301 Howard St, San Francisco
73 home-service permits on record at 301 Howard St, San Francisco; the roof was last permitted on Dec 13, 2023 at a declared value of $60,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Jul 2, 2026 | otc alterations permit: 3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater | Water heater | $2,733,502 | — | issued | 202604300400 |
| Jun 18, 2026 | otc alterations permit: suite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done | Electrical | $5,000 | — | Finaled Jul 30, 2026 | 202606113000 |
| Oct 14, 2025 | otc alterations permit: 11th fl: scope of wk: new ducts for heating/air, lighting, power and plumbing. reference pa#2025-0114-8262, 2025-0701-9862, 2024-0919-1121. new mechanical scope | Heating and cooling | $120,000 | — | Finaled Apr 20, 2026 | 202510066780 |
| Jul 25, 2025 | otc alterations permit: 5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferred | Electrical | $887,826 | — | Finaled Dec 29, 2025 | 202507030103 |
| Jun 23, 2025 | otc alterations permit: mechanical: modification including new vav heat pump. new supply/return registers. ref 202503242903 | Heating and cooling | $20,000 | — | Finaled Aug 5, 2025 | 202506239233 |
| Mar 24, 2025 | otc alterations permit: suite 1800: mechanical and electrical to support approved arch for office ti. ref 202412035984 | Electrical | $65,000 | — | Finaled Mar 9, 2026 | 202503172390 |
| Jan 24, 2025 | otc alterations permit: suite#1050: minor duct modifications to mech system. new lightening and power ref#202409181011 | Heating and cooling | $75,000 | — | Finaled May 19, 2025 | 202501178569 |
| Jan 24, 2025 | otc alterations permit: 17/f suite 1700: minor duct modifications to existing ductwork. new lighting and power. ref permit 202409271773 | Heating and cooling | $65,000 | — | Finaled Mar 31, 2025 | 202501148311 |
| Jan 22, 2025 | otc alterations permit: 14/fl: minor duct modifications to mech systems new lighting and power reference pa#202409251546 | Heating and cooling | $55,000 | — | Finaled Mar 28, 2025 | 202501158361 |
| Jan 15, 2025 | otc alterations permit: 11th fl: deferred electrical lighting & power for t.i. 202409191121 break area, wellness & reception | Electrical | $65,000 | — | Finaled Apr 20, 2026 | 202501148268 |
| Jan 13, 2025 | otc alterations permit: 18th fl - ti including demo and construction of selective partitions, cabinets, plumbing fixtures, ceilings and light ixtures, restroom accessibility upgrades. refurbish and modify balcony railings, new floor finishes throughout suite. mep deferred. work not visible from street | Plumbing | $218,400 | — | Finaled Mar 9, 2026 | 202412035984 |
| Oct 30, 2024 | otc alterations permit: 14th fl, ste 1440 - interior ti including new millwork and plumbing fixtures to replace existing in break area; new flushometers in restrooms, new finishes throughout suite | Plumbing | $158,000 | — | Finaled Mar 28, 2025 | 202409251546 |
| Oct 30, 2024 | otc alterations permit: 10/f ste 1050: interior ti - scope includes: selective millwork, electrical, and plumbing remodel at break area. finishes and lighting upgrades at ste 1050, common corridor and elevator lobby. restrooms upgrade | Plumbing | $103,200 | — | Finaled May 19, 2025 | 202409181011 |
| Sep 26, 2024 | otc alterations permit: 14th/f electrical work for t.i. 202408158729: additional power & tele-data | Electrical | $10,523 | — | Finaled Oct 18, 2024 | 202409261724 |
| Aug 23, 2024 | otc alterations permit: 14/f suite 1400: hvac modification to support interior tenant improvements no new fsd's ref pa# 2024-0530-3259 | Heating and cooling | $17,500 | — | Finaled Oct 18, 2024 | 202408239326 |
| Aug 13, 2024 | otc alterations permit: 14th fl ref pa# 2024-0530-3259 add relocate changeout fire sprinkler per ti sub# 24-652 | Heating and cooling | $3,346 | — | Finaled Sep 19, 2024 | 202408138506 |
| Dec 13, 2023 | otc alterations permit: install pedestals with portable davits on building roof and balconies. only exterior work | Roofing | $60,000 | — | expired | 202308174636 |
| Nov 3, 2023 | otc alterations permit: 14th fl hvac modification to support approved arch drawings. ref 202309196897 | Heating and cooling | $100,000 | — | Finaled Apr 26, 2024 | 202310128564 |
| Nov 9, 2021 | otc alterations permit: 16/f: restrooms - new lgihting & electrical controls for title 24 compliance. ref pa201910316064 t.i. maher n/a | Electrical | $1 | — | issued | 202111092065 |
| Nov 9, 2021 | otc alterations permit: 16/f: title 24 compliance. electrical plans for pa201910316068 | Electrical | $1 | — | issued | 202111041825 |
| Nov 8, 2021 | otc alterations permit: 5/f suite 575: electrical. new power and data for training room. new lighting and controls. ref. pa 201910316068 | Electrical | $1 | — | issued | 202111041790 |
| Sep 30, 2021 | otc alterations permit: roof level: evac sign submittal per request of fire nov 2108-0103 | Roofing | $1 | — | issued | 202109148346 |
| May 17, 2021 | otc alterations permit: 10th fl / ste 1050: mechanical & electrical work for tenant improvement. ref arch pa# 202011249562 | Electrical | $125,000 | — | Finaled Jun 15, 2021 | 202103116421 |
| Mar 30, 2021 | otc alterations permit: mech, electrical, and plumbing for tenant improvement on the 20th & 21st floor. ref arch pa#202009023295 | Plumbing | $1 | — | issued | 202011068447 |
| Mar 23, 2021 | otc alterations permit: fire alarm ti: adding power supply, smoke detectors, speaker-strobes, speakers, duct detector & relay module to existing nfs-3030d fire alarm | Heating and cooling | $16,000 | — | Finaled Apr 28, 2021 | 202012231615 |
| Dec 11, 2020 | otc alterations permit: 5/f:ti-combine 2 occupied office suites to include selective demot of non-structural partitions, doors, sidelights, celings & finishes; new non-structural partitions, door frame, hardware; new ceiling, lighting, electrical, plumbing, mehcanica & life safetey to tie into , new finishes | Plumbing | $94,494 | — | Finaled Jul 20, 2022 | 201910316068 |
| Dec 1, 2020 | otc alterations permit: 13/f: mechanical & electrical work for t.i. ref pa202009144100. maher n/a | Electrical | $95,000 | — | Finaled Aug 5, 2021 | 202010267431 |
| Oct 15, 2020 | otc alterations permit: 18/f: mechanical & electrical work for t.. on the 18/f. ref ti pa 202007069647. maher n/a | Electrical | $125,000 | — | Finaled Mar 25, 2021 | 202009265032 |
| Feb 21, 2020 | additions alterations or repairs: fire alarm permit #2018-0102-7671. as built fire alarm drawing for smoke management panel upgrades | Electrical | $1 | — | Finaled Aug 10, 2020 | 202002124291 |
| Aug 19, 2019 | otc alterations permit: ref pa# 201905221346 ; mechanical and electrical work for t.i. on the 14th fl | Electrical | $166,000 | — | Finaled Feb 20, 2020 | 201908158893 |
| Feb 13, 2019 | otc alterations permit: all work on the 4th floor: mechanical and electrical work per plans | Electrical | $250,000 | — | issued | 201902132803 |
| Dec 14, 2018 | otc alterations permit: 15th fl - ref pa 2018-0628-3226, original fire alarm permit 2018-0822-7979 revision & as built drawing; change quantities for smoke detector from 4 to 3; duct detector from 4 to 3; relay modules from 1 to 3 | Heating and cooling | $5,300 | — | issued | 201812148425 |
| Sep 11, 2018 | otc alterations permit: t-24 electrical for work under pa# 201802161502 | Electrical | $6,000 | — | Finaled Jan 30, 2019 | 201809119665 |
| Aug 24, 2018 | otc alterations permit: t-24 mechanical and electrical for work under pa#2018-05-07-8327. maher n/a | Electrical | $147,582 | — | Finaled Mar 5, 2019 | 201808238170 |
| Aug 22, 2018 | otc alterations permit: 15/f:fire alarm ti on e nfs2-3030 adding 1 strobe power supply, 3r speaker strobes, 1 strobe, 7 speakers, 4 smoke detectors, 4 duct smoke detectors, 1 relay modules, 1 monitor module | Heating and cooling | $16,200 | — | Finaled Oct 31, 2018 | 201808227979 |
| Aug 8, 2018 | otc alterations permit: 9th floor: t-24 mechanical and electrical for work under app#201806202362. n/a for maher | Electrical | $118,000 | — | Finaled Jan 11, 2019 | 201808076715 |
| Aug 8, 2018 | otc alterations permit: 3rd floor: t-24 electrical for work under app#201805219627. n/a for maher | Electrical | $73,000 | — | Finaled Nov 15, 2018 | 201808076713 |
| Jul 11, 2018 | otc alterations permit: 15th floor: t.i. demo of extg non-structural interior partitions, doors, sidelights,nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mech. & life safety to tie into extg bldg utility. new finishes & millwork. project includes | Electrical | $1,645,719 | — | Finaled Jul 29, 2020 | 201806283226 |
| Jul 11, 2018 | otc alterations permit: of an unoccupied tenant suite on a multi-tenant fl. selective demo of non-structural interior partitions, doors, sidelights, ceiling & finishes, new non-structural partitions, door, frame, hardware, new lighting, electrical, plumbing, mech & life safety to tie into bldg utilities, new | Plumbing | $374,253 | — | Finaled Jan 11, 2019 | 201806202362 |
| May 30, 2018 | otc alterations permit: ste 700 - ti of an , untoccupied full floor. selective demon, light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mech, life safety to tie into bldg utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety under | Plumbing | $240,000 | — | Finaled Jan 11, 2019 | 201804307711 |
| May 29, 2018 | otc alterations permit: this is a 12,305sqft interior improvement on 17th fl of existing 23 story building. the work includes new partitions, doors, ceilings, plumbing fixtures in break room area and modify existing ducts. maher na | Heating and cooling | $1,500,000 | — | issued | 201805250156 |
| May 24, 2018 | otc alterations permit: of unoccupied full fl. 3rd fl ti. selective demo of non-structural interior partitions, doors, sidelights, non-structural partition, door/frame/hardware, lighting, elect, plumbing, & life safety to tie into bldg utilities . finishes & millwork. maher na | Plumbing | $300,000 | — | Finaled Nov 15, 2018 | 201805219627 |
| Apr 30, 2018 | otc alterations permit: 20th & 21st fl - t-24 electrical for work under pa 2017-1204-5370 and pa 2017-1204-5372 | Electrical | $198,000 | — | issued | 201804307718 |
| Apr 18, 2018 | otc alterations permit: install grease exhaust duct system for restaurant. relocate utilities as needed | Heating and cooling | $100,000 | — | Finaled Oct 11, 2018 | 201804116046 |
| Mar 7, 2018 | otc alterations permit: 1st fl fa ti to e am 2020 fire alarm system, add 9 new speaker/strobe, 1 new strobe, 2 duct smoke detector, and 1 addressable control module to smite 130. maher na | Heating and cooling | $10,300 | — | Finaled Aug 1, 2018 | 201803073054 |
| Feb 26, 2018 | additions alterations or repairs: smoke management panel upgrade. spectronic mx system is obsolete & will be replaced w/ a notifier nfs2-3030 facv. notifier am 2020 facv is obsolete & will be upgraded to notifier nfs2-3030, includes upgrading emergency voice system. amplifier to remain | Electrical | $229,500 | — | Finaled Jul 8, 2020 | 201801027671 |
| Feb 23, 2018 | otc alterations permit: 10th fl: t-24 electrical for work under pa #201712045387. maher na | Electrical | $11,000 | — | Finaled Sep 21, 2018 | 201802222008 |
| Feb 23, 2018 | otc alterations permit: 3rd fl: t-24 electrical for work under pa #201711274768. maher na | Electrical | $11,000 | — | Finaled Jun 15, 2018 | 201802222007 |
| Dec 18, 2017 | otc alterations permit: 20th fl: selective demo e lt fixt, elec outlets. new non stuc partitoinis, door/frame hardware,new ceioing lighting, elec,plumbing, mech, ls tie into e bldg. utilitiesnew finishes, millwork. no change occupancy use. demo restrm upgrades under 201702149346. maher na | Plumbing | $835,302 | — | issued | 201712045372 |
| Dec 18, 2017 | otc alterations permit: tenant improvment 21st fl: demo o e lt fixt,elec, new non struc partitions, door/frame hardware, new ceiling lighting, elec, plumbing, mech, ls into e bldg utilities. no change occupancy use. restrm and demo under 201702149345. maher na | Plumbing | $825,162 | — | issued | 201712045370 |
| Dec 13, 2017 | otc alterations permit: 10th fl: t-24 electrical for work under pa #201711063158. maher na | Electrical | $83,000 | — | Finaled Feb 15, 2018 | 201712136334 |
| Dec 5, 2017 | otc alterations permit: 7/f- mechanical & electrical for work under pa#201706280557 & 201707242701. n/a ordinance #155-13 no new fsds | Electrical | $260,000 | — | Finaled Feb 15, 2018 | 201710040399 |
| May 4, 2017 | otc alterations permit: 21st flr #2100 -title-24 electrical for work done under pa #201702149346. n/a maher ordinance | Electrical | $8,500 | — | Finaled Jul 3, 2017 | 201705045720 |
| May 4, 2017 | otc alterations permit: 20th flr #2000 -title-24 electrical for work done under pa #201702149346. n/a maher ordinance | Electrical | $8,500 | — | Finaled Jul 3, 2017 | 201705045719 |
| Apr 28, 2017 | otc alterations permit: t24 electrical for work under 201703272389 | Electrical | $96,000 | — | Finaled Jul 3, 2017 | 201704275068 |
| Mar 16, 2017 | otc alterations permit: ste. #870: title 24 electrical lighting control. ref pa 2016-1202-4010 | Electrical | $25,000 | — | Finaled Jun 9, 2017 | 201703161585 |
| Feb 2, 2017 | otc alterations permit: ground floor: fire alarm, add 7 speaker/strobes and 2 duct detectors with relays as part of a t.i. ref app#2016-0902-6720 | Heating and cooling | $6,000 | — | Finaled Mar 1, 2017 | 201702028479 |
| Dec 20, 2016 | otc alterations permit: revision to 201609218335 electrical title 24 only for restroom upgrades. maher na | Electrical | $1 | — | Finaled Mar 7, 2018 | 201612195296 |
| Dec 15, 2016 | sign - erect: install electrical sign | Electrical | $1,000 | — | issued | 201611152811 |
| Dec 15, 2016 | sign - erect: install electrical single faced sign | Electrical | $1,000 | — | issued | 201611152809 |
| Nov 14, 2016 | otc alterations permit: 8/f- fire alarm t.i., install duct detectors, control relay module, wall mount strobes, ceiling mount speakers, pam relay module. t.i. pa#201610039355. n/a ordinance #155-13 | Heating and cooling | $3,600 | — | issued | 201611142566 |
| Sep 26, 2016 | otc alterations permit: 18th floor: t-24 electrical for work done under app#201608084411. n/a maher ord. 155-13 | Electrical | $1 | — | Finaled Apr 27, 2017 | 201609238665 |
| Jul 18, 2016 | otc alterations permit: ste. #900, 9/f- selective demo of interior non structural, non rated elements, new non structural partitions, doors & millwork, new finishes, new doors, new light fixtures. deferred submittal: mechanical, electrical, plumbing, fire & life safety, sprinklers. n/a ordinance #155-13 | Plumbing | $308,540 | — | Finaled Nov 7, 2016 | 201606089379 |
| Jun 14, 2016 | otc alterations permit: electrical work for t.i. pa#201602190027. n/a ordinance #155-13 | Electrical | $103,005 | — | issued | 201605238084 |
| May 19, 2016 | otc alterations permit: 6th floor - install 15 new light fixtures, relcoate 8 exisitng light fixtures, install 22 floor monuments in walker duct system, office switching power & data at 8 locations. ref #201604134635. n/a maher ordinance | Heating and cooling | $75,000 | — | issued | 201605177593 |
| May 19, 2016 | otc alterations permit: install 2 new vav boxes & associated duct work. re-zone existing thermostats & air balance. ref #201604134635. n/a maher ordinance | Heating and cooling | $65,000 | — | issued | 201605177589 |
| Apr 21, 2016 | otc alterations permit: 8th flr, suite 830: mech only - add 1 new vav box including duct work and controls, air balance hvac system | Heating and cooling | $22,000 | — | Finaled Mar 3, 2017 | 201604215380 |
| Mar 24, 2016 | otc alterations permit: fire alarm ti remove deiling mount speaker strobes, remove 1 wall mount speaker strobe, relocate 2 wall mount strobes, relocate e speaker strobes, 2 duct detectors with control relay modules maher not req. ref pa201602099101 | Heating and cooling | $4,500 | — | Finaled May 10, 2016 | 201603232880 |
| Oct 30, 2015 | otc alterations permit: mechanical and electrical for work done under 201509116706 maher not req | Electrical | $208,000 | — | Finaled Feb 8, 2016 | 201510301316 |
| Oct 9, 2015 | otc alterations permit: new drywall, ceilings, lighting, hvac, finishes on gr fl. n/a maher ord. 155-13 | Heating and cooling | $250,000 | — | Finaled Nov 15, 2016 | 201509288185 |
| Mar 10, 2015 | otc alterations permit: ste 500 - deferred submittal - electrical. ref #201501307073. n/a maher ordinance | Electrical | $95,000 | — | issued | 201503090294 |
| Feb 24, 2015 | otc alterations permit: 5th floor ste 500 - selective demolition of non-structural elements. construction of non-sttructural partitions, new ceiling, lighting, finishes, doors, frames & hardware. deferred submittals: mech, elect, fire/life safety, plumbing | Plumbing | $308,353 | — | issued | 201501307073 |
| Jan 5, 2015 | otc alterations permit: 4th floor:new ductwork, vav box exhaust fan and air devices, added electrical outlets, added power. all existing lighting to remain with no changes, no changes to layout of life safety devices | Electrical | $30,000 | — | Finaled Jul 8, 2016 | 201501054907 |
On Howard St
404 permits on record on Howard St.
| Trade | Permits | Since Oct 2, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 62 | 7 | $35,500 | $1–$133,764 | Jul 30, 2026 |
| Electrical | 143 | 25 | $65,000 | $2,007–$412,000 | Aug 4, 2026 |
| Heating and cooling | 133 | 20 | $75,000 | $9,300–$250,177 | Sep 21, 2026 |
| Plumbing | 56 | 19 | $138,590 | $16,000–$2,232,339 | Sep 10, 2026 |
| Solar | 6 | 3 | — | under 5 | Sep 1, 2026 |
| Water heater | 4 | 3 | — | under 5 | Jul 2, 2026 |
Roof replacement cost in San Francisco
Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 2, 2026. Owner names are not shown on any page.