Permits Index
3
Permits, 24 months
31 on record
18
Roofing permits
Dec 30, 2025
Last permit issued
24
Addresses with a page

Roofing: 18 permits

From Jan 8, 2015 to Dec 30, 2025. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 17, are on their house pages: 2024: 2 · 2023: 7 · 2022: 2 · 2021: 3 · 2017: 1 · 2016: 1 · 2015: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Dec 30, 2025ReRoof: re-roofing: remove and replace roofing material / existing roofing material1 family dwelling$2,000—202512302940

Solar: 8 permits

From Nov 23, 2015 to Nov 5, 2025. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 7, are on their house pages: 2024: 2 · 2015: 5.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Nov 5, 2025solar permit: installing 17 solar pv modules, 410 watts per module, total no. of rating 6.97 kw. mounted: roof, ballasted: n | installation of roof-mount, grid tied 6.97 kw solar pv system2 family dwelling$20,000—S20251015203

Plumbing: 2 permits

From Mar 25, 2022 to Mar 19, 2025. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 19, 2025otc alterations permit: replace six windows and one exterior door in same location at rear exterior. move as much exposed plumbing and electrical into wall as possible. reside w/ hardi lap siding over t1-11. all work at rear exterior. including dry rot repair at windows and door to be replaced2 family dwelling$50,000—202503192571

Water heater: 1 permit

From Aug 9, 2018 to Aug 9, 2018. Fewer than 5 water heater permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2018: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Electrical: 1 permit

From Mar 23, 2018 to Mar 23, 2018. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2018: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 1 permit

From Sep 22, 2017 to Sep 22, 2017. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2017: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.