Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Oct 14, 2025otc alterations permit: basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall supportPlumbing$15,000—Finaled Jan 27, 2026202505287376
Sep 26, 2025otc alterations permit: installation of 12 ev chargers and associated electrical infrastructore. level 2Electrical$368,484—cancelled202509245995
Aug 27, 2025otc alterations permit: 8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of workHeating and cooling$175,000—Finaled Dec 3, 2025202506047877
Feb 28, 2025otc alterations permit: 1/fl office ti, conversion of storage space to mail room, no public facing space, remodel unisex toilet room, addition of drinking fountain, hvac upgrade, exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room andHeating and cooling$150,000—Finaled Jul 18, 2025202409251548
Nov 5, 2024otc alterations permit: 9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqftHeating and cooling$150,000—Finaled Apr 2, 2025202409251549
Oct 9, 2024otc alterations permit: 2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of workHeating and cooling$250,000—Finaled Aug 8, 2025202407156457
Sep 13, 2024otc alterations permit: providing 10 electric bike stations , 6 e-bike dual parking docks and 52 vertical standard bike racks in new wire mesh enclosure in the garage. power to electric bike charging stations as requiredElectrical$100,000—Finaled May 9, 2025202408269423
Aug 15, 2024otc alterations permit: 9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of workHeating and cooling$493,522—Finaled Feb 26, 2025202407156458
Apr 19, 2024otc alterations permit: 9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space planHeating and cooling$175,000—Finaled Jul 29, 2024202402125689
Nov 15, 2023otc alterations permit: 1st fl: remove and replace 1 duct smoke detector fcu 1-4. connect existing speaker/strobe circuit to new rps. ref pa# 202306210488Heating and cooling$18,000—Finaled Mar 12, 2024202311080439
Nov 15, 2023otc alterations permit: 1/f annex: f/a t.i., install speaker/strobes, rps, control module, duct detectors, relay modules, smoke detectors. reb bpa#202306079418Heating and cooling$26,854—Finaled Mar 21, 2024202311080425
Oct 16, 2023otc alterations permit: remove 4 smoke detectors, 4 door holders. add 1 speaker strobe, 2 duct detectors 2 relaysHeating and cooling$16,890—Finaled Nov 3, 2023202309196926
Sep 28, 2023otc alterations permit: 33/f: roof tenant improvement-add 1 speaker/strobes and 1 smoke dector. ref 201901220827Roofing$6,000—Finaled Nov 2, 2023202309196853
Sep 26, 2023otc alterations permit: 1/f annex: new pantry area w/new finishes/lighting, new tv wall @ collaboration area. hvac upgrade for new remodelHeating and cooling$135,000—Finaled Jul 17, 2024202306210488
Aug 11, 2023otc alterations permit: 5th fl - office remodel consisting of adding 3 offices w/new furniture & finishes & copy area. new lighting & hvac associated to new constructionHeating and cooling$125,000—Finaled Dec 14, 2023202306210493
Apr 6, 2023otc alterations permit: roof: 1 new back-up condenser water pump is being addedHeating and cooling$375,023—Finaled Jan 17, 2024202301120103
Aug 16, 2022otc alterations permit: 32nd fl: t.i. in a 33 floor hi-rise bldg.selective demo,new partiitons,doors,ceilings,mechanical,electrical & plumbing. work cafe classifed as employee breakroom/pantry. no change of usePlumbing$2,281,000—Finaled Apr 12, 2023202205113966
Jul 21, 2022otc alterations permit: 23/f: ref permit 202109178632. fa modification: remove 31 spkr/strbs, 7 smk detectors, 6 door holders, 3 emergency door release, 4 strbs. add 28 spkr/strbs, 8 strbs, 1 strb power supply, 3 control relays, 3 emergency door releases, 1 duct det., 1 rib, 1 two-way call stationHeating and cooling$30,000—issued202207128257
Jun 28, 2022otc alterations permit: 19th fl: remove 19 sprs/strb: 4 smk detectors, 6 door holders, 9 strobes, 3 spkrs, install 30 spkr/strobes 9 strobes 2 control relays, 1 duct detector 1 rib relays, 1 2-way call station replace 10 nac device w/new and 1 emergeny door release ref pa# 2021-1001-9629Heating and cooling$32,951—issued202206287244
Jun 28, 2022otc alterations permit: 24th fl: remove 28 sprs/strb: 6 smoke detectors, 6 door holders, 3 strobes, install 28 spkr/strb, 8 strobes, 3 control relays, 1 duct det. 2 rib 1 two way call station replace 3 emergency door release 11 nac device with new ref pa#2021-0923-9013Heating and cooling$30,000—issued202206287243
Jun 28, 2022otc alterations permit: 31 fl: modification remove sprk 1 strobe, detectors door holders, strobes emergency recess, install sprk/strb, strb, door releases duct detcetor, control relays rib relay, two wa call station,replace nac devices with new ref pa# 2021-1022-0996Heating and cooling$30,000—Finaled Dec 2, 2022202206287237
Jun 13, 2022otc alterations permit: 31st fl - conversion of offices/finishes/lighting; conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelHeating and cooling$1,530,000—Finaled Mar 24, 2023202110220996
Jun 13, 2022otc alterations permit: 19/f: conversion of offices/finishes/lighting, new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelHeating and cooling$1,530,000—Finaled Mar 24, 2023202110019629
Jun 13, 2022otc alterations permit: 24/f: conversion of offices/finishes/lighting; conference rooms, huddle and focus rooms. remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelHeating and cooling$1,530,000—Finaled Mar 24, 2023202109239013
Jun 13, 2022otc alterations permit: conversion of offices/finishes/lighting. new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. add one new heat pump. mep included. fire alarm/sprinklers under sep permitsHeating and cooling$1,530,000—Finaled Mar 24, 2023202109178632
Feb 4, 2022otc alterations permit: 30th floor: conversion of office to supply room. all fixtures to remain. hvac upgrade for area of construction onlyHeating and cooling$50,000—Finaled Mar 7, 2022202112104150
Dec 10, 2021otc alterations permit: 20/f f/a addition: install nac divices; emergeny door replace; duct det; rib relay; 2-way call box; replace spkr/strb w/ new demo nac devices; smk det; door holders; old emergengy door replace; spkrs; strobesHeating and cooling$28,700—Finaled Aug 31, 2022202112073891
Nov 5, 2021otc alterations permit: 6/f: fire alarm addition: install 1 contact relay; 1 duct detector, 2 aux relays. ref pa 202110271264Heating and cooling$3,168—Finaled Jan 27, 2022202111051888
Oct 28, 2021otc alterations permit: 20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permitHeating and cooling$2,087,176—Finaled Nov 23, 2022202107164536
Oct 27, 2021otc alterations permit: adding 1 new heat pump to 6th fl. no new fsd's are being addedHeating and cooling$41,342—Finaled Jan 6, 2022202110271264
Oct 27, 2021otc alterations permit: 17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms onlyHeating and cooling$250,000—Finaled Jun 24, 2022202108096055
Jul 15, 2021otc alterations permit: 9/f: conversion of offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of constructionHeating and cooling$466,000—Finaled Jan 31, 2022202104198849
Jul 13, 2021otc alterations permit: ref p/a 2021-0406-7935 f/a addition on 4/f: add duct detector; control relay; rib relayHeating and cooling$2,440—Finaled Aug 9, 2021202105271202
May 27, 2021otc alterations permit: ref. pa 2020-1017-6782. 1/f & basement f/a addition; remove spkrs; strobes; smks; add: c-rly, smks, spkr/strbs; strbs; duct det.; manual pull stations; monitor modules; rib rlys; emergency door release; yellow security override pull stationHeating and cooling$20,520—issued202104229173
May 3, 2021otc alterations permit: 4th flr: addition of 1 new heat pump for additional power/data for furniture. no new fire smoke dampers are being added. no new lighting workHeating and cooling$75,000—Finaled Sep 28, 2021202104067935
Mar 19, 2021otc alterations permit: 28th fl: add 1 new heat pump for additional power/ data/ wiremolds required for equipment in storage room 2813. no new smoke dampers being added. mechanical & electrical work onlyHeating and cooling$27,000—Finaled Jul 28, 2021202102235144
Mar 9, 2021otc alterations permit: ref p/a 2020-1010-6325 f/a t.i. on the 28th floor; remove spkr/strb; install spkr/strbs; strbs; control relays; rib relays; duct det.; synch mod; 2-way call box; remove & replace with new strb pwr supply; spkr/strb; strbs; duct det.; pull stationsHeating and cooling$39,800—Finaled Apr 19, 2021202102094321
Feb 22, 2021otc alterations permit: ref. p/a 2020-0924-4919. 21/f: demo; install new: spkr/strbs, strbs, spkr, relays, door releases, duct det/relay, 2-way comm stn ; replace w/new: spkr/strbs, relays, door releases, duct det, power supply, smk det, modsHeating and cooling$53,696—Finaled Apr 19, 2021202012281789
Feb 8, 2021otc alterations permit: ref. p/a 2020-0924-4923/ 5/f f/a modification: replace with new smoke det; duct det; control relays; monitor mod.; strb pwr supply; spkr/strobes; strobes; pull station; cntrl mod; add spkr/strobes; strobes; duct det; control relays; tw-wagHeating and cooling$53,080—Finaled Apr 1, 2021202012211499
Jan 7, 2021otc alterations permit: 28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodelHeating and cooling$790,150—Finaled Jul 15, 2021202010106325
Jan 5, 2021otc alterations permit: 29th floor: conversion of offices, finishes, lighting. conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodelHeating and cooling$790,150—Finaled Jul 28, 2021202010176713
Dec 2, 2020otc alterations permit: 27/f suite b: t.i. change of furniture in areas of work, covert offices to conference rooms. mechanical & electrical work in affected area of work. maher n/aElectrical$175,000—Finaled Jul 15, 2021202010025749
Dec 2, 2020otc alterations permit: 21/f: conversion of offices/finishes/lighting; conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/aHeating and cooling$1,530,000—Finaled Jul 15, 2021202009244919
Nov 6, 2020otc alterations permit: 5/f:t.i. to entire floor exceptiong of server room in suite 505 and building infrastruture spaces. new partitions, doors, ceilings, electrical, mechanical, plumbing, interior finishes and employee breakroom & pantry. maher n/aPlumbing$3,177,498—Finaled Apr 19, 2021202009244923
Oct 30, 2020otc alterations permit: 4/f & 5/f:t.i. selective demo of service room cabintes and equip assosciated mech & electrical, plumbing infrastructure service the space to be removed. maher n/aPlumbing$175,000—Finaled Dec 21, 2020202009244927
Jan 27, 2020otc alterations permit: 25th fl - ref pa 2019-1105-6451 f/a modification demo 9 speaker/strobes; install 13 speaker/strobes; 3 speakers; 2 strobes; 4 control relays; 1 emergency door release; 3 rib relays; 2 duct detectors; 1 smoke detector; 2 way comm call station; replace 2 emergency door releaseHeating and cooling$19,600—Finaled Apr 30, 2020202001272810
Dec 20, 2019otc alterations permit: 25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodelHeating and cooling$516,115—Finaled Jul 9, 2020201911056451
Dec 17, 2019otc alterations permit: 15th floor: office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodelHeating and cooling$715,803—Finaled Jun 15, 2020201911056455
Nov 1, 2019otc alterations permit: f/a modification 14th fl: remove 15 speaker strobess, 6 strobes. install 14 speakers/strobes, 3 strobes, 5 control relays, 3 emergency door release, 8 rib relays, 2 duct detectors, 1 slc loop card, 1 2-way comm call stationHeating and cooling$19,060—Finaled Mar 26, 2020201911016172
Oct 7, 2019otc alterations permit: 14th fl - area of work 14561 sf. office remodel of conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mechHeating and cooling$1,214,102—Finaled Jun 22, 2020201909060909
Oct 7, 2019otc alterations permit: 18th fl - area of work 1614 sf. office remodel of conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mechHeating and cooling$350,000—Finaled Jun 22, 2020201909060908
Oct 2, 2019otc alterations permit: install movable gas partitionElectrical$50,000—Finaled Jan 8, 2020201910023273
Sep 24, 2019otc alterations permit: 33rd fl - ref pa 2019-0605-2530 fa adds: remove 27 speaker/strobes; 6 door holders; 6 strobes, 6 det; install 36 spkr/strobes; 3 spkrs;4 strobe; 6 control relays, 3 door release; add 1 call station, 6 rib; 6 duct det; 2 audio amp; replace 1 strobe power supply; 3 strobes, 4 spkr/strobes; 12 dets, 3Heating and cooling$80,000—Finaled Nov 25, 2019201909202207
Sep 20, 2019otc alterations permit: 26th fl - ref pa 2019-0605-2531 fa adds: remove, 28 speaker/strobes; 2 strobes; 6 door holders; 6 det; install 42 spkr/strobes; 8 strobes; 7 control relays; 3 door release, 6 rib; 4 duct det; 12 zone amplifier; 1 call station; replace 1 bps; 12 detectors; 3 duct det, 3 mps; 3 monitor mod; 8 controlHeating and cooling$45,800—Finaled Nov 15, 2019201909202206
Jun 14, 2019otc alterations permit: 26/f, office remodel. conference rooms, huddle rooms, focus rooms, 1 breakroom, new furniture and finishes. upgrade all fixtures to led lighting, hvac upgrade for new remodel. maher n/aHeating and cooling$1,962,000—Finaled Jul 9, 2020201906052531
Jun 14, 2019otc alterations permit: 33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/aHeating and cooling$1,962,000—issued201906052530
Jun 5, 2019otc alterations permit: 08th floor: ref ti. 201901039517: remove:7 spkr/strbs:4 strobes;2 door holder; 2smoke detectors; intall:19 spkr/strbs;1 spkr,3strbs;5control relays;3 door release;2 door holder; 3 rib relays; 2 smoke det;4 duct detc;1 2way call box. replace; 1 strobe power supply;20 smoke detec;3 duct det; 9 ctr modHeating and cooling$48,420—Finaled Sep 25, 2019201906052527
May 17, 2019otc alterations permit: 8th flr. office remodel of conference rooms, huddle rooms, focus rooms and break rooms. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodelHeating and cooling$1,849,000—Finaled Jul 9, 2020201901039517
Apr 2, 2019otc alterations permit: suite 200. remodel of office space into waiting room, observation room & interview room. upgrae all lights fixtures in suite to led lighting. hvac upgrade for remodelHeating and cooling$90,000—Finaled Jul 30, 2019201903084749
Dec 6, 2018otc alterations permit: 27th fl - per pa 2018-0828-8510 f/a modificiation remove 13 speaker/strobes & 2 door holders; install 13 speaker/strobes; 2 speakers; 4 strobes; 14 control relays; 3 emergency door release; 2 door holders; 2 rib; 1 sic card; 1 duct det replace 1 rps; 4 strobes; 4 speaker/strobes; 15 smoke detectorsHeating and cooling$60,000—Finaled Feb 22, 2019201812067590
Nov 14, 2018otc alterations permit: modifcation on 30/f: remove 27 spkrs/strobes; 4 door holders & 2 smoke detectors. install new: 27 spkr/strobes, 6 spkrs; 3 strobes; 13 control relays; 3 emergency door release; 3 door holders; 10 rib relays; 2 duct det.; 1 slc loop cand. r/r: 1 bps; 3 strobes; 4 spkr/strobes; 16 smoke det.;3 ductHeating and cooling$36,916—Finaled Jan 31, 2019201811145805
Sep 19, 2018otc alterations permit: 30th flr - demo offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. maher naHeating and cooling$1,930,000—Finaled Mar 25, 2019201808288511
Sep 19, 2018otc alterations permit: 27th flr - demo offices/finishes. new conference rooms, huddle focus rm and breakroom. remodel, upgrade all light fixtures to led lighting. hvac upgrade for new remodel. partial remodel of 27th flr maher naHeating and cooling$1,028,000—Finaled Mar 12, 2019201808288510
Nov 28, 2017otc alterations permit: 7th floor fire alarm modifications: install speaker/strobes; speakers; control relays; emergency door release; duct detectros; rib relays; slc loop card; replace strobe to a speaker. ref amep pa #201708225486. n/a maher ordinanceHeating and cooling$11,354—Finaled Dec 20, 2017201711204357
Oct 19, 2017otc alterations permit: 22nd floor: ref app#201708023619 f/a modification to demo 3 speaker/strobes, install 8 speaker/stobes, 4 speakers, 3 control relays, 2 emergency door release,3 duct detectors, 5 rib relays, 1 slc loop card. n/a for maherHeating and cooling$18,799—issued201710191716
Oct 13, 2017otc alterations permit: 3/f: f/a mod:remove 3 wall strobes, 3 spkr/strb, 1 speaker. install 26 spkr/strb; 2 spkr,4 sd, 6door holders, 5 cntl rly, 1 emergency door release, 7 duct det, 9 rib rly, 1 slc loop cond, relocate 11spkr/stb, upgrade 5 smoke det to new, upgrade 1 spkr to spkr/strb. ref t.i. pa201706230196. maher n/aHeating and cooling$41,254—Finaled Feb 15, 2018201710131162
Oct 12, 2017otc alterations permit: 7/f- two focus rooms, finishes, upgrade of lighting to led, mechanical and electrical work for new spaces. n/a ordinance #155-13Electrical$225,000—issued201708225486
Sep 15, 2017otc alterations permit: remodel of 22nd floor - 3 focus rooms, 1 huddle room, small conference room, copy room, furniture/finishes. upgrade all lights to led mechanical & electrical for new spacesElectrical$400,000—Finaled Mar 25, 2019201708023619
Aug 23, 2017otc alterations permit: install protective guardrail at existing mechanical roof penthouse on an existnig low rise building. 333 market annex is 5 story highRoofing$5,000—Finaled Oct 11, 2017201708043910
Aug 8, 2017otc alterations permit: ref pa 2017-0329-2641 fa modification on 16th fl: remove 7 speaker/strobes & 6 speakers; install new: 6 speaker/strobes; 27 speakers, 1 strobe; 2 emergency door release; 2 rib relays; 1 control relay 1 speaker amplifire; 1 battery cabinet & 2 batteries. maher naSolar$21,074—Finaled Mar 15, 2019201708084139
Jul 31, 2017otc alterations permit: 11th fl remodel: add new focus rms, 4 small conf. rooms, enlarge existing breakroom, furniture and finishes. add 1 drinking fountain. upgrade existing lighting to led lighting. provide electrical, mechanical and plumbing in areas of workPlumbing$195,000—Finaled Mar 25, 2019201706220068
Jun 29, 2017otc alterations permit: 16th flr: add 22 new offices, 5 new focus rooms, 1 new huddle room, new conference room and new copy area. upgrade all lighting to led. new mech work and electrical work for new spaces. maher naElectrical$1,080,000—issued201703292641
Jun 23, 2017otc alterations permit: fire alarm addition on 2nd floor idf room - add 2 duct detectors for fsd's & heat pumps; 3 rib relays, 1 control relay. ref pa 201706199691. maher naHeating and cooling$3,084—Finaled Jul 19, 2017201706230168
Jun 19, 2017otc alterations permit: add new heat pump to save existing idf room, provide 2 new fire smoke dampers. connect to existing condenser waterHeating and cooling$45,000—Finaled Aug 21, 2017201706199691
Feb 1, 2017otc alterations permit: ground floor and mezzanine: demo 6 strobes and 4 speakers. install 5 speaker/strobes & one speaker. install 3 duct detectors for the new fcu's & 1 control relay. mezannine fl: demo 3 speakers, 3 strobes. install 11 speaker/strobes. relocate 2 pull stations. remove & replace 1 smoke det. with nwHeating and cooling$14,124—Finaled Jul 19, 2017201702018423
Aug 10, 2016otc alterations permit: 4/f- fire alarm modification to upgrade strobe power supply, emergency door release, strobes to speaker/strobes, strobes, install new speaker/strobes, strobes, duct detectors, control relay, pilot relays. t.i. pa#201606220649. n/a ordinance #155-13Heating and cooling$17,000—Finaled Dec 5, 2016201608104633
Jun 27, 2016otc alterations permit: ground floor: remodel of office tenant imporvement with new finishes/power/lighting/hvac ref pa 2014 0521 6369Heating and cooling$148,000—Finaled Dec 12, 2016201606028985
Aug 28, 2015otc alterations permit: 1/f annex bldg: revision to pa#201507090991, install duct detector for the fcu, install control relay, install rib relay. t.i. pa# 201503050022, mech pa# 201505196673. n/a ordinance #155-13Heating and cooling$1,600—Finaled Sep 11, 2015201508275483
Jun 24, 2015otc alterations permit: relocation of existing ducts and grills. add ac condensing unit . add vav boxes. add exhaust fan. for t.i. appl. 2015.0305.0022 mechancial work. revision to pa# 201503050022, electrical and structural. n/a maher ord # 155-13Heating and cooling$50,000—Finaled Oct 15, 2015201505196673

On Market St

1,600 permits on record on Market St.

TradePermitsSince Oct 5, 2024Median declaredRangeLast
Roofing16529$20,850$4,869–$190,409Jun 12, 2026
Heating and cooling59251$150,000$22,660–$1,164,338Aug 21, 2026
Electrical53751$44,000$1,000–$800,000Aug 17, 2026
Plumbing27639$150,000$1–$2,072,898Sep 28, 2026
Solar232—under 5Jan 23, 2026
Water heater71—under 5May 27, 2026

Roof replacement cost in San Francisco

Across 5,872 one- and two-family reroof permits since October 5, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 5, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 5, 2026. Owner names are not shown on any page.