Permits Index
5
Permits, 24 months
24 on record
17
Roofing permits
Jul 24, 2026
Last permit issued
23
Addresses with a page

Roofing: 17 permits

From Feb 10, 2016 to Nov 10, 2025. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 3 listed below. Earlier permits, 14, are on their house pages: 2024: 2 · 2023: 3 · 2022: 2 · 2021: 3 · 2020: 1 · 2018: 1 · 2017: 1 · 2016: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Nov 10, 2025ReRoof: re-roofing: remove and replace roofing material / existing roofing material2 family dwelling$11,700—202511109322
Aug 6, 2025ReRoof: reroofing. no hot works1 family dwelling$9,900—202508062434
Jun 23, 2025ReRoof: re-roofing no hot works2 family dwelling$11,500—202506209150

Plumbing: 3 permits

From Jul 27, 2018 to Jul 24, 2026. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 2 listed below. Earlier permits, 1, are on their house pages: 2018: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 24, 2026otc alterations permit: construction of a new floor subdrainage system and sump pump. the work is limited to the rear of the building. excavation of 12" wide french drain trenches and placing drain pipes. the drains will lead to a larger sump basin w/ a sump pump,which will connect to the house sewer lateral2 family dwelling$20,000—202607245545
Apr 17, 2026otc alterations permit: non-structural renovation of kitchen. plumbing and electrical work to be performed. moving one window on rear of building and add siding to match1 family dwelling$50,000—202512161881

Heating and cooling: 2 permits

From Jun 20, 2016 to Jun 9, 2017. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2017: 1 · 2016: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Electrical: 1 permit

From Sep 28, 2021 to Sep 28, 2021. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Water heater: 1 permit

From Dec 7, 2018 to Dec 7, 2018. Fewer than 5 water heater permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2018: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.