1 Market St, San Francisco
182 home-service permits on record at 1 Market St, San Francisco; the roof was last permitted on Jan 27, 2026 at a declared value of $4,347.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Aug 21, 2026 | otc alterations permit: 28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at opening in an existing unoccupied space. no hvac or electrical modifications | Heating and cooling | $150,000 | — | issued | 202606032421 |
| Jul 8, 2026 | otc alterations permit: 25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panel | Electrical | $150,000 | — | issued | 202606243817 |
| Apr 28, 2026 | otc alterations permit: 28th fl - demo of non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be apped @ source. construction of non-structural partitions finishes, ceiling, lighting and plumbing | Heating and cooling | $1,400,000 | — | issued | 202604149423 |
| Apr 3, 2026 | otc alterations permit: level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331) | Electrical | $10,000 | — | issued | 202604018681 |
| Mar 24, 2026 | otc alterations permit: 15th floor: mech - demo mech systems, removal perimeter induction units vav boxes. relocate vav boxes new fire smoke damper. electrical - fire smoke damage electrical | Electrical | $20,000 | — | Finaled May 7, 2026 | 202603177697 |
| Feb 4, 2026 | otc alterations permit: 37th/f spec suite- electrical new power & signal. new 2022 title 24 lighting & controls.ref 2025 0618 8952 | Electrical | $15,000 | — | Finaled Jun 22, 2026 | 202601284724 |
| Jan 27, 2026 | otc alterations permit: 7th fl - add 7 pendent sprinklers on the roof deck ref pa 202501148331 | Roofing | $4,347 | — | issued | 202601234403 |
| Jan 20, 2026 | otc alterations permit: 15th floor. demolition of non-structural partitions, doors, frame, finishes. mep deferred for ceiling, light and plumbing fixtures in as existing unoccupied space. ab-017 applies | Plumbing | $150,000 | — | Finaled May 7, 2026 | 202512151821 |
| Jan 7, 2026 | otc alterations permit: 13th fl - hvac ti project unit the base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539 | Heating and cooling | $300,000 | — | issued | 202512182196 |
| Nov 13, 2025 | otc alterations permit: 13/fl- demo of non structural partitions, doors, and frames, finishes ceilings, lighting and plumbing fixtures. ductwork, hvac, and electrical to be pulled back to source and plumbing to be capped at source. construction of non structural partitions, finishes, ceiling, lighting and plumbing | Heating and cooling | $750,000 | — | Finaled Aug 17, 2026 | 202510238018 |
| Nov 3, 2025 | otc alterations permit: 4/fl- ti demo and install partitions, millwork, finishes, mech, electrical . no structrual or exterior work . no addition of plumbing fixtures | Plumbing | $387,128 | — | issued | 202509266259 |
| Oct 24, 2025 | otc alterations permit: installation of new strobes and speaker/storbe per code. new fire alarm notification appliances to be connected to the existing remple power supplies and existing speaker circuits. instalaation of 2 contril relays for music shut down. installation of duct detector & control relay 2 new heat pumps | Heating and cooling | $4,188 | — | issued | 202510107159 |
| Oct 15, 2025 | otc alterations permit: level 2: revision to pa #202506189024. revised bathroom layout. no plumbing fixtures added or deleted | Plumbing | $1 | — | Finaled Jan 22, 2026 | 202510107236 |
| Jul 22, 2025 | otc alterations permit: construction of new non structural partitions, doors and glazing, ceiling, lighting, millwork, plumbing fixtures, equip and finishes. scope includes reception, break area, meeting roos, offices and open office area. no exterior work in the scope. all work to be on 37th fl. mep deferred | Plumbing | $1,800,000 | — | Finaled Jun 22, 2026 | 202506188952 |
| Jul 22, 2025 | otc alterations permit: 17/f of spear tower. demol of existing non structural partitions, door, finishes, ceilings lighting and plumbing fixtures. construction of new non structural partitons, doors, finishes, ceiling, lighting, millwork and plumbing fixturs. corridor upgrades, elevator lobby. mep deferred | Plumbing | $850,000 | — | issued | 202505227055 |
| Jul 17, 2025 | otc alterations permit: 37th fl: demo of non strucutral partitions, doors & frames, finishes, ceiling, lighting & plumbing fixtures. construction of new non structural partitions, finishes, ceiling, lighting, millwork & plumbing fixtures. scope includes new rated corridor, elevator lobby and restroom upgrades | Plumbing | $1,028,899 | — | Finaled Jun 22, 2026 | 202505146425 |
| Jul 8, 2025 | otc alterations permit: 7/f -demolition of non structural partitions,ceiling, lighting, finishes, and any associated mechanical, plumbing, and electrical. per ab-17, space will rema8in unoccupied. permit for construction and related acessible features will be required prior to reoccupancy. ab-017 applies | Plumbing | $9,000 | — | Finaled Jul 16, 2025 | 202506249311 |
| Jun 24, 2025 | otc alterations permit: 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work | Heating and cooling | $428,736 | — | Finaled Dec 3, 2025 | 202506037804 |
| May 14, 2025 | otc alterations permit: 12th deferred mechanical and electrical work tenant improvement project under architectural building pa 202412237318. no exterior work | Electrical | $400,000 | — | Finaled Oct 14, 2025 | 202505075977 |
| May 2, 2025 | otc alterations permit: 7/fl- ref 202412025921- to support approved arch permit to include heat pump, lighting, plumbing for employee cafe | Heating and cooling | $250,000 | — | Finaled Jun 13, 2025 | 202501077863 |
| Apr 23, 2025 | otc alterations permit: 26th floor. new light fixtures at 26th floor space. interior work only. deferred electrical permit under main architectural bldg pa#: 202411215523 and 202503132220 | Electrical | $23,950 | — | Finaled Aug 20, 2025 | 202504164556 |
| Apr 3, 2025 | otc alterations permit: fl/35a: fire alarm for the "wsgr" remodel on floor 35a done under pa#2024-1010-2710 and pa#2024-1216-6922, additions abe 8 smoke detectors, 1 module, 35 speakers/strobes, 8 strobes, and a strobe power supply,3 smoke detectors and duct detectors are also relocated | Heating and cooling | $57,000 | — | issued | 202504033609 |
| Feb 5, 2025 | otc alterations permit: 12 floor; demolition of existing non-structural partitions, doors and frames, finishes, ceilings, lighting and millwork. ductwork, hvac and electrical to be pulled back to source. scope includes t.i. suite 1200. construction of new non-structural partitions, finishes, ceiling, plumbing fixtures | Heating and cooling | $1,164,338 | — | Finaled Oct 6, 2025 | 202412237318 |
| Dec 19, 2024 | otc alterations permit: 26th flr.demo of e non structural partitions, doors, frames, finishes, ceilings,lighting plumbijng fixtures.ductwork,hvac & elec to be pulled back to source and plumbing to be capped at source. construction of new non structural partions, finishes, ceiling, lighting, plumbing fixtures.scope incld | Heating and cooling | $460,327 | — | Finaled Aug 20, 2025 | 202411215523 |
| Nov 18, 2024 | otc alterations permit: 35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational | Plumbing | $3,760,780 | — | Finaled May 27, 2025 | 202410102710 |
| Oct 30, 2024 | otc alterations permit: b2/fl-ref 202405232787-deferred submision for ti electrical permit | Electrical | $2,300 | — | Finaled Dec 24, 2024 | 202410304065 |
| Oct 30, 2024 | otc alterations permit: deferred electrical permit for interior improvement project under pa # 202405222665/202409120646 b1 level | Electrical | $255,000 | — | Finaled Dec 24, 2024 | 202410112830 |
| Oct 23, 2024 | otc alterations permit: basement lvl ref pa # 2024-0820-9023 mechanical demo of existing duct & install new fsd | Heating and cooling | $25,000 | — | Finaled Jan 8, 2025 | 202410163075 |
| Aug 28, 2024 | otc alterations permit: revision to pa # 2024-0606-3882 basement level to incorporate powered mobility devices & required updates to meet fire code section 325. no plumbing or mechanical in scope. fire sprinkler, life safety & electrical under separate permit | Plumbing | $55,000 | — | Finaled Jan 8, 2025 | 202408209023 |
| May 24, 2024 | otc alterations permit: 5th fl. installation of new duct detector for heat pump and new high power control relaly for shutdown | Heating and cooling | $8,400 | — | Finaled Jun 11, 2024 | 202403298912 |
| May 10, 2024 | otc alterations permit: tenant improvement. include installing a new heat pump ref pa 202311160890 | Heating and cooling | $1 | — | Finaled Jun 18, 2024 | 202404290933 |
| Apr 18, 2024 | otc alterations permit: 12th fl, steuart tower - demo of non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting; scope includes corridor and elevator lobby upgrades. no exterior work to occur | Plumbing | $225,000 | — | Finaled Apr 21, 2025 | 202310279621 |
| Apr 18, 2024 | otc alterations permit: 15th fl, steuart tower - demo of non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting and plumbing fixtures; scope includes restroom accessibility upgrades, corridor and elevator | Plumbing | $225,000 | — | Finaled Apr 21, 2025 | 202310279620 |
| Mar 22, 2024 | otc alterations permit: 35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre to | Plumbing | $175,000 | — | Finaled May 1, 2024 | 202402296787 |
| Dec 12, 2023 | otc alterations permit: electrical power & lighting ref to 202310068155 | Electrical | $75,000 | — | issued | 202312062018 |
| Nov 16, 2023 | otc alterations permit: landmark bldg: new mechanical water source packaged heat pump, piping, duct and diffusers | Heating and cooling | $20,000 | — | issued | 202311160890 |
| Nov 15, 2023 | otc alterations permit: 3rd/f: remove an water sourced heat pump replace w/ 1 water sourced heat pump | Heating and cooling | $74,000 | — | issued | 202311150861 |
| Oct 12, 2023 | otc alterations permit: demolition of non-structural restroom partitions, doors & frames, finishes, ceiling, lighting and plumbing fixtures. construction of new resroom non-structural partions, finishes, ceiling, lighting and plumbing fixtures. scope includes restroom, drinking fountain accessibility upgrades. no | Plumbing | $163,000 | — | Finaled Mar 8, 2024 | 202310068155 |
| Aug 18, 2023 | otc alterations permit: 16/f: mechanical-ductwork,new vav boxes, supplemental heat pump ddc controls upgrade, air balance, replace induction units; electrical- new lighting & branch circuiting to existing panel, new power and signal, title 24, ref pa# 202305016775 | Heating and cooling | $1,200,000 | — | Finaled Mar 28, 2024 | 202307132065 |
| Aug 14, 2023 | otc alterations permit: 42/f: mechanical-revision to add new water source heat pump & associated ductwork, new vav boxes, controls for new hvac, ref pa# 202201276745 | Heating and cooling | $180,000 | — | Finaled Jan 5, 2024 | 202308104117 |
| Jul 6, 2023 | otc alterations permit: fire only work for the fintness center on fl. 1 additons and 1 duct detector 1 module, 5 speaker/strobes, and 11 strobes, ref pa# 2023-0120-0509 | Heating and cooling | $14,915 | — | issued | 202307061519 |
| May 25, 2023 | otc alterations permit: suite 1225: mech - demo duct, instll new vav/duct; install new ddc controls, air balance. electrical - lighting, ckt / controls, power & signal devices & wriing. ref t.i. pa 202304175806 | Heating and cooling | $125,000 | — | Finaled Apr 2, 2024 | 202305188103 |
| May 1, 2023 | otc alterations permit: 17b/f: addition of 7-smoke detectors, 2-modules, 1-strobe power supply, 34-speaker/strobes, 12-strobes, as well as the relocation of 6-smoke detectors and 1-duct detector, ref pa# 202211075982 | Heating and cooling | $52,584 | — | Finaled May 12, 2023 | 202305016760 |
| Feb 1, 2023 | otc alterations permit: 17th/f: mech & electrical & plumbing for t.i. 202211075982 | Plumbing | $750,000 | — | Finaled Jun 26, 2024 | 202212218864 |
| Nov 14, 2022 | otc alterations permit: mechanica install 2 water source heat pump, install 1 circulation pump, modify ductwork for e vavss. elec, power, lighting | Heating and cooling | $150,000 | — | Finaled Dec 9, 2022 | 202211086060 |
| Oct 26, 2022 | otc alterations permit: 12th floor: mechanical 6 vav boxes, 1 exhaust fan, install duct work, insulationa, ddc controls, electrical power , lighting, signal ref#202209082046 | Heating and cooling | $150,000 | — | Finaled Apr 28, 2023 | 202210184564 |
| Oct 6, 2022 | otc alterations permit: floor 36a: fire only for the "citigroup" remodel; addition are 3 smoke detectors, 1 module, 2 duct detectors, 1 strobe power supply, 1 speaker, 36 speaker/strobes, 24 strobes, as well as the relocation of 6 smoke detectors. ref pa#202201316997 | Heating and cooling | $43,200 | — | Finaled Oct 19, 2022 | 202210053770 |
| Sep 8, 2022 | otc alterations permit: 10th fl: hvac modification and interior tenant mino lighting updates. t.i. arch work under separate permit. ref pa# 202208110346 | Heating and cooling | $199,000 | — | Finaled Jun 27, 2023 | 202209082104 |
| Jul 27, 2022 | otc alterations permit: 40th fl - interior ti, demo non-structural partition & lighting. new non-structural load bearing partitions, suspended ceilings & lighting, new mech throughout, new plumbing & break rooms; mother's room, new data cabling and av | Plumbing | $2,615,022 | — | Finaled Jan 5, 2024 | 202201266664 |
| Jul 26, 2022 | otc alterations permit: 23/f-24/f: demo of interior non-bearing wall partitions, doors, light fixtures, flor finishes and plumbing fixtures. no change in use or exterior scope, the area remains business. maher n/a. ab-017 applies | Plumbing | $128,000 | — | Finaled Jun 22, 2023 | 202205103924 |
| May 18, 2022 | otc alterations permit: g/f: interior t.i. for new restaurant and shell building. new fixtures, finishes, new partitions, restrooom fixtures to remain, new finishes only. kitchen will be modified inclkuding electrical/plumbing elements based on the updated kitchen design. new lighting, hvac | Heating and cooling | $500,000 | — | Finaled Oct 28, 2022 | 202201135898 |
| May 5, 2022 | otc alterations permit: floor 2a: fire only work for the autodesk qa lab. additions are 1 smoke detector, 1 duct detector, and 1 relay module. ref pa# 202111041852 | Heating and cooling | $2,720 | — | Finaled Jun 9, 2022 | 202205053577 |
| Apr 7, 2022 | otc alterations permit: 2nd fl, room 12004: installation of new duct detector for fan coil units, heat pump & fire smoke clamper in lab room 12004. 12 relays for control power shutdown | Heating and cooling | $16,675 | — | Finaled Jun 9, 2022 | 202204071801 |
| Feb 2, 2022 | otc alterations permit: revise approved permit 2021-0712-4191 with limited scope only to increase occupancy count;related accessibility, egress and lighting upgrades to the 2 roof decks at the 11th fl; this project includes a change of use from b-office/a-2 dining accessory to office | Roofing | $50,000 | — | Finaled Oct 4, 2022 | 202111233005 |
| Jan 20, 2022 | otc alterations permit: 41/f: demo of non-strutcural partition & lighting, power & data. new non-structural partitions, new suspended ceiling,new mechanical, new plumbing at breakroom, mothers room, new dta cabling & a/v system. maher n/a | Plumbing | $1,055,989 | — | Finaled Sep 7, 2023 | 202111232986 |
| Dec 6, 2021 | otc alterations permit: 5th floor:demo of non-structural partitions,ceiling,lighting,finishes & associated mechanical,plumbing & electrical per ab-017 space will remain unoccupied.sprinkler demo permit under #2021/1122/2851 | Plumbing | $280,000 | — | Finaled Mar 14, 2022 | 202111303290 |
| Nov 30, 2021 | otc alterations permit: on 2nd fl to provide rated server room & ti on 7th fl roof mech equipment w/screen wall enclosure | Roofing | $120,000 | — | Finaled Aug 16, 2022 | 202111041847 |
| Nov 29, 2021 | otc alterations permit: 19th, 21st, 22nd floor - mechanical and electrical revision to previously approved permits ref. 2019-1219-0040, 202008071326, 201909242582, 201911127036, 2019-0924-2584 and 2019-1112-7044 | Electrical | $1 | — | issued | 202111293227 |
| Oct 28, 2021 | otc alterations permit: demolition of doors & frames, finishes, ceilings,lighting & plumbing fixtures. construction of finishes, ceiling,lighting & plumbing fixtures. no structural work, no exterior work. separate ti permits for vacant floor | Plumbing | $215,000 | — | Finaled May 6, 2022 | 202110190764 |
| Sep 15, 2021 | otc alterations permit: t.i. on 2nd floor of spear-steuart tower to include demo of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and under a separate permit. fully sprinklered | Heating and cooling | $599,100 | — | Finaled Feb 2, 2022 | 202108045809 |
| Sep 1, 2021 | otc alterations permit: deferred mep to approved & rev to pa# 2021-0226-5469 & 2021-0226-5479 l34- new duct, uvav equipment & ligting l33-new lighting | Heating and cooling | $390,000 | — | Finaled Dec 2, 2021 | 202107275218 |
| Aug 19, 2021 | otc alterations permit: 11/f: revision to pa 201909262834. amendment to occupancy load of exterior roof decks to 49 occupancy each. clarifying hardware on doors es101 and es1103 as existing. identifying an existing curb in path of egress as "existing/non-compliant" field condition | Roofing | $1 | — | Finaled Sep 16, 2021 | 202108166475 |
| Jul 29, 2021 | otc alterations permit: 41st floor: relocate and changeout sprinklers per t.i. job # 21-628, ref # 2021-0226-5505 | Heating and cooling | $900 | — | Finaled Sep 29, 2021 | 202106041726 |
| Jul 29, 2021 | otc alterations permit: 15th floor: add , relocate and changeout per t.i. job # 21-628, ref # 2021-0301-5549 | Heating and cooling | $2,550 | — | Finaled Sep 29, 2021 | 202106041724 |
| Jul 14, 2021 | otc alterations permit: 16th flr. mechanical and electrical for tenant improvement. ref arch 202009234805 | Electrical | $250,000 | — | Finaled Aug 26, 2021 | 202012090616 |
| Jul 7, 2021 | otc alterations permit: ref pa #202102205507 & 202103015598 . electrical power, lighting a signal. maher n/a | Electrical | $180,000 | — | Finaled Apr 14, 2022 | 202106102115 |
| Jul 2, 2021 | otc alterations permit: existing fire sprinkler system - tenant improvements 7th - 2 sprinklers 8th - 2 sprinklers 9th - 2 sprinklers 10th - 2 sprinklers 11th - 2 sprinklers (relocate & change out sprinklers) | Heating and cooling | $5,000 | — | Finaled Jul 20, 2021 | 202105251041 |
| Jul 2, 2021 | otc alterations permit: partial 6th floor fire t.i. 17 speaker strobes, 1 power supply, 3 duct detectors, 1 smoke detector, 5 relays and 1 synchronization module | Heating and cooling | $3,200 | — | Finaled Oct 20, 2021 | 202105250990 |
| Jun 21, 2021 | otc alterations permit: 15th fl & 41st fl: mechanical modificaiton to support interior ti elevator lobbies. electrical - power, lighting & signal. reference 202103015549 , 202102265505 | Electrical | $50,000 | — | Finaled Jun 2, 2022 | 202106081907 |
| May 27, 2021 | otc alterations permit: demolition of existing non-structural partitions, doors, frames, finishes ceilings, lightings, plumbing fixtures. construction of new non-structural partitions, finishes ceilings, lighting, plumbing fixtures. restroom accessibility upgrage | Plumbing | $464,000 | — | Finaled Jun 2, 2022 | 202102265505 |
| May 19, 2021 | otc alterations permit: ref pa# 201906113076; tenant remodel to add sandwich cafe to office building new hvac, exhaust, lighting, controls and power outlets, this is the deferred submittal for mep | Heating and cooling | $1 | — | Finaled Sep 2, 2021 | 202002204896 |
| May 18, 2021 | otc alterations permit: 6th floor: add , relocate and change out sprinklers per t.i.; ref #: 2020-1201-9912 | Heating and cooling | $13,125 | — | Finaled Aug 9, 2021 | 202104158707 |
| May 14, 2021 | otc alterations permit: the additiona of 45 a/v, 13 duct delay, 1 smoke detector and 1 power supply | Heating and cooling | $67,200 | — | Finaled Aug 23, 2021 | 202102255416 |
| May 5, 2021 | otc alterations permit: 15/f: demo of doors and frames, finishes, ceilings, lighting and plumbing. construction of new finishes, ceiling, lighting and plumbing. restroom accessibility upgrades | Plumbing | $464,000 | — | Finaled Jun 2, 2022 | 202103015549 |
| May 5, 2021 | otc alterations permit: 12th fl: restroom remodel. demo of non-structural partitions,plumbing fixtures, finishes, ceilings and lighting, construction of new non-structural partitions, plumbing fixtures, finishes, ceilings and ligthing n/a maher | Plumbing | $90,000 | — | Finaled Oct 19, 2022 | 202102265507 |
| Apr 28, 2021 | otc alterations permit: 14th fl: demo of existing non-structural partitions, plumbing fixtures, finishes, ceilings & lighting. construction of new non-structural partitions, plumbing fixtures, finishes, ceilings & lightings | Plumbing | $90,000 | — | Finaled Oct 19, 2022 | 202103015598 |
| Apr 7, 2021 | otc alterations permit: 2,4,5th floors: interior t.i. of multi-user restrooms. work includes replacement of plumbing and lighting fixtures, new floor and wall finishes | Plumbing | $200,000 | — | issued | 202101213064 |
| Mar 23, 2021 | otc alterations permit: the addition of 8 nac, 3 smoke, 2 duct detectors and 1 power supply for the 11th floor. arch permit# 2019-0926-2834 | Heating and cooling | $3,500 | — | Finaled Aug 4, 2021 | 202102255393 |
| Mar 17, 2021 | otc alterations permit: 2/f - fire alarm system ti. addition of smoke detectors, duct detectors, speaker-strobe, strobes. ref ti 2020-0926-5068 | Heating and cooling | $25,000 | — | Finaled May 11, 2021 | 202103025674 |
| Feb 22, 2021 | otc alterations permit: apn; tenant improvements - existing fire sprinkler syst. 14 change out uprights; 30 relocated pendents; 2 relocated uprights; 1 changed out pendent; 5 added uprights; 4 added pendents; 14 deleted spkrs | Heating and cooling | $15,000 | — | Finaled May 5, 2021 | 202101213092 |
| Feb 18, 2021 | otc alterations permit: fire alarm work for the "morgan lewis" east area remodel on floor 31a; additions are 1 duct detector, 1 speaker/strobe. 1 strobe, and the relocation of 2 detectors, and 1 strobe. ref. permit app # 2020-1022-7185 | Heating and cooling | $2,770 | — | Finaled May 7, 2021 | 202101152787 |
| Feb 17, 2021 | otc alterations permit: level 6: rev to pa201910033474: change relate to restroom revisions. a single gender neutral restroom has been added; a raised floor is added to manage restroom plumbing connections; misc plumbing rev due to infield routing contraints. included are arch/struct/mech/elec/plumbing. maher n/a | Plumbing | $100,000 | — | Finaled Apr 1, 2022 | 202012019912 |
| Dec 18, 2020 | additions alterations or repairs: add coding tower and centrifugal seperator to existing condenser water system work on steuart tower roof | Heating and cooling | $500,000 | — | issued | 202007160356 |
| Oct 28, 2020 | otc alterations permit: #200: interior non-structural demo. work includes non-structural partitions, finishes, electrical, plumbing, & mechanical equipment | Plumbing | $100,000 | — | Finaled Sep 24, 2021 | 202009265092 |
| Oct 23, 2020 | otc alterations permit: plaza level: demolition of existing plumbing fixtures, finishes, lighting. construction of new non-structural partitions, plumbing fixtures, lighting and finishes. full accessibility upgrades under this scope of work | Plumbing | $97,000 | — | Finaled Mar 14, 2022 | 202009244942 |
| Sep 28, 2020 | otc alterations permit: improvements existing fire sprinkler system 2 change out uprights, 2 change out pendents, 30 added pendents and 11 deleted sprinklers | Heating and cooling | $6,800 | — | Finaled Apr 27, 2021 | 202009103896 |
| Mar 12, 2020 | otc alterations permit: ref# 2020-0124-2724: deferred electrical only. minor lighting and power upgrades, no hvac or plumbing | Heating and cooling | $35,000 | — | Finaled Feb 25, 2021 | 202002215035 |
| Mar 4, 2020 | otc alterations permit: project scope includes installation of mechanical cooling tower at the 28th level roof at 1 market plaza, steuart tower | Roofing | $25,000 | — | Finaled Sep 3, 2021 | 202002255364 |
| Feb 28, 2020 | additions alterations or repairs: t.i. of floor 11 small employee coffee station and a residential teaching kitchen, related mirco kitchen. 2 roof decks, lighting associate mep.**maher n/a** | Roofing | $2,500,000 | — | Finaled Sep 16, 2021 | 201909262834 |
| Feb 20, 2020 | otc alterations permit: 10th fl - existing fire sprinkler system ti 10 added, 33 relocated, 1 changeout, upright sprinklers, 5 added, 113 relocated, pendent sprinklers, 135 plugged outlets | Heating and cooling | $82,500 | — | Finaled Jan 14, 2021 | 202002204902 |
| Feb 4, 2020 | otc alterations permit: demo of ceiling grid, lights, finishes, and plubning fixtures, construction includes ceiling grid lights, finishes, plumbing fuxtres, scope of work includes restroom accessibility upgrades n/a maher | Plumbing | $243,896 | — | Finaled Feb 23, 2022 | 202001172145 |
| Jan 29, 2020 | otc alterations permit: 27th - revision to pa #201910316040. tenant alterations, non-structural addition of new office, revision to egress route door hardware. mechanical, electrical, plumbing, fire & life safety under separate permit. maher na | Plumbing | $20,000 | — | Finaled Sep 8, 2020 | 201912270796 |
| Jan 22, 2020 | otc alterations permit: fire sprinklers for 3rd fl: relocate 21, change out 54 uprights, relocated 169 uprights, relocated 62 pendents, changed out 10 pendents , added 4 pendents, deleted 16 sprinklers. ref pa #201907035075 | Heating and cooling | $174,000 | — | issued | 202001222445 |
| Dec 23, 2019 | otc alterations permit: 6th floor: fire alarm system modification 6th floor ti. full audio/visual notification for new floor layout. replace existing booster power supply. new duct detectors for fan coil units and fsd | Heating and cooling | $63,933 | — | Finaled Apr 28, 2020 | 201912230257 |
| Dec 10, 2019 | otc alterations permit: 41st fl - provide and install new vav, duct and grilles per plans. before as needed. ref pa 2019-1114-7262 | Heating and cooling | $72,000 | — | issued | 201912109102 |
| Dec 4, 2019 | otc alterations permit: fire sprinkler ti on 41st fl - add 2 sprinklers, relocate 2 pendents, change out 2 pendents. total 6. ref pa #201911147262 | Heating and cooling | $3,084 | — | Finaled Feb 1, 2020 | 201911268184 |
| Nov 26, 2019 | otc alterations permit: remodel of existing office space on 41st floor, breakroom addition. new carpet, paint, partitions, lighting, electrical and casework/solid suface, and drinking fountain. mep deferred | Electrical | $123,825 | — | issued | 201911147262 |
| Nov 12, 2019 | otc alterations permit: provide hvac power and lighting for tenant improvement ref 201908027701 maher not req | Heating and cooling | $500,000 | — | Finaled May 21, 2020 | 201910255593 |
| Oct 22, 2019 | otc alterations permit: 5th floor: mep deferred drawings to support arch. set. demo extg duct and hvac systems. install vav's, ductwork, and piping. ref app#201909101107. n/a for maher | Heating and cooling | $200,000 | — | Finaled Nov 9, 2021 | 201910225182 |
| Sep 25, 2019 | otc alterations permit: flr 24 b. fire alarm work for the :cai: remodel on floor 24b, add 3 smk det, 5 duct det and 1 strobe. ref 201907014750 | Heating and cooling | $9,800 | — | Finaled Oct 18, 2019 | 201909252607 |
| Sep 5, 2019 | otc alterations permit: revision to app#201903195680 to revise equipment in prep area, keep extg lighting, revise plumbg and electrical. n/a for maher | Plumbing | $1,500 | — | Finaled Sep 17, 2019 | 201908088331 |
| Aug 15, 2019 | otc alterations permit: 4th floor: 1 new booster power supply, 1 sync. mod, 41 ceiling spkr/strobes, 2 ceiling shtrobes, 9 wall spkr/strobes, 12 ceiling spkr/strobes, 2 duct det., 2 relays. n/a for maher ref app# 201906103013 | Heating and cooling | $15,500 | — | Finaled Nov 2, 2021 | 201908158895 |
| Aug 13, 2019 | ReRoof: reroofing - spear street tower | Roofing | $580,000 | — | Finaled Jun 11, 2020 | 201908138636 |
| Aug 13, 2019 | ReRoof: reroofing - steuart street tower | Roofing | $119,000 | — | Finaled Jun 11, 2020 | 201908138633 |
| Aug 1, 2019 | otc alterations permit: 18st fl - mechanical and electrical work done for new trader desk. provide power to new trader desk | Electrical | $40,000 | — | Finaled Dec 16, 2019 | 201908017554 |
| Jul 31, 2019 | otc alterations permit: 4th floor: add,relocate, change out, and remove fire sprinklers 138 add, 142 relocate, 25 change out, and plug 27. n/a for maher | Heating and cooling | $110,700 | — | Finaled Feb 6, 2020 | 201907267142 |
| Jul 15, 2019 | otc alterations permit: 24th fl, steuart tower - non structural demo non-structural partitions glazing, ceiling, lights, electrical, millwork finishes. no change in occupancy, use or area. life safety & sprinkler under separate permit | Electrical | $1,665,865 | — | Finaled Dec 19, 2019 | 201907014750 |
| Jun 25, 2019 | otc alterations permit: 4th fl - mep permit to support arch set demo duct and equipment. install new vav's, heat pumps, exhaust fan, ductowrk and piping. ref pa 2019-0610-3013 revision: 2019-0620-4010 | Heating and cooling | $80,000 | — | Finaled Nov 9, 2021 | 201906113074 |
| Jun 24, 2019 | otc alterations permit: t.i. of cuia acai and positive store, non structural wall, equipment, finishes with associated plumbing, electrical and mechanical. n/a for maher | Plumbing | $55,000 | — | Finaled Sep 17, 2019 | 201903195680 |
| Jun 6, 2019 | otc alterations permit: 31st flr -mechanical and electrical permit to support approved arch pa 201905231554. demo and install of duct work. n/a for maher | Heating and cooling | $60,000 | — | Finaled Oct 24, 2019 | 201906062728 |
| Apr 8, 2019 | otc alterations permit: fire alarm work for the "visa" remoedl on floor 5b; additions are 7 smoke detectors, 2 duct detectors, 7 modules, 39 speaker/strobes, and 9 strobes. 5 smoke detectors have also been relocated. ref pa #201809190716. maher na | Heating and cooling | $37,900 | — | Finaled Apr 25, 2019 | 201904087314 |
| Mar 25, 2019 | otc alterations permit: 7/f: meps: install new supply air duct per sheet m2.1, install new exhaust duct per sheet m2.1, balnce griles prer sheet m2.1 | Heating and cooling | $1 | — | Finaled May 1, 2019 | 201902284001 |
| Dec 19, 2018 | otc alterations permit: air conditioning duct & diffusers ref pa 2018-0831-8852 | Heating and cooling | $62,500 | — | issued | 201812198703 |
| Nov 26, 2018 | otc alterations permit: 7/f -light demo of non structural elements. build-out of 2 showers, not limited to doors, finishes, ceiling lightings and electrical maher na | Electrical | $95,000 | — | Finaled May 2, 2019 | 201807104064 |
| Nov 21, 2018 | otc alterations permit: 12th flr, suite 1275. demo and install lighting w/ controls, receptacles. fire alarm under separate permit. ref electrical permit e201811016895 | Electrical | $25,000 | — | Finaled Feb 27, 2019 | 201811216558 |
| Oct 26, 2018 | otc alterations permit: ref 201810011852. demo remove existing invisible lowside ductwork serving suite. instal new low side duct work and diffusers based on new zoning re-balance vav box. suite 1275 | Heating and cooling | $33,200 | — | Finaled Feb 27, 2019 | 201810264225 |
| Jul 23, 2018 | otc alterations permit: fire alarm work for the "google" remodel on fl 12a; additions are 17 smoke detectors, duct detectors, strobe power supply, speakers/strobes, and strobe | Heating and cooling | $51,325 | — | Finaled Sep 6, 2018 | 201807205039 |
| Jun 8, 2018 | otc alterations permit: t-24 mechanical electrical to install new condensor, heat pump, vav box, relocate grill, re-balance systems and add lighting/power. ref pa 2018-0524-0114. n/a for maher | Heating and cooling | $32,000 | — | Finaled Oct 10, 2018 | 201806010800 |
| Feb 27, 2018 | otc alterations permit: fire alarm work for the visa remodel on floor 8b, additions are 12 smoke detectors, 2 duct detectors, 1 strobe power supply, 28 speakers/stobes, 4 strobes, and the relocation of 4 smoke dectors/2 duct detectors. ref, permit 201711022942. n/a for maher | Heating and cooling | $32,500 | — | Finaled Apr 16, 2018 | 201802272275 |
| Jan 9, 2018 | otc alterations permit: title 24 - electrical for work under pa 2017-1011-0915; n/a maher | Electrical | $68,000 | — | Finaled Mar 15, 2019 | 201801098186 |
| Dec 12, 2017 | otc alterations permit: ground floor - title 24 electrical for work under pa 2017-0801-3532 | Electrical | $14,000 | — | Finaled Jan 26, 2018 | 201712126183 |
| Dec 8, 2017 | otc alterations permit: 12/f- soft demo only, demo of partitions, doors, ceilings, electrical, plumbing, millwork, finishes & hvac throughout floor. sprinkler permit# 201712085875. n/a ordinance #155-13. ab-017 | Heating and cooling | $200,000 | — | Finaled Dec 26, 2018 | 201712085901 |
| Nov 27, 2017 | otc alterations permit: 8th floor: interior t.i. for drywall, ceilings finishes, mech, elec and plumbing. n/a for maher | Plumbing | $1,815,000 | — | Finaled Nov 6, 2018 | 201711022942 |
| Oct 23, 2017 | otc alterations permit: suite 2600: title 24 permit for tenant improvement to lighting and control. electrical work only | Electrical | $5,000 | — | issued | 201710231943 |
| Jun 26, 2017 | additions alterations or repairs: demolition of existing interior walls & ceiling. remove plumbing & electrical fixtures 1st floor new dental office | Plumbing | $524,000 | — | Finaled Jul 2, 2018 | 201706129005 |
| Apr 4, 2017 | otc alterations permit: spear tower - 38a flr: fire alarm. add 12 smoke detectors, 1 strobe power supply, 35 speaker/strobes, 11 strobes. relocate 3 duct detectors and 3 smoke detectors ref 201609127394 maher na | Heating and cooling | $34,620 | — | Finaled Apr 11, 2017 | 201703312868 |
| Apr 4, 2017 | otc alterations permit: spear tower - 37a flr: fire alarm. add 12 smoke detectors, 1 strobe power supply, 34 speaker/strobes, 8 strobes. relocate 4 duct detectors and 3 smoke detectors ref 201609087059 maher na | Heating and cooling | $32,880 | — | Finaled Apr 11, 2017 | 201703312863 |
| Feb 21, 2017 | otc alterations permit: remodel of front of house of an service restaurant the scope includes replacing new non bearing partitions, new finishes, replace selected kitchen equip. and replace front of house light fixtures and controls. existing hvac system to remain as is maher na | Heating and cooling | $60,000 | — | Finaled Aug 10, 2017 | 201612225744 |
| Nov 1, 2016 | otc alterations permit: 37/f- selective interior non-structural demo, non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy or use and no change in floor area. horizontal exit seperation proided, fire barrier & standpipes required as shown. n/a maher | Heating and cooling | $2,444,160 | — | Finaled Oct 20, 2017 | 201609087059 |
| Oct 25, 2016 | otc alterations permit: t-24 mechanical and electrical for work done under pa 2016-0728-3621. maher na | Electrical | $7,500 | — | Finaled Jan 27, 2017 | 201610241007 |
| Oct 11, 2016 | otc alterations permit: floor 42a fire alarm work for the "fortress" southwest area remodel on floor 42a; the addition is 1 duct detector for a new heat pump and replace two spear/strobes- up dba to 75 on strobes. ref pa 2016-0817-5205. maher na | Heating and cooling | $1,500 | — | Finaled Oct 28, 2016 | 201610119857 |
| Oct 7, 2016 | otc alterations permit: spear tower: selective interior non-structural demo new non-structural partitions,doors,ceiling,lights millwork finishes,electrical,plbg,& hvac. there will be no change in occupancy/use & no change in floor area. horizontal exit separation is provided.fire barrier is shown on sheet f. 38a-2.0 | Heating and cooling | $2,627,000 | — | Finaled Oct 20, 2017 | 201609127394 |
| Sep 30, 2016 | otc alterations permit: fire alarm work for the google partial floor remodel on floors 17a and 18a. additions are 2 duct detectors, 16 speaker/strobes, 1 strobe ref pa#2016 0519 7863 & 2016 0623 0731. n/a for maher | Heating and cooling | $9,890 | — | Finaled Oct 11, 2016 | 201609299172 |
| Sep 19, 2016 | otc alterations permit: fire damper on new exhaust duct crossing the demising wall has been deleted. the demising wall is non- fire rated and is not a smoke barrier forming the smoke containment envelope. revision to app#201606210513. n/a for maher | Heating and cooling | $1 | — | issued | 201608235793 |
| Sep 9, 2016 | sign - erect: non electric banners projecting from ground floor restaurant | Electrical | $5,000 | — | issued | 201609066810 |
| Sep 9, 2016 | sign - erect: non electric wall sign ground floor | Electrical | $10,000 | — | issued | 201609066809 |
| Sep 2, 2016 | otc alterations permit: 1st flr: fire alarm - add 2 duct detectors, 9 speaker/strobes amd 3 dtrobes. mmaherna ref pa 201508144307 | Heating and cooling | $7,340 | — | Finaled Sep 14, 2016 | 201609026652 |
| Aug 1, 2016 | sign - erect: electric wall sign for "flywheel". n/a ordinance #155-13 | Electrical | $5,000 | — | Finaled Mar 3, 2017 | 201607273443 |
| Jul 19, 2016 | otc alterations permit: steuart tower, 7th floor: t-24 mechanical and electrical for work done under pa 2016-0304-1261. maher na | Electrical | $37,000 | — | Finaled Dec 12, 2018 | 201607182629 |
| Jul 19, 2016 | otc alterations permit: revision to 201608144307, 201603152082 revised mechanical and electrical gr fl retail lobby. structural framin for hvac unit maher not req | Heating and cooling | $1 | — | Finaled Oct 21, 2016 | 201606210513 |
| Jul 5, 2016 | otc alterations permit: 18th floor: spear street tower: selective interior non-structural demo, new non-structural partitions, doors, ceilings, lights, millwork, finishes , elec and hvac. no change in occupancy use or floor area. n/a for maher | Heating and cooling | $902,280 | — | Finaled Dec 8, 2016 | 201606230731 |
| Jul 5, 2016 | otc alterations permit: spear tower: selective interior non-structural demolition, non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical and hvac. no change in occupancy, use or floor area. n/a ordinance #155-13 | Heating and cooling | $131,040 | — | Finaled Dec 8, 2016 | 201605197863 |
| Jun 20, 2016 | otc alterations permit: revision to app#201508144307, 201603152082, & 201604296163 at ground floor for relocation of water heater. n/a for maher | Water heater | $1 | — | Finaled Oct 21, 2016 | 201606150051 |
| Jun 17, 2016 | otc alterations permit: 7th flr: steuart tower, ti consisting of demolition of millwork,finishes,lighting & associated elec. construction of new non-structural partitions,elec fixtures,millwork,doors/frames/hardware & associated mechanical,relocation of plumbing; maher n/a | Plumbing | $131,760 | — | Finaled May 8, 2017 | 201603041261 |
| Jun 2, 2016 | otc alterations permit: electrical work for tenant improvement 201605117101 maher not req | Electrical | $7,500 | — | issued | 201606018804 |
| Jun 2, 2016 | otc alterations permit: floor 19a, fire alarm work for the "wsgr" ti remodel on floor 19a; additions are 9 smoke detectors, 1 module, 1 strobe power supply, 31 speaker/strobes, 2 strobes, as well as the relocation of 5 stroes, 2 smoke detectors, and 2 duct detectors. ref pa 2015-1228-5936. maher na | Heating and cooling | $29,300 | — | Finaled Jun 7, 2016 | 201606018794 |
| May 3, 2016 | otc alterations permit: mep revision to pa 2016-0315-2082, mechanical - revised hvac unit designation, intake and outside air intake ducting. electrical - revised lighting schedule, change to sensors, switches location, remove, revise outlets. plumbing - change water heater system, relocate mop sink , add floor sink | Water heater | $1 | — | Finaled Oct 21, 2016 | 201604296163 |
| Apr 5, 2016 | otc alterations permit: floor 7a fire alarm work for th e "google" t.i. project; additoins are 17 smoke detectors, 8 modules, 1 strobe power supply, 35 speaker/strobes, 8 strobes & the relocation of 6 duct detectors. ref #201511031519. n/a maher ordinance | Heating and cooling | $41,300 | — | Finaled Apr 20, 2016 | 201604053905 |
| Mar 28, 2016 | additions alterations or repairs: new roof deck consisting of installation of pedestal paver system on roof. no structural work. no change in area or occupancy. elec under sep permit | Roofing | $130,000 | — | Finaled Feb 1, 2017 | 201511102251 |
| Feb 29, 2016 | wall or painted sign: install non-electric door sign "proper food" maher na | Electrical | $2,260 | — | Finaled Aug 11, 2016 | 201512084375 |
| Feb 11, 2016 | otc alterations permit: 15th floor - selective interior non-structural demolitoin, new non-structural partitoins, doors, ceiling, lights, millwork finishes, electrical , plumbing & hvac. no change in occupancy or use or change in floor area | Heating and cooling | $537,360 | — | Finaled Sep 21, 2016 | 201602058902 |
| Feb 11, 2016 | otc alterations permit: selective interior non-structural demolition, new non-structural partitions, door, ceiling, lights, millwork finishes, electrical, plumbing and hvac. there will be no change in occupancy or use and no change in floor area. maher na | Heating and cooling | $797,640 | — | Finaled Sep 21, 2016 | 201602038676 |
| Feb 11, 2016 | otc alterations permit: selective interior non-structural demolition, new non-structural partitions doors, ceiling, lights, millwork finishes, electrical, plumbing and hvac. no change in occupancy or use and no change in floor area. n/a ordinance #155-13 | Heating and cooling | $537,360 | — | Finaled Sep 21, 2016 | 201602028553 |
| Feb 10, 2016 | otc alterations permit: 15/f: mechanical and electrical work associated with t.i. per permit app#201601267976. n/a for maher | Electrical | $280,140 | — | Finaled Mar 7, 2017 | 201602089016 |
| Jan 26, 2016 | additions alterations or repairs: installation of a temporary tent to be used for superbowl 50 events. tent to be erected on the roof plaza of steuart tower ** maher: n/a ** | Roofing | $50,000 | — | issued | 201511051819 |
| Jan 20, 2016 | otc alterations permit: fire alarm work for the "lobby renovation" project on the street level; additions are 22 smoke detectors, 2 pull stations, 6 modules, 2 strobe power supplies, 45 speaker/strobes, 2 strobes and the relocation o f 1 duct detector. ref pa 2014-0218-8751 | Heating and cooling | $50,000 | — | Finaled Jan 27, 2016 | 201601207401 |
| Jan 12, 2016 | otc alterations permit: fire alarm work for the "google" ti, remodel on floor 14a; additions are 11 smoke detectors, 5 modules, 1 strobe power supply, 34 speaker/strobes, 6 strobes and the relocation of 34 duct detectors. ref pa 2015-0805-3357. maher na | Heating and cooling | $33,600 | — | Finaled Jan 27, 2016 | 201601116731 |
| Jan 11, 2016 | otc alterations permit: fire alarm work for the "google" ti remodel on floor 13a; additions are 13 smoke detectors, 1 module, 1 strobe power supply, 37 speaker/strobes, 6 strobes and the relocation of 4 duct detectors. ref pa 2015-0806-3547. maher na | Heating and cooling | $34,200 | — | Finaled Jan 27, 2016 | 201601116725 |
| Jan 11, 2016 | otc alterations permit: fire alarm work for the "google" ti remodel on floor 16a; additions are 14 smoke detectors, 4 modules, 1 strobe power supply, 37 speaker/strobes, 6 strobes and the relocation of 4 duct detectors. ref pa 2015-0804-3216. maher na | Heating and cooling | $36,300 | — | Finaled Jan 27, 2016 | 201601116724 |
| Dec 17, 2015 | otc alterations permit: fire alarm work for the "google" ti remodel on floor 9a; additions are 11 smoke detectors, 6 modules, 1 strobe power supply, 36 speaker/strobes, 2 strobes, and the relocation of 2 duct detectors. ref pa 2015-0715-1513. maher na | Heating and cooling | $30,300 | — | Finaled May 22, 2020 | 201512114785 |
| Dec 17, 2015 | otc alterations permit: fire alarm work for the "google" ti remodel on floor 8a; additions are 10 smoke detectors, 6 modules, 1 strobe power supply, 36 speaker/strobes, 2 strobes, and the relocation of 2 duct detectors. ref pa 2015-0728-2684. maher na | Heating and cooling | $29,200 | — | issued | 201512114784 |
| Nov 20, 2015 | otc alterations permit: fire alarm work for the "google cafe: ti remodel on floor 4a; additions are 2 duct detectors, 1 module, 16 speaker/strobes and 2 strobes. ref pa 2015-0529-7473 | Heating and cooling | $10,800 | — | Finaled Dec 2, 2015 | 201511203170 |
| Nov 20, 2015 | otc alterations permit: spear tower, 19th floor - demolition of walls, flooring, mechanical and electrical systems, ceiling tiles per ab-17. n/a ordinance #155-13 | Electrical | $110,000 | — | Finaled Jul 19, 2016 | 201511132500 |
| Nov 5, 2015 | otc alterations permit: 7th fl: selective interior non-structural demolition, non-structural partitions, doors, ceiling, lights, millwork finishes, elec, plumbing and hvac. no change in occupancy and no change in floor area providing horizontal exits. mep, life safety and roof deck work on deferred submittals | Heating and cooling | $1,140,000 | — | Finaled Aug 30, 2016 | 201511031519 |
| Nov 5, 2015 | otc alterations permit: verizon wireless to install temporary mrru's on wall above 1/f atrium. equipment & mrru's to be removed after the super bowl. no electrical work to be done. equipment plugs into wall socket. n/a maher ordinance. removal date feb 22, 2016. temp relay for service for only within bldg | Electrical | $20,000 | — | Finaled Jan 11, 2017 | 201509116702 |
| Oct 30, 2015 | otc alterations permit: fire alarm work for the "google" ti remodel on floor 11a; additions are 14 smoke detectors, 4 modules, 1 strobe power supply, 37 speaker/strobes, 6 strobes, and the relocation of 3 duct detectors ref pa 2015-0630-0274. maher na | Heating and cooling | $33,900 | — | Finaled Nov 13, 2015 | 201510301203 |
| Oct 30, 2015 | otc alterations permit: fire alarm work for the "google" ti remodel on floor 10a; additions are 11 smoke detectors, 4 modules, 1 strobe power supply, 34 speaker/strobes, 6 strobes, and the relocation of 3 duct detectors ref pa 2015-0630-0272.maher na | Heating and cooling | $30,600 | — | Finaled Nov 13, 2015 | 201510301202 |
| Oct 7, 2015 | otc alterations permit: add breaker to extg electrical panel. run electrical lines in conduit to dis server. install small antennas on bldg and bellas mount. run fiber optic and coaxial cable in conduit in bldg and exterior. cellsite modification | Electrical | $50,000 | — | issued | 201509096501 |
| Oct 6, 2015 | otc alterations permit: tenant improvement from an food service tenant to a new food service - new food prep area, partitoin walls, casework, interior lighting, plumbing, electrical & mechanical. no changes to exterior envelope. ref # 200904272112 & 201004301402. n/a maher ordinance | Plumbing | $120,000 | — | issued | 201509298281 |
| Sep 3, 2015 | additions alterations or repairs: 24th floor: electrical work associated with approved pa# 201506169073, including new lighting, vav boxes and fsds. n/a for maher ordinance | Electrical | $574,050 | — | Finaled May 6, 2016 | 201507010421 |
| Aug 28, 2015 | otc alterations permit: selective interior non-structural demo, non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy and no change in floor area. providing horizontal exits. n/a ordinance #155-13 | Heating and cooling | $1,300,000 | — | issued | 201508053357 |
| Aug 25, 2015 | otc alterations permit: revision to app#201506169073 and 201506179227 to reconfigure corridor and doorway and revise battery information | Solar | $1 | — | Finaled May 6, 2016 | 201508255253 |
| Aug 13, 2015 | otc alterations permit: 16th floor spear tower - selective interior non-structural demo, new non-structural partitoins, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy & no change in floor area. providing horizontal exits. n/a maher ordinance | Heating and cooling | $1,500,000 | — | Finaled Aug 30, 2016 | 201508043216 |
| Aug 4, 2015 | otc alterations permit: mechanical, electrical, plumbing. interior previously permitted under 201507151513. no change in occupancy or floor area. ref arch app # 2015.0715.1513; maher n/a | Plumbing | $1 | — | Finaled May 16, 2016 | 201507312981 |
| Aug 4, 2015 | otc alterations permit: 8th fl: selective interior non structural demo. new non structural partitions, doors, ceiling, lights, millwork finishes, elec, plumb, hvac. no change in occupancy or floor area. mep sep permit. horizontal exit separation provided. fire barrier shown on sheet c08a-2.0 req stand pipes | Heating and cooling | $1,303,379 | — | Finaled May 16, 2016 | 201507282684 |
| Jul 23, 2015 | otc alterations permit: 11th floor: mechanical, electrical and plumbing. t.i. under appl. 2015.0630.0274. maher n/a | Plumbing | $1 | — | issued | 201507020515 |
| Jul 23, 2015 | otc alterations permit: 10th floor: mechanical, electrical, plumbing only. t.i. work under appl.# 2015.0630.0272. maher n/a | Plumbing | $1 | — | Finaled Mar 7, 2016 | 201507020514 |
| Jul 20, 2015 | otc alterations permit: 9th floor: new hortzotail exit, selective interior non-structural demolition, new non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plmg and hvac. no change in occupancy or floor areas. mep and life safty under seperate permit. n/a for the maher | Heating and cooling | $1,300,000 | — | Finaled May 16, 2016 | 201507151513 |
| Jul 7, 2015 | otc alterations permit: 3rd floor spear tower - fire alarm work for the google t.i. project on floor 3a: additions are 15 smoke detectors, 4 duct detectros, 4 modules, 2 strobe power supplies, 53 speaker/strobes, and 22 strobes. ref app#201502239006. n/a for maher | Heating and cooling | $51,200 | — | Finaled Jul 30, 2015 | 201507030610 |
| Jun 23, 2015 | otc alterations permit: 24/f: structural work assocviates with approved pa#201506169073 & a revised architectural sheet a0224to add battery information. compliance with maher ordinance 155-13 not required | Solar | $4,500 | — | Finaled May 6, 2016 | 201506179227 |
| Jun 11, 2015 | otc alterations permit: new structural support for heavy kitchen equipement, reinforcement for large penetrations, supports for partial height walls, added shaft platforms for mech equip ref 201503231539 maher not req. hood/duct under seperate permit | Heating and cooling | $50,000 | — | Finaled Jun 6, 2016 | 201505297462 |
| Mar 5, 2015 | otc alterations permit: mechanical & electrical work for pa#201502239006. n/a ordinance #155-13 adding 5 fire smoke dampers and detection | Electrical | $1,000,000 | — | Finaled Feb 5, 2016 | 201503050020 |
On Market St
1,600 permits on record on Market St.
| Trade | Permits | Since Oct 4, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 165 | 29 | $20,850 | $4,869–$190,409 | Jun 12, 2026 |
| Heating and cooling | 592 | 51 | $150,000 | $22,660–$1,164,338 | Aug 21, 2026 |
| Electrical | 537 | 51 | $44,000 | $1,000–$800,000 | Aug 17, 2026 |
| Plumbing | 276 | 39 | $150,000 | $1–$2,072,898 | Sep 28, 2026 |
| Solar | 23 | 2 | — | under 5 | Jan 23, 2026 |
| Water heater | 7 | 1 | — | under 5 | May 27, 2026 |
Roof replacement cost in San Francisco
Across 5,889 one- and two-family reroof permits since October 4, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,760. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 4, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 4, 2026. Owner names are not shown on any page.