Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
May 4, 2026otc alterations permit: modification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness roomRoofing$57,914—Finaled Jul 14, 2026202604159532
Apr 26, 2022otc alterations permit: 3rd fl: electrical work for t.i. to consist of new power & signal throughout the space. new 22019 title 24 compliant lighting & controls. ref pa# 202111102158Electrical$15,000—Finaled Feb 9, 2023202204262971
Nov 19, 2021otc alterations permit: 3rd/f t.i. interior demo of structural elements including but not limited to inrerior partitions, doors, finishes, lighting, mech, and electrical outlets and switches. upgrade men & women's restroom to fully comply w/ accissibilityElectrical$165,000—Finaled Feb 9, 2023202111102158
Sep 13, 2021otc alterations permit: # 450: mechanical and electrical work for t.i. on the 4th floor. ref#202106162573Electrical$20,000—Finaled Apr 11, 2022202108186651
Jul 15, 2021otc alterations permit: #410: interior demo of non-structural elements including but not necessary limited to int. partitions, doors, finishes, ceiling grid and tile, lighting, mechanical and electrical outlets & switches. mechanical and electrical will be submitted as seperate permitsElectrical$75,000—Finaled Apr 11, 2022202106162576
Jul 7, 2021otc alterations permit: #450: interior demo of non-structural elements including but not necessary limited to int. partitions, doors, finishes, ceiling grid and tile, lighting, mechanical and electrical outlets & switches. mechanical and electrical will be submitted as seperate permitsElectrical$300,000—Finaled Apr 11, 2022202106162573
Aug 14, 2019otc alterations permit: increasing level of safety of roof deck by adding new path to new second exit, upgrading emergency lighting/strobes. new panic bars will be added to egress path out of building. any modification to electrical or fire life safety under separate permitRoofing$30,000—Finaled Sep 4, 2019201812208867
Jan 31, 2019otc alterations permit: ref pa# 201809119708 & 201901140236; fire alarm t.i. install ceiling mount speaker-strobes, instll duct detectors with sampling tubes, insatll central relays, install (20 booster panel power supplyHeating and cooling$21,000—Finaled Feb 11, 2019201901311692
Jan 30, 2019otc alterations permit: ref pa# 201809119708; mechanical & electrical. 7th and 9th floor, provide 6 vav boxes, with reheat coils. new fan coils @ 7th and 9th floor. new air cooled unit on roofRoofing$753,806—Finaled May 8, 2019201901140236
Aug 24, 2018otc alterations permit: suite 600 - mechanical - demo existing and install new duct; electrial - power/signal & lighting. ref pa 2018-0522-9855Heating and cooling$100,000—Finaled Nov 6, 2018201808157363
Jul 20, 2018otc alterations permit: fire alarm tenant improvement 1 duct detector with sampling tube, 1 control relay moduleHeating and cooling$1,161—Finaled Nov 30, 2018201807205054
Jul 2, 2018otc alterations permit: 5th flr -minor partition demo, new suite exit door, new finishes throughout, no plumbing, ele or lighting workPlumbing$90,000—Finaled Nov 20, 2018201806252766
Feb 5, 2018otc alterations permit: electrical only - no arch reference permitElectrical$25,000—issued201802050337
Aug 23, 2017otc alterations permit: suite 650: mechanical- 10 new vav boxes and duct for spec layout and 1 new exhaust fan. electrical, lighting, power-signal, wiring, lighting and control. ref app#201705106171Heating and cooling$160,000—Finaled Dec 15, 2017201708185213
Sep 7, 2016otc alterations permit: rebalance vav terminal units to serve & zones. re-use existing vav boxes. provides & install supply grills. install return air grills. relocate t-stats, duct insulation, air balance. ref. t.i. appl # 2016-0803-4085Heating and cooling$20,000—Finaled Feb 15, 2017201608195517
Aug 19, 2016otc alterations permit: suite 304 - project consists of demo & providing new partitions, doors, glazing, millwork, power & tele/data receptacles, finishes throughout along with ceiling grid & tile, light fixture, mechanical, electrical, life safety & sprinklers system modification unde sep permitElectrical$250,000—Finaled Feb 15, 2017201608034085
Jul 18, 2016otc alterations permit: 10/f- hvac title 24 to relocate registers and install 1 new heat pump, and new power lighting. t.i. pa#201605056626Heating and cooling$175,000—Finaled Sep 22, 2016201606281114
Aug 28, 2015otc alterations permit: suite #500- t.i. non rated wall way reconfiguration with partitions. minimal electrical & mechanicalElectrical$8,500—Finaled Oct 21, 2015201508255177

On Kearny St

241 permits on record on Kearny St.

TradePermitsSince Oct 4, 2024Median declaredRangeLast
Roofing395$79,900$24,678–$25,960,000Jun 23, 2026
Heating and cooling747$40,000$2,882–$179,120Apr 24, 2026
Electrical7213$24,000$480–$540,118Aug 4, 2026
Plumbing5311$59,000$1–$83,771Jul 31, 2026
Water heater31—under 5Nov 17, 2025

Roof replacement cost in San Francisco

Across 5,889 one- and two-family reroof permits since October 4, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,760. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 4, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 4, 2026. Owner names are not shown on any page.