Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Jun 2, 2023otc alterations permit: lower level bathroom to have all plumbing fixtures removed no plumbing is to remain in the lower level bathroom, all shower tile and shower pan to be removed as well. no remodellingPlumbing$5,000—issued202305087294

On Frederick St

54 permits on record on Frederick St.

TradePermitsSince Oct 2, 2024Median declaredRangeLast
Roofing325$22,000$12,200–$62,300Oct 15, 2025
Plumbing141—under 5Jun 17, 2026
Heating and cooling40—under 5Oct 31, 2023
Electrical40—under 5Apr 28, 2023

Roof replacement cost in San Francisco

Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. This address is in that cohort. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. This address is in that cohort. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 2, 2026. Owner names are not shown on any page.