Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Dec 23, 2015otc alterations permit: comply with nov:201557461 - remodel sfd: reconfigure layout of 1st floor add 2 bedroom 3 full bathrooms and w/d closet/change out windows. upgrade elect & plumb, insulation and dry wall as neededHeating and cooling$160,000—Finaled Feb 15, 2018201510089288

On Middle Point Rd

4 permits on record on Middle Point Rd.

TradePermitsSince Oct 3, 2024Median declaredRangeLast
Roofing20—under 5May 27, 2021
Plumbing10—under 5Oct 2, 2018
Heating and cooling10—under 5Dec 23, 2015

Roof replacement cost in San Francisco

Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. This address is in that cohort. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. This address is in that cohort. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.