Gellert Dr, San Francisco: permits on record
22 home-service permits on record on Gellert Dr since April 9, 2015, 7 of them since October 2, 2024, at 18 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 14 permits
From Apr 9, 2015 to Oct 10, 2025. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 2 listed below. Earlier permits, 12, are on their house pages: 2023: 3 · 2022: 1 · 2021: 1 · 2020: 1 · 2019: 3 · 2016: 1 · 2015: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Oct 10, 2025 | ReRoof: re-roofing: remove and replace roofing material / existing roofing material | 2 family dwelling | $44,260 | — | 202510107147 |
| Aug 18, 2025 | ReRoof: re-roofing: remove and replace roofing material / existing roofing material | 2 family dwelling | $11,900 | — | 202508183233 |
Solar: 5 permits
From Sep 26, 2024 to Jan 6, 2025. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 4 listed below. Earlier permits, 1, are on their house pages: 2024: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jan 6, 2025 | additions alterations or repairs: revision to pa # 202408027803: installing a new roof mounted solar system 5.67kw 405 w modules. revised application for changes made in the single line diagram | 2 family dwelling | $15,001 | — | 202411145001 |
| Nov 21, 2024 | otc alterations permit: battery storage -29.2kwh. and batteries and two units powered from same temp source | vacant lot | $20,000 | — | 202411215444 |
| Nov 20, 2024 | otc alterations permit: battery storage system to provide temporary power to 2 residential dwelling units until pg&e energizes the building; 29.2 kwh; inverter ; 2 batteries | 2 family dwelling | $20,000 | — | 202411185166 |
| Oct 16, 2024 | additions alterations or repairs: install a roof mounted pv solar system. 5.74kw | vacant lot | $27,795 | — | 202406144516 |
Plumbing: 1 permit
From Apr 16, 2026 to Apr 16, 2026. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Apr 16, 2026 | otc alterations permit: remod. kitch. cabinets & relocate appliances. all walls and ceilings remain in place. elect. permit exists to replace all knob and tube. plumbing permits exists to move plumbing for kitchen sink. move gas line and install new shut off. install ice maker shut off and new water line. new insulation | 1 family dwelling | $60,000 | — | 202604169605 |
Heating and cooling: 1 permit
From Apr 26, 2016 to Apr 26, 2016. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2016: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Electrical: 1 permit
From Jun 19, 2015 to Jun 19, 2015. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2015: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.