 2019 | otc alterations permit: 1st fl - fire alarm work for the "lobby" remodel; additions are 8 smoke detectors, 1 duct detector, 1 pull station, 1 module and 5 speaker/strobes | Heating and cooling | $10,900 | — | Finaled Oct 16, 2020 | 201908088222 |
| Jul 29, 2019 | otc alterations permit: 40th floor: t-24 mechanical to construct new hvac systems . please refer app#201906133329 for t.i. work. n/a for maher | Heating and cooling | $187,185 | — | Finaled Feb 6, 2020 | 201907297233 |
| Jul 29, 2019 | otc alterations permit: 39th floor: t-24 mechanical to construct new hvac systems . please refer app#201906133328 for t.i. work. n/a for maher | Heating and cooling | $147,440 | — | Finaled Feb 6, 2020 | 201907297232 |
| Jul 17, 2019 | otc alterations permit: 37 & 38/f: revision to pa 2019-0509-0198 non-structural demo partitions, plumbing fixtures, accessories finishes. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit | Plumbing | $25,000 | — | Finaled Nov 5, 2020 | 201906143420 |
| Jul 12, 2019 | otc alterations permit: 40th fl - title 24 electrical to add new lighting and power system on 40th floor. ref pa 2019-0613-3329 for ti work | Electrical | $52,269 | — | Finaled Feb 6, 2020 | 201907115693 |
| Jul 12, 2019 | otc alterations permit: 39/f: t24 electrical to add new lighting and power systems on 39th flr ref 201906133328 for ti work | Electrical | $52,269 | — | Finaled Feb 6, 2020 | 201907115692 |
| Jun 25, 2019 | otc alterations permit: 25th floor: mechanical, electrical, & plmg t.i. app#201905201181 n/a for maher | Electrical | $1 | — | issued | 201905291924 |
| Jun 5, 2019 | otc alterations permit: 37th and 38th floor: mechanical, plumbing, and electrical for 201905090198. n/a for maher | Plumbing | $1,300,000 | — | Finaled Nov 5, 2020 | 201905211279 |
| Jan 31, 2019 | otc alterations permit: 34/f: mechanical and electrical title 24 compliance for pa201812118012. maher n/a | Electrical | $15,000 | — | Finaled Apr 23, 2019 | 201901301585 |
| Jan 7, 2019 | otc alterations permit: electrical work for ti at suite 1200. ref pa #201811206388 | Electrical | $6,900 | — | issued | 201901039542 |
| Oct 12, 2018 | otc alterations permit: suite 3460, 34th flr. electrical and mechanical work for tenant improvement. maher n/a. ref pa 201808248221 | Electrical | $75,000 | — | Finaled Jan 24, 2019 | 201810032184 |
| Oct 10, 2018 | otc alterations permit: 15th flr. electrical and mechanical for t.i pa # 201808147301 | Electrical | $1 | — | Finaled Jan 28, 2019 | 201810032140 |
| Aug 22, 2018 | otc alterations permit: 29th flr - electrical to support approved arch. new recepticles & power ref 201808016114 | Electrical | $75,000 | — | Finaled Aug 20, 2019 | 201808157396 |
| Aug 9, 2018 | otc alterations permit: 27th flr - fire alarm "drinker biddle" add 4 smk dets, 3 duct dets, 14 speakers, 31 speaker/strobes and 4 strobes. maher na ref#201805189519 | Heating and cooling | $38,000 | — | Finaled Oct 16, 2018 | 201808096864 |
| Feb 27, 2018 | otc alterations permit: 26th floor - fire alarm work - install 2 duct detectors, 5 speaker/strobes and relocate 1 speaker and 1 strobe. pa#201801037736 n/a for maher | Heating and cooling | $6,340 | — | Finaled Mar 19, 2018 | 201802272278 |
| Feb 8, 2018 | otc alterations permit: 26th flr - furnish and install heat pump, diffusers and ductwork as necessary ref arch 201801037736 maher na | Heating and cooling | $20,000 | — | Finaled May 8, 2018 | 201802080715 |
| Sep 15, 2017 | otc alterations permit: fire alarm permit #2, fire alarm for on floor 5, "matthews asia"; additions are 2 smoke detectors and 1 duct detector. maher na permit #1 is application #201705096001. ref permit app # 201703171663 | Heating and cooling | $1,830 | — | issued | 201709158366 |
| May 26, 2017 | otc alterations permit: mechanical & electrical scope ref pa 2017-0316-1581 | Electrical | $75,000 | — | issued | 201705257599 |
| May 11, 2017 | otc alterations permit: partial floor ti includes partition, mech/elec/plumbing, ceiling lighting and finishes. no plumbing or structural. maher na | Plumbing | $690,000 | — | Finaled Oct 2, 2017 | 201703171663 |
| May 9, 2017 | otc alterations permit: 5th floor - fire alarm work for the "matthews" remodel on floor 5; additions are 1 duct detector, 6 speaker/strobes, and 3 strobes. ref pa 2017-0317-1663. maher na | Heating and cooling | $5,200 | — | issued | 201705096001 |
| May 9, 2017 | otc alterations permit: 6th floor - fire alarm work for the "matthews" remodel on floor 6; additions are 1 smoke detector, 6 duct detectors, 1 strobe power supply, 33 speaker/strobes, 8 speakers, and 7 strobes. ref pa 2017-0420-4434. maher na | Heating and cooling | $31,000 | — | Finaled Jul 19, 2017 | 201705095996 |
| Apr 21, 2017 | otc alterations permit: 26th floor: t-24th electrical for work under app#201702109129. n/a for maher | Electrical | $3,000 | — | Finaled Sep 8, 2017 | 201704214567 |
| Mar 29, 2017 | otc alterations permit: 26th floor: non-structural demo, new non-structural partitions, lighting, ceiling, plumbing fixtures finishes at restrooms and elevator lobby. no change in occupancy, use or area, mep, l/s, sprinklers under seperate permit. n/a for maher | Plumbing | $157,000 | — | Finaled Sep 7, 2017 | 201702109129 |
| Mar 6, 2017 | otc alterations permit: 26/f #2640 - mechanical & electrical. ref. to pa#2016-1216-5257 -architectural drawing. maher ord 155-13 na | Electrical | $30,000 | — | issued | 201702229868 |
| Feb 10, 2017 | otc alterations permit: 25th flr: t-24 electrical for work under:201602240335 maher na | Electrical | $10,000 | — | Finaled Mar 1, 2017 | 201702099094 |
| Feb 9, 2017 | otc alterations permit: construction of a common corridor between two tenant office spaces on a single floor with new light fixtures, fire sprinkler & hvac adjustments | Heating and cooling | $199,000 | — | issued | 201612205429 |
| Jan 31, 2017 | otc alterations permit: 26th flr: t-24 electrical for work donw under 201609087034. maher na | Electrical | $1 | — | Finaled Mar 16, 2018 | 201612235813 |
| Jan 3, 2017 | additions alterations or repairs: basement. installation of supply and exhaust ventilation system for the fire pump room. no change in building envelope. includes associated electrical work, and removal and replacement fire pumps. maher n/a | Electrical | $230,000 | — | Finaled Sep 8, 2017 | 201607293740 |
| Dec 28, 2016 | otc alterations permit: 6th floor:demo of nonstructural partitions, finishes, electrical and plumbing. n/a for maher per ab17 | Plumbing | $111,142 | — | issued | 201612074353 |
| Dec 9, 2016 | otc alterations permit: exterior work. interior improvements to accomodate a new ground floor quick service restaurant. the scope includes new fixtures, finishes and plumbing. n/a for maher. mechanical, electrical, plumbing, fire alarm/sprinklers and ansul under separate permit | Plumbing | $70,000 | — | Finaled Feb 9, 2017 | 201612024035 |
| Sep 22, 2016 | otc alterations permit: 24th flr: add 5 smoke detectors, 7 duct detectors, 1 strobe power supply, 9 speakers, 33 speaker/strobes, 5 strobes ref 2016-0729-3777. n/a for maher | Heating and cooling | $33,330 | — | Finaled Nov 8, 2016 | 201609228463 |
| Aug 25, 2016 | otc alterations permit: 24th floor: electrical only for ref pa 201607293777. maher na | Electrical | $1 | — | Finaled Mar 21, 2017 | 201608165117 |
| Aug 4, 2016 | otc alterations permit: 3rd floor - non-structural demo glazing & doors, electrical, finishes. no change in occupancy use, or area. mep, life safety, sprinklers under separate permit | Electrical | $34,398 | — | Finaled Nov 29, 2016 | 201608034086 |
| Aug 3, 2016 | otc alterations permit: 24th floor: ti - full floor single tenant; new non load bearing partitions, mep, ceilings, lighting, finishes, except electrical under separate permit. maher n/a | Electrical | $1,000,000 | — | Finaled Nov 10, 2016 | 201607293777 |
| Apr 19, 2016 | otc alterations permit: renovation of core restrooms on floor 28 & 29 to include new non-structural partitions, new ceilings & lights, new finishes & plumbing fixtures and associated mep. maher na | Plumbing | $225,000 | — | Finaled Feb 2, 2017 | 201604185054 |
| Mar 7, 2016 | otc alterations permit: 25th floor - new toilet rooms, plumbing fixtures, accessories & finishes. no hcange in occupancy, use, or area. mep under separate permit. n/a maher ordinance | Plumbing | $100,000 | — | Finaled Mar 1, 2017 | 201602240335 |
| Feb 2, 2016 | otc alterations permit: non-structural demo non-structural partitions ceiling, lights, electrical, millwork, toilet room upgrades. no change in use, occupancy or area. mep, sprinkler, life safety under sep permit | Electrical | $260,260 | — | Finaled Jun 20, 2016 | 201601278063 |
| Jan 6, 2016 | otc alterations permit: install 2 omnidirectional antennas on rooftop. install 1 equipment cabinet on rooftop. install 1 gps unit on rooftop. utilize existing electrical panel for electrical source. run coax cables from antennas to equipment cabinet. to meet lod. maher n/a | Electrical | $5,000 | — | Finaled Aug 4, 2016 | 201601066421 |
| Dec 30, 2015 | otc alterations permit: 34th flr: t-24 electrical for work done under pa 201512013805; maher n/a | Electrical | $16,500 | — | Finaled Jun 20, 2016 | 201512306174 |
| Nov 23, 2015 | otc alterations permit: fire alrm work for the "sheppard mullin" ti remodel on floor 17; additions are 9 smoke detectors, 3 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 11 speakers, 37 speakers/strobes, and 2 strobes. ref pa 2015-0930-8413. maher na | Heating and cooling | $35,900 | — | Finaled May 18, 2016 | 201511203190 |
| Nov 23, 2015 | otc alterations permit: fire alarm work for the "shepparn mullin" ti remodel on floor 18; additions are 8 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 13 speakers, 32 speaker/strobes, and 2 strobes. ref pa 2015-0909-6437 | Heating and cooling | $33,200 | — | Finaled Jan 15, 2016 | 201511203189 |
| Nov 23, 2015 | otc alterations permit: fire alarm work for the sheppard mullin ti remodel on floor 16. additions are 9 smoke detectors, 4 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 10 speakers, 35 speaker/strobes, 1 strobe ref 201509237782 | Heating and cooling | $34,500 | — | Finaled Aug 26, 2016 | 201511203188 |
| Sep 28, 2015 | otc alterations permit: t.i. & renovation on the 16/f which includes demolition & construction of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. no change in occupancy, use or area, fire alarm, sprinkler and convenience stair under seperate permit. n/a ordinance #155-13 | Electrical | $2,046,600 | — | Finaled Sep 26, 2016 | 201509237782 |
| Sep 28, 2015 | otc alterations permit: addition of 1 new non rated partition in tenant space on 30th floor. to create 2 offices. no electrical, mechanical, sprinklers or life saftey will be impacted by scope. minor ada upgrade in restroom. maher na | Electrical | $9,700 | — | issued | 201509036111 |
| Sep 9, 2015 | otc alterations permit: the scope of work is for t.i. & renovation on 18/f includes: demo of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. construct non-structural partitions, doors, glazing, ceiling, lighting, millwork & finishes. no change of occupancy. n/a ordinance #155-13 | Electrical | $2,124,000 | — | Finaled Apr 8, 2016 | 201509096437 |
| Jun 11, 2015 | otc alterations permit: mechanical and electrical work for ti ref pa # 2015 0506 5483. maher na | Electrical | $15,000 | — | Finaled Apr 13, 2016 | 201505287331 |
| Jun 3, 2015 | otc alterations permit: 26th flr: demo non structural partitions, electrical, finishes. no change in charge in occupancy, use or area. maher na | Electrical | $50,000 | — | Finaled Aug 3, 2015 | 201504234388 |
| Apr 6, 2015 | otc alterations permit: 7th floor:hvac for newly renovated office space. ref app#201503171044. n/a for the maher | Heating and cooling | $11,040 | — | issued | 201504032768 |
| Mar 24, 2015 | otc alterations permit: title 24 electrical for work done under 201412012670 maher not req | Electrical | $15,700 | — | Finaled Jan 20, 2016 | 201503241754 |
| Mar 4, 2015 | otc alterations permit: new plumbing fixtures, accessories, finishes, non structural demo, new non structural partitions, lighting. no change in occupancy, use, or area. maher not req | Plumbing | $100,000 | — | Finaled Jun 9, 2015 | 201502208827 |
| Jan 8, 2015 | otc alterations permit: lobby level - non-structural demo work. new partitions, lighting, electrical and finishes. no change in occupancy, use area. mep, sprinkler and life safety - under separate permit | Electrical | $100,000 | — | Finaled Jul 28, 2015 | 201412012670 |
On Embarcadero Center
377 permits on record on Embarcadero Center.
| Trade | Permits | Since Oct 5, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 2 | 0 | — | under 5 | Feb 16, 2024 |
| Electrical | 182 | 22 | $167,500 | $50,645–$684,500 | Oct 1, 2026 |
| Heating and cooling | 122 | 17 | $131,940 | $37,005–$930,000 | Jul 9, 2026 |
| Plumbing | 69 | 7 | $1,660,000 | $534,232–$5,150,000 | Jul 23, 2026 |
| Water heater | 2 | 0 | — | under 5 | Nov 3, 2022 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 5, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 5, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 5, 2026. Owner names are not shown on any page.