525 Market St, San Francisco
97 home-service permits on record at 525 Market St, San Francisco; the roof was last permitted on Sep 9, 2022 at a declared value of $950,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Feb 26, 2026 | additions alterations or repairs: 30th fl ref pa # 2025-0826-3889: install 1 wall mount speaker strobe, 75 ceilling mount speaker strobes, 1 smoke detector, 2 duct detectors & 2 control relays | Heating and cooling | $79,100 | — | Finaled Apr 29, 2026 | 202512081230 |
| Dec 15, 2025 | otc alterations permit: 34/fl- rework of vavs and low side duct layout to better serve architectural layout upgrade vavs to ddc controls, ref 202511179739 | Heating and cooling | $548,000 | — | Finaled Jun 23, 2026 | 202512121649 |
| Dec 10, 2025 | otc alterations permit: 30th fl ref pa # 2025-0812-2833: install 11 ceiling mount speaker strobes, 6 duct detectors & 1 control relay | Heating and cooling | $27,300 | — | Finaled Apr 14, 2026 | 202512081231 |
| Sep 26, 2025 | otc alterations permit: suite 3000- office ti to include new partitions, offices, conference rooms, mechanical ducting for heating & cooling, lighting & plumbing. structural submittal deferred | Plumbing | $3,889,000 | — | Finaled Sep 11, 2026 | 202508263889 |
| Sep 19, 2025 | otc alterations permit: 17/fl- ti 202506209088- to include mechanical add ddvav box and 2 new inline exhaust. electrical power and lighting.plumbing: applicances | Plumbing | $650,000 | — | Finaled Mar 26, 2026 | 202509084782 |
| Sep 12, 2025 | otc alterations permit: 30th fl- ti includes demo of non strucutral partitions & new structural partitions to create a common corridor. new plumbing fixtures millwork and finishes will be provided throughout the corridor and core restrooms. all new or revised life safety work will be design build and submitted seperately | Plumbing | $750,000 | — | Finaled Sep 11, 2026 | 202508122833 |
| Aug 29, 2025 | otc alterations permit: 17th fl- 10,433 sq ft tenant improvement consists of new partitions, doors, frames, hardware, flooring, ceilings & casework. all mechanical, electrical, plumbing & fire life safety is design build & under separate permit | Plumbing | $2,000,000 | — | Finaled Mar 26, 2026 | 202506209088 |
| Jun 4, 2025 | otc alterations permit: 17f: ti includes non-str partitionsto create a common corridor & demise 2 suites. new plumbing fixtures millwork and finishes throughout corridor & core restrooms. all new or revised life safety work will be design build & submitted separately. mep included | Plumbing | $350,273 | — | Finaled Nov 19, 2025 | 202505277281 |
| Sep 23, 2024 | additions alterations or repairs: 31st flr-install 94 ceiling sp-strobes. install wall sp-strobes. install smoke detectors. install duct detectors. install control ralays. install dual monitor module. install call stations rath 2400-805spm w / mushroom button . ref202405091766, #202406053811,#202204051584 | Heating and cooling | $115,752 | — | Finaled Nov 13, 2024 | 202407247191 |
| Aug 19, 2024 | additions alterations or repairs: 32nd fl: install 85 ceiling speaker strobes, 7 wall speaker strobes, 4 smoke detectors, 4 duct detectors, 6 control relays, 2 call station. arch ref pa# 202405091774. mech ref pa# 202406053819. 2-way ecs ref pa# 202204051584 | Heating and cooling | $60,606 | — | Finaled Nov 13, 2024 | 202407196936 |
| Jul 2, 2024 | additions alterations or repairs: 7/f: fa installation of 1-booster panel, 54-ceiling speaker-strobes, 25-wall mount speaker-strobes, 7- weather proof wall mount speaker-strobes, 9-smoke detectors, 25 duct detectors, 7-control replays, 2-pull stations, and 2-phone jacks, ref ti pa# 202401113849 & mech pa# 202402236430 | Heating and cooling | $167,695 | — | Finaled Sep 17, 2024 | 202405131969 |
| May 14, 2024 | otc alterations permit: lighting for 3rd and 4th floor office ti. electrical work includes new lighting and branch circuiting to existing panel; energy code compliance forms. reference permit 202401184171 | Electrical | $505,000 | — | issued | 202405081722 |
| Apr 12, 2024 | otc alterations permit: t.i. on 28th floors as to add one private office. work includes removal and replacement of ceiling and carpeting and new electrical receptacle in office | Electrical | $128,306 | — | Finaled May 28, 2024 | 202404129854 |
| Mar 1, 2024 | otc alterations permit: 7/f: deferred mep for bpa# 202401113849 to include exhaust fans and ducts | Heating and cooling | $900,000 | — | Finaled Jan 13, 2025 | 202402236430 |
| Mar 1, 2024 | otc alterations permit: revision to pa# 202108116256, sub basement/ basement: to remove partition at storage, new partition at storage, new doors at vestibule, electrical revisions | Electrical | $1,100 | — | issued | 202312182656 |
| Feb 1, 2024 | otc alterations permit: 7th fl.t.i. inc non structural partitions suspended ceilings and drywall ceilings, havac & mech systems plumbing fixtures light fixtures, elec outlets finishes | Plumbing | $12,500,000 | — | Finaled Jan 13, 2025 | 202401113849 |
| Jan 22, 2024 | otc alterations permit: 3rd and 4th fl: full demolition including non structural partitions, suspended ceilings, lighting, plumbing and finishes etc. sprinkler heads will be turned up per 202401164030. mep, sprinklers and fire life safety scope deferred submittal ab-017 | Plumbing | $504,000 | — | Finaled Jun 21, 2024 | 202401184171 |
| Aug 4, 2023 | otc alterations permit: 29th fl - full demo including non structural partitions, suspended ceilings, lighting, plumbing, finishes etc. new and modifications to existing elevator lobby doors to be provided. sprinkler heads will be turned up once acoustical ceiling has been removed | Plumbing | $350,000 | — | Finaled Oct 6, 2023 | 202306029098 |
| Feb 23, 2023 | otc alterations permit: 20/f: fire sprinkler only. change out 8 pendents to upright sprinklers. ref permit 202301311040 | Heating and cooling | $5,000 | — | Finaled Mar 10, 2023 | 202302131840 |
| Sep 29, 2022 | otc alterations permit: 18th flr - interior t.i. including minor alterations to 1 partition, finishes, and power/signal. addition of 1 new heat pump | Heating and cooling | $122,000 | — | Finaled Apr 21, 2023 | 202208050013 |
| Sep 9, 2022 | otc alterations permit: replacement of roofing membrane on the main roof and 39th floor roof | Roofing | $950,000 | — | Finaled Jun 6, 2023 | 202206106093 |
| Aug 30, 2022 | otc alterations permit: 17/f: interior demo including non-structural partitions, suspdned ceiling, lihghitng, plumbing and finishes. f/s under pa 202208231121. maher n/a ab-017 applies | Plumbing | $25,000 | — | Finaled Apr 12, 2023 | 202208291465 |
| Aug 23, 2022 | otc alterations permit: 5/f: title 24 electrical work for t.i. ref pa 202207067816. maher n/a | Electrical | $60,000 | — | Finaled Apr 17, 2023 | 202208231048 |
| Aug 23, 2022 | otc alterations permit: 32/f: title 24 electrical work for t.i. ref pa 202207067812. maher n/a | Electrical | $60,000 | — | Finaled Apr 17, 2023 | 202208231046 |
| May 17, 2022 | otc alterations permit: 27/f: mechanical and electrical work for ti. ref. pa 202102104395 | Electrical | $22,000 | — | Finaled May 31, 2022 | 202108035650 |
| May 17, 2022 | otc alterations permit: mech & electrical work for t.i. on 28th fl. ref pa #202012151053 | Electrical | $22,000 | — | Finaled May 31, 2022 | 202108035641 |
| Apr 26, 2022 | otc alterations permit: 25th & 26th flr: electrical work for tenant improvement. ref pa# 202109108159 & 202109108179 | Electrical | $45,000 | — | issued | 202204182398 |
| Apr 26, 2022 | additions alterations or repairs: fire safety: 2-way communication. 1 rath command center. 1 desk mount subbase station. 1 command center system supervisory , 1 command center system supervisory , 1 power supply backup, 3 ups backup battery modules, 1 relay control card. 1 push button. 1 monitor module | Solar | $60,000 | — | Finaled Jun 9, 2022 | 202204051584 |
| Mar 15, 2022 | otc alterations permit: 25th fl - minor ti to space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit | Electrical | $1,126,600 | — | issued | 202109108179 |
| Mar 15, 2022 | otc alterations permit: 26th fl - minor ti to space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit | Electrical | $1,126,600 | — | issued | 202109108159 |
| Nov 12, 2021 | otc alterations permit: demo only permit: removal of non-loading bearing partitions, selective demo of existing ceiling grid & tile light fixtures, millwork, electrical,plumbing,finishes & office doors | Plumbing | $140,000 | — | Finaled Sep 1, 2022 | 202111102163 |
| Oct 12, 2021 | otc alterations permit: 5th floor: interior demolition of partitions, finishes mechanical, electrical and plumbing. sprinkler permit 202006128622 ab-017 | Plumbing | $50,000 | — | Finaled Mar 23, 2022 | 202109228958 |
| Aug 17, 2021 | otc alterations permit: fire life safety (27th & 28th fl): install ceiling mount speaker strobes, install duct detectors architectural reference ti #: 2021-0210-4395, 2020-1215-1053 | Heating and cooling | $13,200 | — | Finaled Nov 29, 2021 | 202106152491 |
| Dec 30, 2020 | otc alterations permit: 19/f: mechanical & electrical for t.i. ref pa201912270747. maher n/a | Electrical | $35,000 | — | Finaled Feb 12, 2021 | 202009234858 |
| Dec 21, 2020 | otc alterations permit: fire life safety: install smoke detectors w/base, duct detector, pull station, call station. reference ti #2019-1227-0747. mep #2020-0923-4858 | Heating and cooling | $3,300 | — | Finaled Jan 19, 2021 | 202011068419 |
| Dec 3, 2020 | additions alterations or repairs: 23nd floor: t.i on 23nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finishes | Plumbing | $3,513,000 | — | Finaled Feb 24, 2021 | 201912270750 |
| Oct 1, 2020 | additions alterations or repairs: tenant improvement on the 24th fl to include demo, new non load bearing partitions, mech, elec, plumbing, ceiling, lighting, 7 | Plumbing | $3,232,150 | — | Finaled Feb 24, 2021 | 201912270749 |
| Sep 22, 2020 | otc alterations permit: 6/f: fire life safety:-install ceiling mount speaker strobes-install duct detectors-install control relays-install dual module-install call stations-install line fault monitor-install remote controller. ref 202001021138 | Heating and cooling | $25,740 | — | issued | 202006128598 |
| Aug 10, 2020 | otc alterations permit: convert room into mother lactation room, work involves demo of fixtures and wall/door, and new wall and door, new millwork and fixture and new finishes, modifications to electrical, mechanical system and relocation of 1 sink is to be design/build and submitted separately by the g.c. contractors | Electrical | $255,000 | — | Finaled Oct 28, 2020 | 202007079735 |
| Aug 8, 2020 | additions alterations or repairs: 22nd floor: t.i on 22nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finihes | Plumbing | $3,232,150 | — | Finaled Feb 24, 2021 | 201912270746 |
| Feb 5, 2020 | otc alterations permit: 14th fl - ref pa# 202001313219; install control relay, install duct detector with sampling tube | Heating and cooling | $1,320 | — | Finaled Nov 13, 2020 | 202002053543 |
| Jan 31, 2020 | otc alterations permit: add heat pump on the 14th fl. and replace heat pump of 18th fl | Heating and cooling | $45,000 | — | Finaled Nov 24, 2020 | 202001313219 |
| Oct 17, 2019 | otc alterations permit: 2nd floor:fire alarm: install 9 ceiling mount speaker srobes. install 11 smoke detectors w/sampling tube. install 8 duct detectors w/sampling tube. install 1 control relay. install 1 dual monitor modules. install 2 call station. install 1 2way comm line fault monitor | Heating and cooling | $20,460 | — | Finaled Nov 7, 2019 | 201910174706 |
| Sep 17, 2019 | otc alterations permit: 37th fl - full ti demo, new partitions , mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | Plumbing | $1,500,000 | — | Finaled Feb 24, 2021 | 201908239717 |
| Sep 17, 2019 | otc alterations permit: 38th fl - full ti demo, new partitions , mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | Plumbing | $1,500,000 | — | Finaled Feb 24, 2021 | 201908239711 |
| Aug 13, 2019 | otc alterations permit: 28th flr -fls ti - install 28 ceiling mount speaker strobes 2 ceiling mount strobes, 1 smk det w/base 3 duct det, 4 control relays | Heating and cooling | $26,277 | — | Finaled Aug 28, 2019 | 201908138595 |
| Jun 7, 2019 | otc alterations permit: 1st,2nd, & mezz.: demolition of internal elevator shaft and associated equipment. adjacent partitions and electrical components for elevator mezzanine level, elevator hoist room and projecting floor plate | Electrical | $95,000 | — | issued | 201906042456 |
| May 24, 2019 | otc alterations permit: install 23 ceilng mount speakers strobes, 1 ceiling mount strobe, 2 smoke detectors, 10 control relays, 4 dual monitor modules, 10 duct detectors | Heating and cooling | $33,000 | — | Finaled Jun 14, 2019 | 201905241602 |
| May 22, 2019 | otc alterations permit: 14th floor: revision to app#201811196218: structural revision: 1 transformer is being installed & seismically anchored, rather than being suspended as shown previously. additional transformer is being supported on a unistrut frame lines. mep revision:nw heat pump hp14-s is being added | Heating and cooling | $130,000 | — | Finaled Sep 5, 2019 | 201905160802 |
| Feb 12, 2019 | otc alterations permit: t-24 electrical for work under pa #201812067592. 14th fl | Electrical | $1 | — | Finaled Apr 22, 2019 | 201902122729 |
| Jan 8, 2019 | otc alterations permit: 33rd fl - mechanical and electrical for ti. ref pa 2018-1029-4351 | Electrical | $250,000 | — | issued | 201812057510 |
| Nov 28, 2018 | otc alterations permit: demo existing cooling towers and replace with new, demo existing condenser water piping and replace with new | Heating and cooling | $1,500,000 | — | Finaled Oct 8, 2019 | 201810193638 |
| Oct 24, 2018 | otc alterations permit: t-24 electrical for work under pa# 201809079417 | Electrical | $7,500 | — | Finaled Apr 22, 2019 | 201810223817 |
| Oct 1, 2018 | otc alterations permit: 10th floor: fire alarm t.i. to install 46 ceiling speaker strobe, install 2 ceiling mount speakers, install 3 duct detectors, install7 control relay. install 1 line fault monitor, 1 remote touch tone relay controller, 1 call station. ref app#201711073320 | Heating and cooling | $36,600 | — | Finaled Jul 18, 2019 | 201810011865 |
| Sep 17, 2018 | otc alterations permit: 14th fl - new finishes & plumbing fixture at existing men's & women's restrooms to be ada compliant; modifications to lighting & wiring as affected by scope see design building drawings; no exterior work. refer to design build mep drawings for any modifications to sprinkler mep & cliff | Plumbing | $200,000 | — | Finaled Apr 22, 2019 | 201809079417 |
| Jul 17, 2018 | otc alterations permit: demo consists of existing partitions, doors, electrical, plumbing, millwork, and finishes. ab-017. sprinkler plans reference #201807164597 | Plumbing | $5,000 | — | issued | 201807164600 |
| Jun 20, 2018 | otc alterations permit: 25th flr - electrical work for tenant improvement. ref arch #201712075809 | Electrical | $25,000 | — | Finaled Jan 4, 2019 | 201806152031 |
| Jun 7, 2018 | otc alterations permit: fire alarm ti 26th floor full floor 1 ceiling strobe, 48 ceiling speaker strobes, 2 smoke detectors with bases, 3 duct dectectors, 2 control relay, 1 line fault monitor, 1 remote touch tone delay control 1 viking call station | Heating and cooling | $41,000 | — | Finaled Jun 15, 2018 | 201806071191 |
| Jun 7, 2018 | otc alterations permit: fire alarm ti- install 20 ceiling mount speaker strobes; 1 smoke detector with base; 1 duct detector w/sampling tube; 2 control relay modules. ref pa 201712186698- changing the relocation sequence on plans | Heating and cooling | $12,000 | — | Finaled Jun 15, 2018 | 201806071186 |
| Jun 7, 2018 | otc alterations permit: fire alarm ti 25th floor full floor - 1 ceiling strobe, 46 ceiling speaker strobes, 2 smoke detectors w base, 3 duct detectors w sampling tube, 2 control relay modules, 1 line faul monitor 1 remote touch tone relay controller 1 viking call station | Heating and cooling | $35,000 | — | Finaled Jun 15, 2018 | 201806071185 |
| May 29, 2018 | otc alterations permit: 12th floor -fire alarm revisions for ti - install 45 ceiling speaker/strobes, 7 ceiling mounted speakers, 2 smk det w/bases, 6 duct det w/housing, 9 control relay modules, 1 live fault monitor, 1 remote touch tone relay controller, 1 call station ref 201711133804 | Heating and cooling | $38,800 | — | Finaled Jun 21, 2018 | 201805290301 |
| May 23, 2018 | otc alterations permit: 21st flr- fire alarm - install 1 ceiling mount strobe, 40 ceiling mount speaker strobes, 2 smk det w/bases, 1 duct det w/sa,pling tube, 2 control relay modules, 1 line fault monitor, 1 remote touch tone relay controller, 1 call station ref 201801047810 | Heating and cooling | $24,500 | — | Finaled May 25, 2018 | 201805239872 |
| Apr 3, 2018 | otc alterations permit: 26th flr - mechanical & electrical work for ti ref 201712075806 | Electrical | $1,299,407 | — | Finaled May 3, 2019 | 201803284840 |
| Apr 3, 2018 | otc alterations permit: 21st flr - mechanical & electrical work for ti ref 201801047810 | Electrical | $1,140,109 | — | Finaled Jan 4, 2019 | 201803284839 |
| Mar 22, 2018 | otc alterations permit: fire alarm ti - install 1 ceiling mount stroe; 38 ceiling mount speaker strobes; 4 ceiling mount speakers strobes; 3 smoke detectors; 4 duct detectors; 3 control relay modules; 3 monitor modules; 1 line fault monitor; 1 remote relay controller; 1 call station. ref. app# 201710302635 | Heating and cooling | $29,500 | — | Finaled May 7, 2018 | 201803224321 |
| Mar 22, 2018 | otc alterations permit: fire alarm ti install 1 ceiling mount strobe; 54 ceiling mount speaker stroves; 26 smoke detectors; 8 duct detectors; 5 control relay modules; 1 dual monitor module; 1 booster panel; 1 line fault monitor; 1 remote relay controller; 1 call station | Heating and cooling | $50,000 | — | Finaled May 7, 2018 | 201803224320 |
| Feb 9, 2018 | otc alterations permit: 12th floor - full floor t.i. including demo, drywall, ceilings, finishes. electrical, mechanical & plumbing | Plumbing | $3,438,699 | — | Finaled Feb 19, 2019 | 201711133804 |
| Feb 9, 2018 | otc alterations permit: 10/f- full floor t.i. including demo, drywall, ceilings, finishes, electrical, mechanical, plumbing | Plumbing | $3,438,699 | — | Finaled Feb 19, 2019 | 201711073320 |
| Feb 8, 2018 | otc alterations permit: 30th floor: install celing mount strobes, install 6 control relay modules, install 67 ceiling mount speaker strbes, instal 1 breaker panel/power supply, install 6 smoke detectors with base, install 6 duct detectors with sample tube, ref t/i #201710110885 | Heating and cooling | $44,500 | — | Finaled Mar 6, 2018 | 201802080753 |
| Feb 7, 2018 | otc alterations permit: demo, new non-load bearing partitions, mechanical, plumbing, electrical, ceiling & lighting and floor finishes. mep included | Plumbing | $3,500,000 | — | Finaled Dec 24, 2018 | 201710302635 |
| Dec 7, 2017 | otc alterations permit: 19th floor - interior tenant improvement incl demo, drywall, finishes, arch & electrical only. mechanical under sep permit | Electrical | $3,433,800 | — | Finaled Jan 28, 2019 | 201710262313 |
| Oct 10, 2017 | otc alterations permit: 2nd floor -tenant improvement consisting new partitions, new restroom, breaking room, new ceilings, finishes, hvac, plumbing, lighting,power | Heating and cooling | $2,000,000 | — | Finaled Jul 15, 2019 | 201709137877 |
| Jun 15, 2017 | otc alterations permit: installation of an aerosol fire suppression system in the basement electrical switch gear room | Electrical | $80,000 | — | issued | 201706159447 |
| Jun 14, 2017 | otc alterations permit: 37th floor - relocate 19 thermostats/demo 7 exhaust fans with connected thermostat. all vav, air diffusers, and air ducts to be as is. ref pa 2017-0505-5802 | Heating and cooling | $40,000 | — | issued | 201706139277 |
| Jun 6, 2017 | otc alterations permit: 15th fl: hvac modifcations. there will be changes to some vav boxes, duct and thermostat locations based on new architectural floor plan. a new transfer fan will be installed per owner request. ref. pa #201702099029 | Heating and cooling | $30,000 | — | issued | 201706068506 |
| Mar 29, 2017 | otc alterations permit: 9/f: fire alarm tenant improvement: install 47 ceiling mount speakers/ strobes, install 5 duct detectors w/ sampling tubes, install 5 control relays, install 1 booster panel/power supply. ref t.i. pa#201701207573 | Heating and cooling | $35,561 | — | Finaled Jul 7, 2017 | 201703292723 |
| Mar 15, 2017 | otc alterations permit: mechanical and electrical scope. ref 201610311483 | Electrical | $75,000 | — | issued | 201703070881 |
| Feb 7, 2017 | otc alterations permit: 9th floor: including demo and structural, mechanical, plumbing and electrical | Plumbing | $3,100,000 | — | Finaled Jan 12, 2018 | 201701207573 |
| Feb 1, 2017 | otc alterations permit: t.i. from food service to new food service. new food service area, partition walls, casework, interior lighting, plumbing & electrical. food is prepared & packaged off site with no food preparation on site. no exterior work. no change to bldg footprint, area, height, no changes to mech sys | Plumbing | $110,000 | — | Finaled Jun 7, 2017 | 201701267948 |
| Jan 25, 2017 | otc alterations permit: 8th flr: fire alarm ti - install 45 ceiling mount speakers/strobes. 1 smoke detector w/base, 9 duct detectors, 11 control relays ref pa 201610069706 | Heating and cooling | $22,000 | — | Finaled Feb 21, 2017 | 201701257909 |
| Nov 3, 2016 | sign - erect: erect a non-electric wall single faced sign | Electrical | $3,000 | — | issued | 201611031854 |
| Nov 3, 2016 | sign - erect: erect an electric wall single faced sign | Electrical | $4,500 | — | issued | 201611031853 |
| Nov 3, 2016 | sign - erect: erect a non-electric wall single faced sign | Electrical | $3,000 | — | issued | 201611031852 |
| Nov 3, 2016 | sign - erect: erect two identical non-electric wall single faced sign | Electrical | $3,000 | — | issued | 201611031849 |
| Nov 2, 2016 | sign - erect: erect 3 electric single faced wall sign in window | Electrical | $1,500 | — | Finaled Dec 20, 2016 | 201610271249 |
| Nov 2, 2016 | sign - erect: erect 2 electric single faced wall sing in wondow | Electrical | $1,000 | — | Finaled Dec 20, 2016 | 201610271248 |
| Jul 1, 2016 | otc alterations permit: 4th floor: hvac permit:demo and relocate registers and duct work per sheet 4m1. install new duct work and point of connections 4m2.1 ref arch app#201604124506 | Heating and cooling | $26,000 | — | Finaled Sep 6, 2016 | 201606220597 |
| Jun 24, 2016 | otc alterations permit: 4th floor: electrical partial scope of work office tenant retrofit. lighting, power, & signal wiring lighting and recepacle controls. ref arch app#201604124506 | Electrical | $324,000 | — | Finaled Sep 6, 2016 | 201606220592 |
| Apr 1, 2016 | otc alterations permit: 16/f elevator lobby- non structural t.i. on 16/f elevator lobby, new floor, wall, lighting & ceiling finishes, existing lobby doors to remain. revision to pa# 201510220531, electrical under seperate permit | Electrical | $30,000 | — | Finaled May 25, 2016 | 201603081441 |
| Mar 4, 2016 | otc alterations permit: fire alarm tenant improvement. install 46 ceiling mount speaker strobes, 5 speakers, 3 duct detectors with base, 3 control relay modules | Heating and cooling | $22,800 | — | Finaled Mar 16, 2016 | 201603031140 |
| Nov 17, 2015 | otc alterations permit: 16th floor - demo, new drywall, ceilings, arch millwork, mechanical & electrical. sprinklers & life safety separate permit | Electrical | $2,924,400 | — | Finaled Apr 22, 2016 | 201510220531 |
| Nov 12, 2015 | otc alterations permit: mechanical, electrical, plumbing ref 201412093337 lobby and plaza | Plumbing | $800,000 | — | issued | 201510230648 |
| Jun 11, 2015 | otc alterations permit: electrical for tenant improvement reference pa2015.0430.4972 | Electrical | $5,000 | — | Finaled Aug 24, 2015 | 201506118698 |
| Jun 10, 2015 | otc alterations permit: 39th floor: fire alarm t.i. install 43 ceiling mount speaker-strobes, instlal 8 duct detectors, install 3 control relay modules, install 2 smoke detectors, relocate 4 plenum smoke detector. ref. t.i. appl. 2015.0227.9553 | Heating and cooling | $24,000 | — | Finaled Jul 9, 2015 | 201506108658 |
| Mar 18, 2015 | otc alterations permit: 37th floor: mechanical and electrical work for t.i. per app#201502279553 | Electrical | $1 | — | Finaled Nov 13, 2015 | 201503171067 |
| Jan 15, 2015 | otc alterations permit: 15th floor office tenant improvement including addition of new furniture & finish upgrades. automatic sprinkler, fire alarm, hvac under separate permit if applicable | Heating and cooling | $30,417 | — | Finaled Feb 20, 2015 | 201501135572 |
| Jan 15, 2015 | otc alterations permit: 7th floor tenant improvement - modifications include furniture, interior finish upgrades. . automatic sprinkler, fire alarm, hvac under separate permit if applicable | Heating and cooling | $700,000 | — | Finaled Jun 23, 2015 | 201501135569 |
On Market St
1,600 permits on record on Market St.
| Trade | Permits | Since Oct 6, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 165 | 29 | $20,850 | $4,869–$190,409 | Jun 12, 2026 |
| Heating and cooling | 592 | 51 | $150,000 | $22,660–$1,164,338 | Aug 21, 2026 |
| Electrical | 537 | 51 | $44,000 | $1,000–$800,000 | Aug 17, 2026 |
| Plumbing | 276 | 39 | $150,000 | $1–$2,072,898 | Sep 28, 2026 |
| Solar | 23 | 2 | — | under 5 | Jan 23, 2026 |
| Water heater | 7 | 1 | — | under 5 | May 27, 2026 |
Roof replacement cost in San Francisco
Across 5,872 one- and two-family reroof permits since October 6, 2024, most declared values run from $7,655 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,792. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 293 one- and two-family heating and cooling permits since October 6, 2024, most declared values run from $21 to $223,693 (the middle 80%); the median is $25,996 and half fall between $5,000 and $120,000. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 6, 2026. Owner names are not shown on any page.