1355 Market St, San Francisco
39 home-service permits on record at 1355 Market St, San Francisco; the roof was last permitted on Aug 3, 2023 at a declared value of $3,500.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Dec 8, 2023 | otc alterations permit: install level 3 ev charger in garage | Electrical | $50,000 | — | Finaled Jan 4, 2024 | 202308154486 |
| Aug 7, 2023 | otc alterations permit: existing fire sprinkler system -tenant improvement. new ev charging stations-20 sprinklers. no underground work | Electrical | $13,000 | — | Finaled Oct 30, 2023 | 202308043812 |
| Aug 3, 2023 | otc alterations permit: comply w/ dbi nov# 202311248 and address planning sf complaint# 2023-006909enf. to document removal of metal structure at roof area facing market st. metal structure in the shape of "x" was installed without benefit of proper permits | Roofing | $3,500 | — | Finaled Aug 7, 2023 | 202308013479 |
| Mar 24, 2022 | otc alterations permit: 1st fl: fire only work to add a switch module to be programmed for the ability to disable individual kitchen hood system inputs. no ref permit for this addition and no electrical work | Electrical | $800 | — | Finaled Jun 9, 2022 | 202203240746 |
| Oct 20, 2021 | otc alterations permit: 3rd fl. electrical only permit to support arcitetural, new lighting, controls, receptacles and card readers | Electrical | $8,000 | — | Finaled May 26, 2022 | 202110200872 |
| Jun 16, 2021 | otc alterations permit: 3/f: alteranation to (e0 interior executive suite. electrical drawings included | Electrical | $55,000 | — | Finaled May 13, 2022 | 202106041703 |
| Nov 8, 2019 | otc alterations permit: build out 6,269 sf. food court style market space, base infrastructure & public space. individual tenant spaces shall submit separate pemits for tenant space interior build outs. mechanical, ele, plumbing and fire sprinkler modifications under sep permits | Plumbing | $100,000 | — | issued | 201909161786 |
| Jul 19, 2019 | otc alterations permit: electrical work for twitter exec.desk build out. new light fixtures, lighting control and power modifications. ref 201902213470 maher na | Electrical | $800,000 | — | Finaled Jun 30, 2020 | 201907196348 |
| May 23, 2019 | otc alterations permit: 11th flr, pyrochem recofiguration. repipe and rework 1 pyro chem fire suppression system in the main kitchen area | Plumbing | $5,200 | — | Finaled Feb 6, 2020 | 201905221358 |
| Apr 16, 2019 | otc alterations permit: ref pa# 201811286834; new structural work on fl. 10 including anchorage for lighting. also plumb core requiring reinforcement of slab | Plumbing | $48,821 | — | Finaled Jul 15, 2020 | 201904047096 |
| Apr 10, 2019 | otc alterations permit: rebalance vav boxes. install new vav boxes to serve new zones, relocate and install new low side duct and grilles as needed, demo and install new low-side duct and grills as required, relocate vav thermostats as required | Heating and cooling | $168,000 | — | issued | 201904107551 |
| Mar 18, 2019 | otc alterations permit: 4th fl suite 488 occupied space include new electrical to match work. ref pa# 201811266652 | Electrical | $70,000 | — | issued | 201903114913 |
| Feb 13, 2019 | otc alterations permit: electrical work for the twitter level 9, commons buildout. new light fixtures throughout, lighting control, power modernizations. ref pa #201811135675 | Electrical | $1,050,000 | — | Finaled Jun 30, 2020 | 201902132801 |
| Feb 13, 2019 | otc alterations permit: electrical work for the twitter level 10, perch buildout. new light fixtures throughout, lighting control, power modernizations. ref pa #201811286834 | Electrical | $575,000 | — | Finaled May 27, 2020 | 201902132800 |
| Feb 13, 2019 | otc alterations permit: electrical work for the twitter level 8 buildout. new light fixtures throughout, lighting control, power modernizations. ref pa #201807275785 | Electrical | $1,200,000 | — | issued | 201902132777 |
| Feb 1, 2019 | otc alterations permit: 9th fl: install new air distribution for tenant build out. relocate dishwasher hood exhaust locations. install new condenser water lines to serve new walk in cooler. ref pa #201811135075 | Heating and cooling | $127,700 | — | Finaled Jun 30, 2020 | 201902011837 |
| Nov 9, 2018 | wall or painted sign: painted sign, non electric, door/window. ** maher: n/a ** | Electrical | $1,000 | — | issued | 201712186702 |
| Oct 18, 2018 | otc alterations permit: deferred electrical lighting & power on 7th fl. ref #201805229753. vif card reader door and emergency lighting of improved space | Electrical | $150,000 | — | issued | 201807275696 |
| Jul 23, 2018 | otc alterations permit: 7th flr - new interior partition, glazing, doors, millwork, lighting, electrical, audio visual, telecom. plm/mech deferred | Electrical | $5,089,508 | — | Finaled Jan 2, 2019 | 201805229753 |
| Dec 26, 2017 | sign - erect: erect electric, wall, single faced sign. n/a for maher ordinance | Electrical | $6,000 | — | issued | 201507272464 |
| Mar 14, 2017 | otc alterations permit: revision to pa 2016-0822-5607 electric revision to lighting not installed. existing lighting to remain | Electrical | $1 | — | Finaled May 17, 2017 | 201703141408 |
| Jan 18, 2017 | otc alterations permit: hvac and electrical permit 7th flr: pariial ti to corporate mail room maher na. ref app#201612074400 | Heating and cooling | $60,000 | — | Finaled Aug 29, 2017 | 201701066687 |
| Dec 8, 2016 | otc alterations permit: partial 7th fl tenant improvement to existing corporate mail room with selective demo, partition, ceiling, finish. mech, elec, fire, ls under sep permit. no structural & plumbing work. maher not req | Plumbing | $200,000 | — | Finaled Aug 29, 2017 | 201612074400 |
| Nov 4, 2016 | otc alterations permit: installation of an ansul r-102 kitchen hood fire suppression system to protect 2 electric oven/steamers. n/a maher ordinance | Electrical | $5,000 | — | issued | 201611041935 |
| Oct 19, 2016 | otc alterations permit: 1st floor: ti - to a food service kiosk within an food court. the scope includes new fixtures, finishes and plumbing. mech/ele/plumb, lighting & life safety under sep permit. no exterior work. maher na | Plumbing | $18,941 | — | Finaled Mar 21, 2017 | 201610039422 |
| Sep 2, 2015 | otc alterations permit: 9th floor - electrical work for tenant improvement. ref #2015.0112.5439. n/a maher ordinance | Electrical | $2,000 | — | Finaled Nov 17, 2015 | 201509015756 |
| Aug 14, 2015 | otc alterations permit: fire alarm work: adding 19 speaker /strobes, 1 strobe, 2 interface modules & 7 duct detectors. ref pa 2013-1219-4586 | Heating and cooling | $11,000 | — | issued | 201508144248 |
| Aug 12, 2015 | otc alterations permit: install six heat pumps, one outside air supply fan, one grease exhaust fan, flue, grease exhaust duct & supply & return ductwork. mechanical submission for pa #2013.1219.4586. fire suppression and hood installation separte permit.n/a for maher | Heating and cooling | $198,500 | — | Finaled Mar 17, 2016 | 201410169049 |
| Aug 11, 2015 | sign - erect: erect an electric double faced projecting sign. n/a maher ordinance | Electrical | $6,000 | — | Finaled Oct 27, 2015 | 201508113938 |
| Aug 6, 2015 | otc alterations permit: revision to 2015 07141374 to include plenum and duct protection for dishwasher hood. compliance with maher ordinance no 155-13 not required | Heating and cooling | $1 | — | Finaled Aug 25, 2015 | 201508063519 |
| Aug 4, 2015 | ReRoof: reroofing; removal of copper roofing system installation of stainless steel hat channels to concrete deck. attachment of new copper roofing system. ** maher: compliance with ordinance no# 155-13 not required ** | Roofing | $20,000 | — | Finaled Apr 19, 2016 | 201502037326 |
| Jul 15, 2015 | sign - erect: erect two electric projecting double faced wall signs for "cadillac bar & grill". n/a ordinance #155-13 | Electrical | $10,000 | — | Finaled Feb 3, 2016 | 201506300277 |
| Jun 26, 2015 | sign - erect: suite 180. erect one electric, double faced sign | Electrical | $900 | — | issued | 201503231634 |
| Jun 12, 2015 | otc alterations permit: fire alarm work for the floor 1 "cadillac bar" t.i. project; additions are 3 duct detectors, 5 modules, 1 strobe power supply, 4 speakers, and 13 speaker/strobes. ref permit pa 201405145712 | Heating and cooling | $13,800 | — | issued | 201506128807 |
| Jun 10, 2015 | additions alterations or repairs: suite 160, basement: grease ducts and exhaust fans, make-up air unit and ductwork, dishwasher hood, exhaust fan and ductwork, outside air fans, with hot water coils, ref. 201405145712; maher n/a | Heating and cooling | $342,000 | — | Finaled Aug 11, 2015 | 201504294873 |
| Apr 27, 2015 | otc alterations permit: grnd flr: installation of ansul r102 fire suppression system in the kitchen hood & duct maher na | Heating and cooling | $5,000 | — | Finaled Jun 24, 2015 | 201504274692 |
| Apr 6, 2015 | otc alterations permit: 1st flr- fire alarm wotk for ti "dirty water": 8 duct detectors, 3 modules 18 speaker/strobes. maher - not req'd ref. pa # 2014-0624-9278 | Heating and cooling | $15,000 | — | Finaled Jun 24, 2015 | 201504032723 |
| Mar 20, 2015 | otc alterations permit: suite 180: exterior duct work and shroud in courtyard. ref pa# 2014 0624 9278. maher - not req'd | Heating and cooling | $14,000 | — | issued | 201503120714 |
| Feb 2, 2015 | additions alterations or repairs: suite #160:tenant build out of a restaurant. mep, sprinklers, fire alarm, hood & duct suppression system on sep. permits. sffd public assembly permit required. n/a for the maher ordinance #155-13 | Heating and cooling | $675,000 | — | issued | 201405145712 |
On Market St
1,600 permits on record on Market St.
| Trade | Permits | Since Oct 6, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 165 | 29 | $20,850 | $4,869–$190,409 | Jun 12, 2026 |
| Heating and cooling | 592 | 51 | $150,000 | $22,660–$1,164,338 | Aug 21, 2026 |
| Electrical | 537 | 51 | $44,000 | $1,000–$800,000 | Aug 17, 2026 |
| Plumbing | 276 | 39 | $150,000 | $1–$2,072,898 | Sep 28, 2026 |
| Solar | 23 | 2 | — | under 5 | Jan 23, 2026 |
| Water heater | 7 | 1 | — | under 5 | May 27, 2026 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 6, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 293 one- and two-family heating and cooling permits since October 6, 2024, most declared values run from $21 to $223,693 (the middle 80%); the median is $25,996 and half fall between $5,000 and $120,000. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 6, 2026. Owner names are not shown on any page.