Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Apr 7, 2026otc alterations permit: 21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanicalElectrical$55,000—Finaled Sep 3, 2026202603278390
Dec 17, 2024otc alterations permit: 9th fl - title 24 electrical drawings to be added to pa # 202409261737Electrical$90,000—Finaled Jun 23, 2025202412176943
Oct 30, 2024otc alterations permit: 9th fl- commericial ti construct 2 meeting rooms. carpet replacement. light fixture replacement no change in use, occupancy or area, mech & electrical deferredElectrical$150,000—Finaled Jun 23, 2025202409261737
Mar 8, 2024otc alterations permit: 18th fl - mechanical and electrical work for tenant improvement. ref pa 202312142491Electrical$12,000—issued202403077332
Jan 12, 2024otc alterations permit: 16/f- title 24 energy compliant electrical drawings to be added to permit # 202307031371Electrical$11,798—issued202401123861
Aug 16, 2023additions alterations or repairs: basement: replace electric fire pump with same exactElectrical$194,365—issued202306210478
Jul 28, 2023otc alterations permit: 3rd fl, ste 300 title 24 energy compliant. electrical drawings to be added to pa 2023-0515-7738Electrical$100,000—Finaled Sep 15, 2023202307283192
May 16, 2023otc alterations permit: suite 450: electrical / title 24 compliance for tenant improvement to include new power for work stations and offices, new lighting and controls. ref t.i. pa#202303153732Electrical$162,000—issued202305097389
Sep 16, 2022otc alterations permit: suite #1750. title 24 energy compliant electrical drawings to be added to permit #202205204702Electrical$52,000—issued202209162573
Aug 24, 2022otc alterations permit: deferred electrical for architectural permit 202205204702Electrical$52,000—issued202208241139
May 5, 2022otc alterations permit: 10/f suite 1000: mechanical - install new ductwork and hvac equipment. ref ti permit 202203301205Heating and cooling$28,000—Finaled Jan 19, 2023202205043516
Jan 5, 2022otc alterations permit: 12/f: interior t.i. demo and construction of non-structural walls, doors, glazings, electrical, plumbing, finishes, and millwork. restroom upgrade and new shower room. no structural. fire/lifesafety and sprinklers deferredPlumbing$205,104—Finaled May 19, 2022202112083947
Feb 4, 2021otc alterations permit: ti# 2020-0722-0717. modify existing fire alarm sytem. relocate wall speaker/strobes, duct detector, control relay. add wall speaker/strobe, duct detectors, control relays.22nd floorHeating and cooling$16,908—Finaled Jul 20, 2021202012100733
Sep 14, 2020otc alterations permit: partial t.i for 21/f including only mech/elec/plumbing, no structuralPlumbing$1,500,000—Finaled Oct 7, 2021202007160289
Sep 8, 2020otc alterations permit: partial t.i for 20/f including only mech/elec/plumbing, no structuralPlumbing$1,500,000—Finaled Oct 7, 2021202007160293
Mar 12, 2020otc alterations permit: t-24 drawings to go with bldg permit #201912199987 and electrical permit ew202001166062Electrical$4,800—Finaled Nov 9, 2020202003056230
Dec 19, 2019otc alterations permit: suite #200: demo all extg ductboard, demo & relocate extg vav box, install 2 new reheat vav zones and 1 new cooling only vav zone, provide foil faced duct wrap, install 3 new cypress wireless pneumatic t stats for 4 new zones. ref app#201910114239Heating and cooling$120,000—issued201911258069
Dec 6, 2019otc alterations permit: 22nd fl. ref pa 201909091017; modify fire alarm system, add duct detectors, control relays dual input modules, ceiling speaker/strobes, wall speaker/strobes n/a maherHeating and cooling$20,672—Finaled Jun 29, 2021201912068843
Oct 9, 2019otc alterations permit: 22nd fl: modify existing fire alarm system . relocate 1 fire alarm terminal cabinet, 1 booster power supply, add 7 duct detectors, 18 control relays, 9 dual input modulesHeating and cooling$24,919—Finaled Mar 18, 2020201910093961
Sep 16, 2019otc alterations permit: suite 500: demo existing duct & hvac equipment. install new duct & hvac equipment. instlal new piping for re-heat vav's. balance system to valvesHeating and cooling$117,600—Finaled Feb 5, 2020201909161709
Sep 9, 2019otc alterations permit: suite 500: electrical title 24 . ref pa# 201907226480Electrical$95,000—Finaled Jan 15, 2020201909060936
Aug 23, 2019otc alterations permit: 9th flr: add 5, relocate 30, changeout 20 and plug 10 sprinklers to conform with the new wall ceiling layout of the ti job 19-702 maher not reqHeating and cooling$13,875—Finaled Oct 18, 2019201908209348
Aug 16, 2019otc alterations permit: all work on 21st floor: remove unused piping duct, accessories. provide mechanical t.i for 21st floor. 10 existing v.a.v boxes to remain, instlal 2 new v.a.v boxes. install new duct distribution and difusers @ points of connections . ref #201907226482Heating and cooling$80,000—Finaled Jun 17, 2020201908169081
Aug 9, 2019otc alterations permit: 18th fl - provide new 2 way emergency communication system install 1 command center w/battery back up, 1 power suppy, 1 call station, 1 fire alarm duel monitor moduleSolar$13,762—Finaled Dec 5, 2019201908098373
Jul 15, 2019otc alterations permit: 22nd floor - suite 2200 & roof: revision to app#201905312097 and original permit application 201812047374. addition of new hvac unit to the rooftop for future t.i. n/a for maherHeating and cooling$10,000—Finaled Jul 2, 2020201907125737
Jun 24, 2019otc alterations permit: revision to pa 2018-1204-7374, locating hvac units on the roof with new structural steel openings, roof patching, revised smoke control narrative, completion of base building 2 hr rated mechanical room on 22nd flrHeating and cooling$45,000—Finaled Jun 17, 2020201905312097
Jun 19, 2019otc alterations permit: 2nd & 7th floor: electrical- new power and lightingref pa 2019-0115-0376 and 2018-1217-8470Electrical$1—Finaled Jan 15, 2020201906173566
May 15, 2019otc alterations permit: 4th fl - mechanical new vavs a lowside duct. ref pa 201902062192Heating and cooling$60,000—Finaled Sep 20, 2019201905100289
May 6, 2019otc alterations permit: electrical- new lighting, suite 400Electrical$90,000—Finaled Sep 20, 2019201905069773
Mar 11, 2019otc alterations permit: ste 201 - electrical - power lighting & signal. ref pa 2019-0115-0382Electrical$1—issued201903114843
Mar 11, 2019otc alterations permit: 18th fl - electrical power, lighting & signalElectrical$1—issued201903114841
Feb 14, 2019otc alterations permit: 17th floor: fire sprinkler mod: add 17 heads, relocate 32 heads, replace 13 sprinklers. ref t.i. pa201812319371. maher n/aHeating and cooling$28,704—Finaled Mar 21, 2019201902142903
Jan 18, 2019otc alterations permit: 17/f: tile 24 mep: to demo and install new mechanical and plumbing systems and power -lighting. ref t.i. pa#201812319371. maher n/aPlumbing$205,000—Finaled Jun 10, 2019201901170646
Jan 9, 2019otc alterations permit: 17th floor: electrical new lighting and controls for restrooms, relocate receptacles in restrooms. ref app#201810314653. n/a for maherElectrical$26,000—Finaled Jun 10, 2019201901099942
Dec 13, 2018otc alterations permit: 17th flr, demo only. demo of non-structural partitions, doors, millwork and plumbing fixtures, ab.017Plumbing$10,000—Finaled Jun 10, 2019201812117960
Oct 9, 2018otc alterations permit: 5/f -interior demo to include walls and plumbing. sprinkler work under seperate permit. separate ti permit. ab-017 applies. space to remain vacant until all accessible features are restored. n/a for maherPlumbing$35,000—Finaled Apr 2, 2019201810021999
Aug 29, 2018otc alterations permit: demolish existing exhaust fan & install 12" csd equipment room, install new daikin enfinity water sourc heat pump & connect to existing duct work, install new condenser supply/return lines from existing risers, route condensate drain to nearby sink tailpiece w/condensate pumpHeating and cooling$28,000—Finaled Oct 19, 2018201808298658
May 7, 2018otc alterations permit: suite #2050: mechanical and electrical work for ti. rework ductwork and rebalance. install new exhaust fans. ref pa #201803133502. maher naElectrical$90,000—Finaled Sep 6, 2018201804267455
Nov 15, 2017otc alterations permit: 3/f: electrical upgrades to existing office space. title 24 complianceElectrical$70,000—issued201711133851
Oct 4, 2017otc alterations permit: 19th fl - mechanical and electrical for pa 2017-0912-7687. n/a for maherElectrical$123,080—Finaled Feb 26, 2018201709299906
Oct 4, 2017otc alterations permit: 5th fl - mechanical and electrical for pa 2017-0712-1657. n/a for maherElectrical$149,250—Finaled Feb 26, 2018201709299905
Aug 29, 2017otc alterations permit: #800 8/f- minor renovations to existing tenant space. #920 9/f- full tenant fit-out including demo interior walls, plumbing and millwork. new interior walls, doors, new finishes and furniture. n/a ordinance #155-13Plumbing$850,000—issued201708144724
Apr 4, 2017otc alterations permit: revision to 201703030592 including minor revisions to partitions, millwork, electrical, rcp and finishesElectrical$1—issued201704043158
Dec 29, 2016otc alterations permit: install lowside duct to secure tenant space. partial scope office tenant retrofit, lighting, power and signnal wiring, lighting, receptacle controls. reference 201611142513; n/a maherHeating and cooling$110,000—Finaled May 8, 2017201612286091
Aug 12, 2016otc alterations permit: suite 200: reballasting light fixture, minor electrical and installation of new water source heat pump to cool it closet, electrical to card reader access. modify existing hvac to accommodate new buildout. ref pa 201606089380Heating and cooling$1—Finaled May 25, 2017201607071740
Mar 18, 2016otc alterations permit: 8th floor electrical upgrades at corridor and lobby ref pa 2015-1104-1657. maher naElectrical$22,000—issued201603031101
Feb 24, 2016otc alterations permit: 8th flr -modification of fire alarm sys.add duct smoke dectector, control relay for fsd shutdown, dual input monitor module for fsd end switch monitoring, smoke detector in idf room, wall mounted speaker/strobes, ceiling mounted speaker/strobes, ceiling mounted strobesHeating and cooling$9,900—Finaled Jul 23, 2016201602240355
Feb 4, 2016otc alterations permit: #740- office improvement with new galravized duct work, electrical upgrades. ref. to pa#201511233307. n/a ordinance #155-13Heating and cooling$180,000—Finaled Mar 23, 2017201602048820
Feb 4, 2016otc alterations permit: 7/f corridor and lobby- minor electrical upgrades in corridor and lobby. ref. to pa#201511041655. n/a ordinance #155-13Electrical$95,000—Finaled Mar 23, 2017201602048818
Feb 3, 2016otc alterations permit: 8th floor:ti with demolition, new walls, millwork, ceiling, electrical, plumbing and hvac. maher naHeating and cooling$70,000—Finaled Mar 23, 2017201512084403
Dec 11, 2015otc alterations permit: 9th fl: mech and electrical for 201510301215, suite 920Electrical$210,000—Finaled Mar 23, 2017201512104768
Dec 11, 2015otc alterations permit: 9th flr: electrical for 201507282672 elevator lobby and corridorElectrical$21,330—Finaled Mar 23, 2017201512104761
Dec 7, 2015otc alterations permit: 9th floor elevator lobby and corridor improvements. include finishes. all new or revised hvac, electrical, plumbing and life safety work will be design build and submitted separately. bldg is fully sprinklered. maher n/aHeating and cooling$166,000—Finaled Mar 23, 2017201507282672
Oct 23, 2015otc alterations permit: mechanical and electrical for 201509298289. 4/fElectrical$110,000—Finaled May 26, 2016201510230617
Oct 23, 2015otc alterations permit: 4th flr: interior tenant improvement demo and build back, all hvac, electrical, plumbing, ls and sp under separate permit maher n/aHeating and cooling$350,000—Finaled May 26, 2016201509298289
Mar 31, 2015otc alterations permit: 4th flr, ste 400: t.i. include the demo of non-structural partitions, all or revised hvac, electrical, plumbing and life safety work will be under separate permit, building fully sprinklered; maher n/aHeating and cooling$126,161—issued201503049962

On Mission St

1,222 permits on record on Mission St.

TradePermitsSince Oct 4, 2024Median declaredRangeLast
Roofing29152$19,800$5,000–$47,200Sep 30, 2026
Heating and cooling41334$59,458$1,045–$1,040,000Sep 16, 2026
Electrical32448$45,125$1–$271,641Sep 24, 2026
Plumbing16627$176,752$12,300–$2,079,600Sep 2, 2026
Water heater166$36,500$5,000–$471,400Mar 2, 2026
Solar121—under 5Jan 15, 2025

Roof replacement cost in San Francisco

Across 5,889 one- and two-family reroof permits since October 4, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,760. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 4, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 4, 2026. Owner names are not shown on any page.