455 Market St, San Francisco
44 home-service permits on record at 455 Market St, San Francisco; no roofing permit on record.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| May 25, 2023 | otc alterations permit: 6/f: title 24 electrical, ref t.i. pa# 202211227010 | Electrical | $78,000 | — | issued | 202305258553 |
| May 25, 2023 | otc alterations permit: 18/f: title 24 electrical, ref t.i. pa#202302091720 | Electrical | $30,000 | — | Finaled Jul 12, 2023 | 202305258552 |
| Feb 2, 2023 | otc alterations permit: hvac tenant improvement install new ater source heat pump, install ceiling plunum, mounted exhaust fan install carbon dioxide sensor. convert e control system to ddc. provide air balancer. base building hvac system remains unchanged | Heating and cooling | $149,417 | — | issued | 202302021258 |
| Oct 15, 2021 | otc alterations permit: 21st floor:add 2 transfer fans modify extg hvac systems, relocate thermostats and air balance | Heating and cooling | $8,000 | — | Finaled May 16, 2022 | 202110150564 |
| May 25, 2021 | otc alterations permit: 2/f: electrical title 24 comlpliance. ref t.i. pa201901241114. maher n/a | Electrical | $234,305 | — | Finaled Jul 6, 2021 | 202010025744 |
| Jan 26, 2021 | otc alterations permit: 3/f: electrical title 24 comlpliance. ref t.i. pa201901241116. maher n/a | Electrical | $1 | — | Finaled Jul 6, 2021 | 202010025772 |
| Dec 24, 2020 | otc alterations permit: unit #1920: electrical t-24 only. reference pa #2019-1227-0780 | Electrical | $1 | — | Finaled Feb 8, 2021 | 202008242522 |
| Oct 28, 2020 | otc alterations permit: unit #1200: electrical t-24 only. reference pa #2019-1227-0782 | Electrical | $1 | — | Finaled Feb 8, 2021 | 202008242521 |
| Feb 27, 2020 | otc alterations permit: fire alarm work for "pli" remodel; additions are 2 smoke detectors, 5 duct detectors, 7 speakers, 26 speaker/strobes and 3 strobes. ref pa 2019-1217-9718 | Heating and cooling | $31,800 | — | Finaled Aug 11, 2020 | 202002265422 |
| Jan 24, 2020 | otc alterations permit: 23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or area | Plumbing | $1,086,000 | — | Finaled Nov 18, 2020 | 201912179718 |
| Jan 15, 2020 | otc alterations permit: mech for suite 201 & 202 on 2nd fl: add 1 heat pump, add 3 transfer fans, add heat pump thermostat, relocate existing vav thermostats, new duct work, & air balanace. ref pa #201901241114 | Heating and cooling | $60,000 | — | Finaled Jul 6, 2021 | 202001151905 |
| Jan 15, 2020 | otc alterations permit: mech for suite 300 on 3rd fl: add 1 heat pump, 4 vav boxes, add 2 fire smoke dampers, add 1 heat pump thermostat, add 4 vav thermostats. rleocate existing vav thermostats, new ductwork, & air balance. ref pa #201901241116 | Heating and cooling | $150,000 | — | Finaled Jul 6, 2021 | 202001151903 |
| Jan 7, 2020 | otc alterations permit: selective demo and construction of non load bearing partitions, modification to existing ceiling grid, tile, light fixture relocation and new switching, slavage and reuse of existing selected materials, new millwork, and plumbing and new finishes | Plumbing | $350,000 | — | Finaled Feb 8, 2021 | 201912270782 |
| Dec 2, 2019 | otc alterations permit: 21st floor - #2100 -project involves selective demolition of non-load bearing partition, millwork, plumbing and finishes n/a haher;ab-017 applies. no ceiling work | Plumbing | $13,580 | — | Finaled Aug 24, 2020 | 201911228020 |
| Oct 10, 2019 | otc alterations permit: revise drawings for 2way comm system 3,7,8th fls, & head end on 1st fl. . this permit for increase to battery capacity only | Solar | $2,000 | — | issued | 201910104160 |
| Jul 22, 2019 | otc alterations permit: #1100 - electrical t-24 ref 201902011911 | Electrical | $1 | — | issued | 201907226461 |
| Jul 22, 2019 | otc alterations permit: #1690 - electrical t-24 ref 201903226028 | Electrical | $1 | — | issued | 201907226460 |
| Jun 24, 2019 | otc alterations permit: suite 1650: partial tenant improvement incl demo, partition, ceiling, finishes, electrical, mechanical & plumbing | Plumbing | $650,000 | — | Finaled Oct 16, 2019 | 201904158000 |
| Mar 25, 2019 | otc alterations permit: 8th fl - electrical work for tenant improvement. ref pa 2019-0124-1201 | Electrical | $200,000 | — | Finaled Sep 5, 2019 | 201903215870 |
| Mar 25, 2019 | otc alterations permit: 7th fl - electrical work for tenant improvement. ref pa 2019-0124-1200 | Electrical | $200,000 | — | Finaled Sep 5, 2019 | 201903215869 |
| Jan 8, 2019 | otc alterations permit: basement/lower level parking: addition of heat pump/ exhaust fan/ outside air supply fan. no structural changes. maher n/a | Heating and cooling | $76,836 | — | issued | 201807174701 |
| Sep 19, 2018 | otc alterations permit: 3rd flr. electrical work for tenant improvement. ref pa 201808036455 | Electrical | $15,000 | — | issued | 201809190726 |
| Aug 9, 2018 | otc alterations permit: 1st flr - fire alarm for "the melt" add 4 duct dets. 8 speaker/strobes and 2 strobes ref 201705257666. n/a for maher | Heating and cooling | $12,520 | — | Finaled Sep 19, 2018 | 201807265574 |
| Aug 3, 2018 | otc alterations permit: 7th fl: selective demo of non-bearing partitions, ceilings, millworkl, plumbing and finishes per ab-017. maher na | Plumbing | $95,000 | — | Finaled Nov 1, 2018 | 201807275797 |
| Aug 3, 2018 | otc alterations permit: 8th fl: selective demo of non-bearing partitions, ceilings, millworkl, plumbing and finishes per ab-017. maher na | Plumbing | $95,000 | — | Finaled Nov 1, 2018 | 201807275794 |
| Jul 17, 2018 | otc alterations permit: 3rd fl: selective demo of non-structural bearing restroom partitions, millwork, wall and floor finishes, plumbing fixtures, restroom accessories, light fixtures and light switches | Plumbing | $180,000 | — | Finaled Aug 30, 2018 | 201807053813 |
| Jul 12, 2018 | otc alterations permit: fire sprinklers-relocate 17 pendent sprinklers. replace 11 pendent sprinklers with upright. install 2 sprinklers under ducts. ref pa 2017-0525-7666 | Heating and cooling | $15,000 | — | Finaled Sep 18, 2018 | 201807114254 |
| Jun 22, 2018 | otc alterations permit: fire alarm work for the shower bike storage areas garage level gi additions are 3 duct detectors, 2 speaker strobes 3 strobes. ref 201804055626 | Heating and cooling | $7,750 | — | issued | 201806222637 |
| Jun 22, 2018 | otc alterations permit: fire alarm work the suite 500 heat pump installatoin addition is 1 duct detector | Heating and cooling | $1,585 | — | Finaled Oct 9, 2018 | 201806222635 |
| Jun 1, 2018 | otc alterations permit: suite 500 - modify hvac system to match layout - add 1 heat pump with control for cooling, air balance hvac - outside air quantities & ventilation rates are provided through equip & will remain uncharged as result of work. maher n/a | Heating and cooling | $265,000 | — | issued | 201805310622 |
| Dec 5, 2017 | otc alterations permit: title 24/ electrical only ref pa 2017-0907-7273 | Electrical | $15,000 | — | Finaled Sep 30, 2019 | 201712015217 |
| Nov 15, 2017 | sign - erect: new non electric projecting sign. maher n/a | Electrical | $3,000 | — | Finaled Jan 26, 2018 | 201711133773 |
| Oct 30, 2017 | otc alterations permit: modify hvac system to match new architectural layout. the addition of one vav box with controls. air balance hvac system | Heating and cooling | $29,735 | — | issued | 201710302628 |
| Oct 30, 2017 | otc alterations permit: ste 1190 -modify hvac system to match new architectural layout. the addition of one vav box with controls. air balance hvac system | Heating and cooling | $16,900 | — | Finaled Oct 17, 2019 | 201710302623 |
| Sep 26, 2017 | otc alterations permit: 11/f #1190- relocate demising wall between suite 1100 & 1190 to increase #1190 by approx. 155 sq.ft., selective demo & construct of non-load bearing partitions, new ceiling grid & tiles, new light fixtures & switching, new doors & frames, new millwork, plumbing & finishes. n/a ordinance #155-13 | Plumbing | $228,000 | — | Finaled Oct 17, 2019 | 201709077273 |
| Sep 15, 2017 | otc alterations permit: interior improvements to accomodate a new gr fl quick service restaurant, no seating. scope includes new walls, fixtures, finishes, plumbing. no exterior work. mep and fire under separate permits | Plumbing | $70,000 | — | Finaled Jan 26, 2018 | 201708255970 |
| Sep 6, 2017 | otc alterations permit: 22/f: modify hvac duct distribution to meet new layout; maher ord 155-13 na | Heating and cooling | $12,000 | — | issued | 201708316493 |
| Jun 27, 2017 | otc alterations permit: 2/f, suite 2200: partial floor - selective demo of non-load bearing partitions, millwork, electrical, plumbing and relocation of light fixtures per ab-017; maher ord 155-13 na | Plumbing | $8,700 | — | Finaled Jan 8, 2018 | 201706219990 |
| Apr 20, 2017 | otc alterations permit: selective demo and construction of non-load bearing partitions, relocation of lighting fixtures in existing grid and reswitching existing and new power, new office doors & frames, new millwork and plumbing and new finishes. n/a for maher | Plumbing | $178,752 | — | Finaled Jan 5, 2018 | 201704053296 |
| Mar 31, 2017 | otc alterations permit: 11th flr, suite 1160: selective demo and construction of non load bearing partitions new ceiling grid, tiles, new light fixtures & switching, new office doors & frames. new millwork and plumbing and new finishes. maher na | Plumbing | $129,002 | — | issued | 201703272444 |
| Jan 26, 2017 | otc alterations permit: selective demolition & construction of non-load bearing partitions, modifications to ceiling grid & tiles, new light fixtures & switching, new doors & frames, new millwork & plumbing & new finishes. maher na | Plumbing | $1,100,000 | — | Finaled Nov 27, 2017 | 201611233428 |
| Jun 9, 2016 | sign - erect: install 1 electrical double faced projecting sign | Electrical | $3,000 | — | issued | 201606079272 |
| Feb 3, 2016 | otc alterations permit: demo only on 5th floor, suite 550. this project invloves selective non bearing wall removal, demolish projection screen & wall, millwork, plumbing and finishes per ab-017 | Plumbing | $35,000 | — | Finaled Feb 23, 2016 | 201602038732 |
| Sep 11, 2015 | otc alterations permit: #400- t.i. work, add 2 ton wshp, cw in-row cooling units, reheat vav boxes, cooling only vav boxes and remodel vav boxes, alter existing vav system and hot water & condenser water system. n/a ordinance #155-13 | Heating and cooling | $436,648 | — | Finaled Dec 28, 2015 | 201509096495 |
On Market St
1,600 permits on record on Market St.
| Trade | Permits | Since Oct 5, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 165 | 29 | $20,850 | $4,869–$190,409 | Jun 12, 2026 |
| Heating and cooling | 592 | 51 | $150,000 | $22,660–$1,164,338 | Aug 21, 2026 |
| Electrical | 537 | 51 | $44,000 | $1,000–$800,000 | Aug 17, 2026 |
| Plumbing | 276 | 39 | $150,000 | $1–$2,072,898 | Sep 28, 2026 |
| Solar | 23 | 2 | — | under 5 | Jan 23, 2026 |
| Water heater | 7 | 1 | — | under 5 | May 27, 2026 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 5, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 5, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 5, 2026. Owner names are not shown on any page.