55 Francisco St, San Francisco
20 home-service permits on record at 55 Francisco St, San Francisco; the roof was last permitted on Nov 28, 2022 at a declared value of $381,168.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| May 15, 2025 | otc alterations permit: ste 330 - deferred electrical permit for 55 francisco ste 330 office ti. ref pa 202503242881 | Electrical | $41,910 | — | Finaled Jun 25, 2025 | 202505156558 |
| Jan 29, 2025 | otc alterations permit: 7/fl- convert office space to common corridor electrical room. minor demo of non structrual partitions. minor consturction of partitions. mech and electrical deferred | Electrical | $50,000 | — | issued | 202501218768 |
| Dec 13, 2022 | otc alterations permit: install 6 smoke detectors, 8 duct detectors, 8 control relays. 5th, 6th, 7th ref 202209092196 roof mech 202203291063 | Heating and cooling | $19,116 | — | Finaled Dec 19, 2022 | 202212138160 |
| Nov 28, 2022 | ReRoof: reroofing | Roofing | $381,168 | — | Finaled Feb 8, 2023 | 202211216946 |
| Nov 18, 2022 | otc alterations permit: 5/f: fire sprinkler. relocate sprinklers per t.i. and change out . ref permit 202209092196 | Heating and cooling | $1,800 | — | issued | 202211186900 |
| Nov 1, 2022 | otc alterations permit: att - remove & replace 4 antennas w/4 antennas; install 6 counters, 2 rectifier, 1 battery rack & 12 batteries | Solar | $42,000 | — | Finaled Oct 6, 2023 | 202204122015 |
| Oct 7, 2022 | otc alterations permit: mechanical only work to floors 5,6,7. demo fan coils and connect duct risers to ductwork distribution systems to be servied by hav under 202203291063 | Heating and cooling | $45,000 | — | Finaled Jun 22, 2023 | 202209092196 |
| Sep 2, 2022 | otc alterations permit: installation of structural steel support the new ahu that is being installed on the roof | Roofing | $105,000 | — | Finaled Jul 21, 2023 | 202203291063 |
| Apr 22, 2022 | otc alterations permit: ste 790: mechanical & electrical drawings. arch drawings under pa# 202104269325. includes new air distribution & lighting throughout the space based on new layout | Electrical | $65,000 | — | Finaled Oct 7, 2022 | 202204222765 |
| Dec 22, 2021 | otc alterations permit: #330: hvac modifications. power lighting and signal. ref app#202104239275 | Heating and cooling | $100,000 | — | Finaled Feb 16, 2023 | 202112204715 |
| May 9, 2019 | additions alterations or repairs: voluntary structural upgrade for the office building.the work is specific to the 4th floor & roof of the 4th floor annex bldg. ** maher: n/a ** | Roofing | $245,000 | — | issued | 201901311792 |
| Dec 3, 2018 | otc alterations permit: 1st fl fire alarm ti: install 9 ceiling mount strobe, install 11 ceiling mount horn-strobes, install 9 duct detectors, install 9 control relay modules | Heating and cooling | $23,800 | — | Finaled Dec 6, 2018 | 201810264199 |
| Nov 5, 2018 | otc alterations permit: sprinkler permit to corr deficiencies note in holmes fire preven survey dated 9/19/2018 to complete full bld sprinkler system per nfpa 13r and with ref to admin bulletin ab-105 dated 21st nov 2012. add ten , relocate 3 and change out 40 sprinkler heads. maher na as builts to 201810193637 | Heating and cooling | $1 | — | Finaled Nov 19, 2018 | 201811054997 |
| Jun 7, 2017 | otc alterations permit: suite 380 - electrical work for ti. ref pa 2017-0425-4861 | Electrical | $8,000 | — | Finaled Oct 26, 2017 | 201706068531 |
| May 30, 2017 | otc alterations permit: consists of demo of exiting partitions, doors, millwork, electrical, plumbing, finishes | Plumbing | $100,000 | — | issued | 201705186938 |
| Dec 5, 2016 | otc alterations permit: 5th flr, ste #500: install 10 new registers to existing duct work. ref. 201607051492 | Heating and cooling | $10,000 | — | issued | 201612024072 |
| Apr 1, 2016 | otc alterations permit: 6th, 8th fl: new ceiling horn/strobes, new ceiling strobes, duct detectors thru-out 6th fl tenant sp. wall mounted horn/strobe will be relocated @ 8th fl.all new notif. appl. shall tie into power supplies. all strobes shall be synchronized. ref #2016-0202-8592 & 2016-0302-0952 | Heating and cooling | $21,000 | — | Finaled Jun 8, 2016 | 201604013723 |
| Mar 25, 2016 | otc alterations permit: mechanical and electrical work for ti ref 201602028592 | Electrical | $800,000 | — | Finaled Jul 14, 2016 | 201603020952 |
| Jul 23, 2015 | otc alterations permit: 1st floor - fire alarm ti add new device to existing fire alarm system in new ti space. 10 horn/strobes, 1 strobe, 7 duct detectors, 1 bps | Heating and cooling | $13,800 | — | Finaled Jan 28, 2016 | 201507232249 |
| Jul 21, 2015 | otc alterations permit: suite 100 - install new electrical outlets & led light fixtures, title 24 calculation. ref #201506048157. n/a maher ordinance | Electrical | $100,000 | — | issued | 201507091040 |
On Francisco St
159 permits on record on Francisco St.
| Trade | Permits | Since Oct 5, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 84 | 14 | $22,995 | $12,860–$469,983 | Jun 25, 2026 |
| Plumbing | 35 | 2 | — | under 5 | Feb 12, 2026 |
| Heating and cooling | 18 | 0 | — | under 5 | May 10, 2024 |
| Electrical | 17 | 5 | $41,910 | $20,341–$65,000 | Nov 20, 2025 |
| Water heater | 3 | 0 | — | under 5 | Aug 13, 2018 |
| Solar | 2 | 0 | — | under 5 | Oct 30, 2023 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 5, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 5, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 5, 2026. Owner names are not shown on any page.