Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Sep 24, 2025otc alterations permit: ground floor:t.i. to existing retail space consisting of 2 new interior doors, curtains, privacy film and applied finish treatments, repairs to existing conditions. signage replacements where room names changed mech/electrical included unit 0Electrical$125,000—issued202505287350
Sep 5, 2025otc alterations permit: fire alarm t.i. on 5th floor. add 5 speaker, 51 speaker strobes, 1 smoke detector, 4 duct detectors for fcu and 5 control relay for fcu. ref#: 202503313350 unit 0Heating and cooling$67,411—Finaled Oct 16, 2025202508273979
Aug 27, 2025otc alterations permit: 3/fl- ti 202502210777 for kitchen area to add control relays for kitchen fans shutdown, add input module for kitchen suppression system and duct for fans unit 0Heating and cooling$10,000—Finaled Sep 17, 2025202508274004
Aug 27, 2025otc alterations permit: fire alarm t.i. on 3rd flr - office space. add 1 control relay for uft. 1 dual module for fsd monitoring 1 duct detector for fsd, 19 speaker and 57 speaker strobes. ref: 202502261131 unit 0Heating and cooling$73,200—Finaled Sep 17, 2025202508273976
Jun 20, 2025otc alterations permit: 5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical ,plumbing & structural included unit 0Plumbing$5,416,864—Finaled Jan 23, 2026202503313350
May 21, 2025otc alterations permit: 3rd floor: non-structural demolition of office space. addition of prep kitchen to include walk -in cooler, cooking hood, dish clean, & misc. equipment. ancillary storage for mechanical equipment, grease interceptor & water heaters unit 0Water heater$986,000—Finaled Feb 26, 2026202502210777
Mar 21, 2025otc alterations permit: 8th fl- revision to pa #202412237306 to add selective new demo for new exhaust duct, new environmental exhuast louver added hand and prep sink, added power, new hot water pump. new exhaust fan, under floor terminal unit and equipment anchorage unit 0Heating and cooling$75,000—Finaled May 6, 2025202502210769
May 14, 2024otc alterations permit: hood and duct system installation unit 0Heating and cooling$5,000—Finaled May 31, 2024202405142053
Aug 11, 2020sign - erect: erect single faced non-electric sign unit 0Electrical$5,000—Finaled Sep 2, 2020202006018042
Oct 23, 2019sign - erect: install non-electric wall double faced sign unit 0Electrical$4,000—issued201910235293
Oct 23, 2019wall or painted sign: install non-electric single faced door window "workspace" unit 0Electrical$1,000—issued201910235291
Mar 13, 2019otc alterations permit: rev to pa# 201805078381; to remove coffee bar, millwork & associated plumbing unit 0Plumbing$1—Finaled Apr 17, 2019201902263794
Dec 7, 2018otc alterations permit: 8th fl - fire alarm ti add dual monitoring modules for fsd; 20 smoke detecors 3 duct detectors for fsds, 7 control relays for fsd, fans & kitchen suppression system. 3 ceiling speakers; 23 speaker strobes, 5 strobes & 1 monitoring module for ansul system. ref pa 2018-0808-6775 and 2018-0507-8386 unit 0Heating and cooling$18,000—Finaled Feb 4, 2019201812077754
Dec 7, 2018otc alterations permit: 3rd fl: amep full floor ti -demo of non-structural partitions, ceilings, finishes. construction of non-structural partitions, ceilings, finishes, millwork, acoustic ceiling, mechanical, electrical & plumbing. two new assembly spaces- break/lounge area 50 occ, training room . maher na unit 0Plumbing$3,772,797—Finaled Dec 10, 2024201810163273
Sep 19, 2018otc alterations permit: fire alarm - 1st flr - suite 100 & 101 add 4 duct detectors w/control for heat pump, 1 control relay for fsd, 1 smk det, 5 speaker/strobes ref 201806151997 mah ern unit 0Heating and cooling$9,000—issued201808298700
Mar 21, 2018otc alterations permit: 5th fl l- 49 speaker/strobes, 8 speakers, add 7 relay modules, add 17 smoke detectors, add 2 duct detectors unit 0Heating and cooling$47,550—Finaled Mar 30, 2018201803214219
Jan 23, 2018otc alterations permit: basement & 1st floor - construction of non-sttructural partitions, doors/frames/hardware, millwrok, drywall & acoustic ceiling grid/tile. finishes, mechanical, electrical & plumbing. fire sprinklers & life safety under separate permit unit 0Plumbing$90,150—Finaled Jul 2, 2018201712206951
Dec 6, 2017otc alterations permit: 10th flr: construction of non structural partitions, structural partitions. mezzanine, non-egres stairs, doors, frames, hardware, millwork, drywall, acoustic ceiling grid/tile, finishes, mech, elec, plumb, fire sprinkler & life saftey under deffered submittal. arch features under. separate permit unit 0Plumbing$2,500,000—Finaled Sep 25, 2019201711214532
Dec 6, 2017otc alterations permit: construction of non structural partitions, doors/frames/hardware, millwork, drywall, acoustic ceiling/ grid finishes, horizontal exit,mech, elec, plumbing structural platforms fire sprinkler and life safety under deferred submittal. n/a for maher unit 0Plumbing$3,772,797—Finaled Jul 12, 2018201711143931
Nov 13, 2017otc alterations permit: 2nd fl: construction of non-structural partitions, door/frames/hardware, millwork, drywall and acoustic ceiling grid/tile, finishes, mechanical, electrical and plumbing. structural platforms. fire sprinkler & life safety under deferred submittal. maher n/a unit 0Plumbing$3,225,407—Finaled Jul 11, 2018201710312742
Nov 13, 2017otc alterations permit: construction of non-structural partitions, door/frames/hardware, millwork, drywall and acoustic ceiling grid/tile, finishes, mechanical, electrical and plumbing. structural platforms. fire sprinkler & life safety under deferred submittal. maher n/a unit 0Plumbing$3,704,357—Finaled Jul 24, 2018201710252250
Nov 13, 2017otc alterations permit: construction of non-structural partitions, door/frames/hardware, millwork, drywall and acoustic ceiling grid/tile, finishes, mechanical, electrical and plumbing. structural platforms. fire sprinkler & life safety under deferred submittal. maher n/a unit 0Plumbing$3,797,131—Finaled Jul 12, 2018201710252245
Jul 7, 2017otc alterations permit: floors -basement, 1, 2, 5, 6,7,10 : demo of non-structural partitoins, doors/frames, hardware, millwork, ceilings, finishes, mechanical, electrical & plumbing. ti under separate permits. all proposed work areas are under 1 tenant. n/a maher ordinance unit 0Plumbing$200,000—Finaled Nov 6, 2017201706270448
Sep 1, 2015otc alterations permit: 3rd floor: t.i. includes demo of non-structural partitions. all new or revised hvac, electrical, plmbg, life safety and sprinklers work will be design build and submitted for permit separately. bldg fully sprinkler. n/a for maher unit 0Heating and cooling$86,000—cancelled201508285499

On Howard St

405 permits on record on Howard St.

TradePermitsSince Oct 3, 2024Median declaredRangeLast
Roofing638$57,750$1–$238,500Oct 1, 2026
Electrical14325$65,000$2,007–$412,000Aug 4, 2026
Heating and cooling13320$75,000$9,300–$250,177Sep 21, 2026
Plumbing5619$138,590$16,000–$2,232,339Sep 10, 2026
Solar63—under 5Sep 1, 2026
Water heater43—under 5Jul 2, 2026

Roof replacement cost in San Francisco

Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.