415 Mission St, San Francisco
114 home-service permits on record at 415 Mission St, San Francisco; the roof was last permitted on Jan 9, 2019 at a declared value of $15,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| May 19, 2026 | otc alterations permit: 50th fl - electrical & office retrofit lighting fixtures & associated circuiting/controls, power & signal devices & associated wiring; mechanical: demo & revise existing ductwork & under floor diffusers to accommodate new floor plan layout. furnish & install new duct & diffusers ref pa 202508294227 | Heating and cooling | $250,000 | — | Finaled Jul 17, 2026 | 202603278403 |
| Nov 12, 2025 | otc alterations permit: 50/f: commercial tenant improvement including new load bearing partition doors, ceilings, lighting and finishes. mep deferred for new mechanical, electrical and plumbing work | Plumbing | $2,382,902 | — | Finaled Jul 17, 2026 | 202508294227 |
| Apr 29, 2025 | otc alterations permit: 11th fl: new multi-faith room. new finishes, mechanical & electrical | Electrical | $243,000 | — | Finaled Jun 17, 2025 | 202504174648 |
| Aug 9, 2024 | otc alterations permit: 34th floor: modification to existing mechanical and electrical. relocate ducts and modify lightin. ref pa#202401023324 | Heating and cooling | $45,000 | — | issued | 202408088259 |
| Jul 22, 2024 | otc alterations permit: 4/f: conversion of an it provisioning room into bt lab work room. relocation of selective furniture, selective relocation of lighting fixtures, upgrades of partitions to the 1hr fire rating and door replacement, minor structural and hvac work included. no chang of occupant load or egress | Heating and cooling | $1,350,000 | — | Finaled Jan 23, 2025 | 202404220495 |
| Jun 27, 2024 | otc alterations permit: fire only: work for the "go center" mechanical system relocations on floor 5: additions are 1 smoke detector, 4 duct detectors, and 5 modules. ref permit bpa# 2023-0824-5117. 5/f | Heating and cooling | $13,870 | — | Finaled Jul 30, 2024 | 202406275353 |
| Jun 25, 2024 | otc alterations permit: 34th fl - fire only for accenture remodel areas; additions are 2 duct detectors, 4 modules, 1 speaker/strobe and the relocation of 3 speaker/strobes. ref pa 202310118444 | Heating and cooling | $10,740 | — | issued | 202406255154 |
| Apr 17, 2024 | otc alterations permit: reference to architectural permit #2024-0221-6253; deferred mechaical and electrical scope that includes lighting low voltage and transfer duct work | Heating and cooling | $100,000 | — | Finaled Sep 25, 2024 | 202404109728 |
| Feb 29, 2024 | otc alterations permit: re-fit of the mep systems on level 5 to provide 24/7 cooling and ventilation to a "go center" new rearranged electrical circuits | Electrical | $400,000 | — | Finaled Aug 5, 2024 | 202308245117 |
| Feb 1, 2024 | otc alterations permit: 34/f: revision to approved architectural and mep set pa# 202310118444 and 202401023324. new non-load bearing, electrical, ceiling, lighting, floor finishes and furnishings | Electrical | $1 | — | issued | 202401315007 |
| May 21, 2021 | otc alterations permit: installation of ul 300 hood and duct fire system piranha system | Heating and cooling | $12,000 | — | Finaled Jul 12, 2021 | 202104208988 |
| Apr 19, 2021 | otc alterations permit: fire only work for the "dumbwaiter" area on level 1 and parking level 1; additions are 1 duct detector, 2 modules, and 2 speaker/strobes | Heating and cooling | $3,850 | — | Finaled Jun 11, 2021 | 202104158696 |
| Dec 9, 2020 | otc alterations permit: update plumbing documents per discussions with city plumbing department and on-site conditions. ref pa # 201802050382. permit revision # 3 submission | Plumbing | $1 | — | Finaled Jan 24, 2022 | 202010227179 |
| Jun 24, 2020 | otc alterations permit: revision to pa #201806252845, 37th fl card reader at scrubber; 38th fl wellness redesigned to office; partitions and ceilings, installation of card readers, duct rerouting and electrical/lighting reconfiguration. maher na | Heating and cooling | $476,032 | — | Finaled Sep 28, 2021 | 202002184644 |
| Jan 9, 2020 | otc alterations permit: 45th fl - fire alarm work for the "salesforce" remodel. additions are 2 smoke detectors, 6 duct detectors, 5 modules, 1 strobe power supply, and 17 speaker/strobes. ref pa 2019-0718-6243 | Heating and cooling | $25,160 | — | issued | 202001081402 |
| Nov 25, 2019 | otc alterations permit: 37th fl - fire alarm work for "wework" phase 2 remodel. additions are 2 beam detectors, 10 duct detectors, 7 modules, and 16 speaker/strobes. ref pa 2018-0612-1688 | Heating and cooling | $30,200 | — | Finaled Apr 27, 2021 | 201911258049 |
| Nov 25, 2019 | otc alterations permit: 38th fl - fire alarm work for the "we work" phase 2 remodl. additions are 1 beam detector, 4 smoke detectors, 5 duct detectors, 18 modules, and 4 speaker/strobes. ref pa 2018-0612-1688 | Heating and cooling | $22,600 | — | issued | 201911258048 |
| Nov 22, 2019 | otc alterations permit: fire alarm work for the "wework" remodel on floor 36; additions are 1 smoke detector, 8 duct detectors, 9 modules, and 8 speaker/strobes. ref pa #201806121688 | Heating and cooling | $22,390 | — | Finaled Apr 27, 2021 | 201911227948 |
| Nov 21, 2019 | otc alterations permit: 51st fl - fire alarm for the "scotiabank" remodel; additions are 2 smoke detectors, 3 duct detecotrs, 10 modules and 18 speaker/strobes. ref pa 2019-0124-4198 | Heating and cooling | $22,455 | — | Finaled Feb 1, 2020 | 201911217827 |
| Nov 6, 2019 | otc alterations permit: revision to 201901231054, 201903044294 minor changes to e office space 52-54. includes mechanical/electrical plans | Electrical | $30,000 | — | Finaled Apr 13, 2021 | 201909161757 |
| Nov 6, 2019 | otc alterations permit: revision to 201809119776: minor changes to existing office space. finishes, lighting, elevator lobby includes mechanical/electrical plans | Electrical | $50,000 | — | Finaled Apr 13, 2021 | 201909161754 |
| Nov 1, 2019 | otc alterations permit: demo repair access door and ceiling. plumbing shutoff valve, elec leak sensor sep permit | Plumbing | $3,000 | — | Finaled Nov 26, 2019 | 201911016268 |
| Aug 8, 2019 | otc alterations permit: 45th flr - interior ti for single tenant. non load nearing partitions, suspended systems, floor and wall finishes, casework, hvac, ele and plm | Heating and cooling | $900,000 | — | Finaled Mar 3, 2021 | 201907186243 |
| Jul 5, 2019 | otc alterations permit: fire alarm work for the "salesforce" remodel on floor 44; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 2 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150410 | Heating and cooling | $54,850 | — | Finaled Sep 4, 2019 | 201907055146 |
| Jul 5, 2019 | otc alterations permit: fire alarm work for the "salesforce" remodel on floor 43; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 5 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150409 | Heating and cooling | $56,350 | — | Finaled Sep 4, 2019 | 201907055145 |
| Jul 5, 2019 | otc alterations permit: fire alarm work for the "salesforce" remodel on floor 42; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 3 modules, 11 speakers, and 47 speaker/strobes. ref pa #201901150407 | Heating and cooling | $55,350 | — | Finaled Sep 3, 2019 | 201907055142 |
| Jun 17, 2019 | otc alterations permit: 41st fl - fire alarm for the "salesforce" remodel. additions are 2 smoke detectors, 2 modules, 9 duct detectors, 1 strobe power supply, 11 speakers and 47 speaker/strobes. ref pa 2018-1030-4544 | Heating and cooling | $54,800 | — | Finaled Jul 31, 2019 | 201906173511 |
| Jun 17, 2019 | otc alterations permit: 40th fl - fire alarm work for the "salesforce". additions are 2 smoke detectors, 9 duct detectors, 5 modules, 1 strobe power supply, 11 speakers and 49 speaker/strobes. ref pa 2018-1030-4546 | Heating and cooling | $57,600 | — | Finaled Jul 31, 2019 | 201906173509 |
| Jun 17, 2019 | otc alterations permit: fire alarm work for the "salesforce" remodel on floor 39; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 2 modules, 11 speakers, and 47 speaker/strobes. ref pa #201810304547. maher na | Heating and cooling | $54,800 | — | Finaled Jul 31, 2019 | 201906133287 |
| May 24, 2019 | otc alterations permit: 2nd fl - transbay tower mechanical & electrical. install 3 new 4 pipe fan coil units. install low pr3essure duct work & hydronic piping. new lighting, power & signal. ref pa 2019-0108-9852 | Heating and cooling | $200,000 | — | issued | 201905150682 |
| Mar 21, 2019 | otc alterations permit: fire alarm work for the "salesforce" remodel fl 30; additions are 2 smoke detectors, 9 duct detectors, 3 modules, 11 speakers, 45 speakers/strobes, and 1 strobe power supply. ref pa #201808278404. maher na | Heating and cooling | $54,100 | — | Finaled Apr 15, 2019 | 201903205732 |
| Mar 21, 2019 | otc alterations permit: 29/f: fire alarm work for the "salesforce" remodel; additions are 2 smoke detectors, 9 duct detectors, 5 modules, 11 speakers, 46 speaker/strobes, and 1 strobe power supply. ref pa #201808278406. maher na | Heating and cooling | $55,720 | — | Finaled Apr 15, 2019 | 201903205729 |
| Mar 21, 2019 | otc alterations permit: 28/f:fire alarm work for the "salesforce" remodel.; additions are 2 smke detectors, 9 duct detectors, 3 modules, 11 speakers, 45 speaker/strobes, and 1 strobe power supply. ref pa #20180278400. maher na | Heating and cooling | $54,100 | — | Finaled Apr 15, 2019 | 201903205728 |
| Mar 19, 2019 | otc alterations permit: 54th fl - fire alarm work for the "covington" remodel; additions are 5 smoke detectors, 13 duct detectors, 8 modules, 35 speakers and 45 speaker/strobes and 6 strobes. ref pa 2018-0911-9778 | Heating and cooling | $80,500 | — | Finaled Aug 16, 2019 | 201903185450 |
| Mar 19, 2019 | otc alterations permit: 53rd fl - fire alarm work for the "covington" remodel; additions are 16 smoke detectors, 13 duct detectors, 36 modules, 34 speakers and 43 speaker/strobes and 6 strobes. ref pa 2018-0911-9774 | Heating and cooling | $100,800 | — | Finaled Aug 16, 2019 | 201903185449 |
| Mar 18, 2019 | otc alterations permit: 52nd fl - fire alarm work for the "covington" remodel; additions are 3 smoke detectors, 9 duct detectors, 10 modules, 51 speakers and 41 speaker/strobes and 6 strobes. ref pa 2018-0911-9775 | Heating and cooling | $79,300 | — | Finaled Aug 16, 2019 | 201903185447 |
| Mar 18, 2019 | otc alterations permit: 51st fl - fire alarm work for the "covington" remodel; additions are 2 smoke detectors, 6 duct detectors, 2 modules, 29 speakers and 13 speaker/strobes. ref pa 2018-0911-9776 | Heating and cooling | $40,960 | — | Finaled Aug 16, 2019 | 201903185446 |
| Feb 20, 2019 | otc alterations permit: defferred plumbing drawing for 51st, 52nd, 53rd, 54th. pa#201809119775 , 201809119776 . 201809119788 , 201809119774 maher n/a | Plumbing | $1 | — | Finaled Apr 13, 2021 | 201902193210 |
| Feb 11, 2019 | otc alterations permit: fire alarm work for "starbucks" remodel on floor 5, additions are 5 duct detectors, 4 modules, 10 speaker strobes. ref#201804136284. n/a for maher | Heating and cooling | $16,270 | — | Finaled Aug 16, 2019 | 201902112541 |
| Feb 11, 2019 | otc alterations permit: fire alarm as built for "mcdermott, will, emery" remodel to reflect a duct detector relocation per sffd testing inspector. ref#201807275795 n/a for maher | Heating and cooling | $1 | — | Finaled Feb 12, 2019 | 201902112540 |
| Jan 9, 2019 | otc alterations permit: furnish and install 1 ansul r102 fire system in main kitchen area 61st fl. 1 ansul r102 system in the pollution control unit on the 64th fl roof. ref pa 2018-0416-6394 | Roofing | $15,000 | — | issued | 201901099875 |
| Dec 26, 2018 | otc alterations permit: 25th flr - "salesforce" add 2 smk det. 9 duct det, 3 modules, 1 strobe power supply, 11 speakers and 47 speaker/strobes amher na ref 201807174764 | Heating and cooling | $55,400 | — | Finaled Aug 16, 2019 | 201812249065 |
| Dec 26, 2018 | otc alterations permit: 26th flr - "salesforce" add 2 smk det. 9 duct det, 3 modules, 1 strobe power supply, 11 speakers and 45 speaker/strobes amher na ref 201807174765 | Heating and cooling | $54,100 | — | Finaled Aug 20, 2019 | 201812249064 |
| Dec 26, 2018 | otc alterations permit: 27th flr - "salesforce" add 2 smk det. 9 duct det, 3 modules, 1 strobe power supply, 11 speakers and 48 speaker/strobes amher na ref 201807174766 | Heating and cooling | $56,100 | — | Finaled Aug 20, 2019 | 201812249063 |
| Dec 19, 2018 | otc alterations permit: 57th fl - fire alarm work for the permit #2 of the "hellman & friedman" remodel; additions are 4 duct detectors and 9 relay modules for new fan installations and fsd relocations per the latest mechanical revisions. ref pa 2018-0530-0420 | Heating and cooling | $11,300 | — | Finaled Jul 22, 2022 | 201812198693 |
| Dec 10, 2018 | otc alterations permit: fire alarm work mcdermott, will, emery remodel on floor 56, additions are 3 smoke detectors, 20 duct detectors, 3 modules, 49 speakers, 27 speaker strobes 6 strobes ref#201807275795 | Heating and cooling | $87,000 | — | issued | 201812107834 |
| Nov 26, 2018 | otc alterations permit: fire alarm - spec suite floor 55 - add 1 smk det, 4 duct dets, 2 modules, 1 strobe power supply, 4 speakers, 25 speaker/strobes ref 201805088456 maher na | Heating and cooling | $27,940 | — | issued | 201811266615 |
| Nov 16, 2018 | otc alterations permit: 55th floor - mechanical & plumbing for tenant improvement. ref pa201805088456 | Plumbing | $8,000 | — | expired | 201811054977 |
| Nov 16, 2018 | otc alterations permit: 39th fl: single tenant improvement to entire floor: new access flooring partitions, mechanical, electrical/telecom, ceiling & lighting. new social lounge/employee cafeteria w/limited prep. fire alarm & sprinklers under sep permit. maher na | Electrical | $2,500,000 | — | Finaled May 29, 2020 | 201810304547 |
| Nov 16, 2018 | otc alterations permit: 40th fl: single tenant improvement to entire floor: new access flooring partitions, mechanical, electrical/telecom, ceiling & lighting. new social lounge/employee cafeteria w/limited prep. fire alarm & sprinklers under sep permit. maher na | Electrical | $2,750,000 | — | Finaled May 29, 2020 | 201810304546 |
| Nov 16, 2018 | otc alterations permit: 41st fl: single tenant improvement to entire floor: new access flooring partitions, mechanical, electrical/telecom, ceiling & lighting. new social lounge/employee cafeteria w/limited prep. fire alarm & sprinklers under sep permit. maher na | Electrical | $2,500,000 | — | Finaled May 29, 2020 | 201810304544 |
| Nov 6, 2018 | otc alterations permit: 58th - fire alarm add 5 smk det, 10 duct det, 1 strobe power supply, 8 modules, 20 speakers, 37 speaker/strobes and 2 strobe ref 201805300425 maher na | Heating and cooling | $61,800 | — | Finaled Dec 31, 2018 | 201811054930 |
| Nov 6, 2018 | otc alterations permit: 57th - fire alarm add 6 smk det, 10 duct det, 1 streob power supply, 10 modules, 26 speakers, 42 speaker/strobes and 1 strobe ref 201805300420 maher na | Heating and cooling | $69,850 | — | Finaled Dec 31, 2018 | 201811054927 |
| Nov 2, 2018 | otc alterations permit: 37th floor: revision to app#201805088541 adjust branch ducts, diffusers change fsd's to sd's. relabel equipment to align with/schedules. n/a for maher | Heating and cooling | $1 | — | expired | 201811014759 |
| Nov 2, 2018 | otc alterations permit: 38th floor: revision to app#201804247247 adjust branch ducts, diffusers change fsd's to sd's. relabel equipment to align with/schedules. n/a for maher. fire under separate permit | Heating and cooling | $1 | — | expired | 201811014758 |
| Nov 2, 2018 | otc alterations permit: 36th floor: revision to app#201805088538 adjust branch ducts, diffusers change fsd's to sd's. relabel equipment to align with/schedules. n/a for maher | Heating and cooling | $1 | — | expired | 201811014753 |
| Oct 30, 2018 | otc alterations permit: fire alarm work for the "salesforce" remodel on floor 22; additions are 2 smoke detectors, 9 duct detectors, 2 modules, 1 strobe power supply, 11 speakers & 45 speaker/strobes. ref pa #201804237105. maher na | Heating and cooling | $53,620 | — | Finaled Dec 3, 2018 | 201810304459 |
| Oct 30, 2018 | otc alterations permit: fire alarm work for the "salesforce" remodel on floor 23; additions are 2 smoke detectors, 9 duct detectors, 4 modules, 1 strobe power supply, 11 speakers & 46 speaker/strobes. ref pa #201804237098. maher na | Heating and cooling | $55,250 | — | Finaled Dec 3, 2018 | 201810304457 |
| Oct 30, 2018 | otc alterations permit: fire alarm work for the "sales force" remodel on floor 24; additions are 2 smoke detectors, 9 duct detectors, 2 modules, 1 strobe power supply, 11 speakers & 45 speaker/strobes. ref pa #201804237104. maher na | Heating and cooling | $53,620 | — | Finaled Aug 16, 2019 | 201810304456 |
| Sep 24, 2018 | otc alterations permit: 38th flr - fire alarm for "wework" add 3 smk det, 9 duct det, 1 strobe power supply, 6 modules, 3 speakers, 35 speaker/strobes and 7 strobes ref 201801108256 maher na | Heating and cooling | $48,670 | — | Finaled Nov 6, 2018 | 201808318847 |
| Sep 24, 2018 | otc alterations permit: 37th flr - fire alarm for "wework" add 3 smk det, 9 duct det, 1 strobe power supply, 6 modules, 2 speakers, 66 speaker/strobes and 7 strobes ref 201801108255. mechanincal 2018.05088538 maher na | Heating and cooling | $67,680 | — | Finaled Nov 6, 2018 | 201808318846 |
| Sep 24, 2018 | otc alterations permit: 36th flr - fire alarm for "wework" add 3 smk det, 20 duct det, 1 strobe power supply, 11 modules, 5 speakers, 36 speaker/strobes and 8 strobes ref 201712217133. mechanical 201808288551. maher na | Heating and cooling | $71,150 | — | Finaled Nov 6, 2018 | 201808318845 |
| Sep 18, 2018 | otc alterations permit: 21st flr - fire alarm work for the "saleforce" remodel. add 3 smk det, 9 duct dets, 3 modules, 1 strobe power supply, 11 speakers and 44 speaker/strobes maher na ref#201802201721 | Heating and cooling | $54,120 | — | Finaled May 24, 2021 | 201809180552 |
| Sep 18, 2018 | otc alterations permit: 20th floor - fire alarm work for the "salesforce" remodel. add 2 smk det, 9 duct dets, 1 strobe power supply, 5 modules, 11 speaker and 45 speaker/strobes ref pa# 201802201720 n/a for maher | Heating and cooling | $55,120 | — | Finaled Aug 16, 2019 | 201809170397 |
| Sep 18, 2018 | otc alterations permit: 19 floor - fire alarm work for the "salesforce" remodel; additions are smoke detectors, duct detectors, strobe power supply, modules, speakers, and speaker/strobes. ref#201802201719. n/a for maher | Heating and cooling | $54,120 | — | Finaled Oct 30, 2018 | 201809140148 |
| Sep 14, 2018 | otc alterations permit: 50th floor: fire alarm work for the vlocity partial floor removal. addtiions are the 3 smoke detectors, 3 duct detectors, 3 speakers, 21 speaker/strobes, and 1 strobe power supply. ref app#201804307753. n/a for maher | Heating and cooling | $23,450 | — | Finaled Sep 18, 2018 | 201809130080 |
| Sep 14, 2018 | otc alterations permit: 60th fl - fire alarm work for the "salesforce" remodel on floor 60; additions are 16 smoke detectors, 14 duct detectors, 4 modules, 8 speakers and 27 speaker/strobes. ref pa 2017-1219-6849. maher na | Heating and cooling | $56,520 | — | Finaled Sep 25, 2018 | 201809119627 |
| Sep 12, 2018 | otc alterations permit: 55th fl - electrical work for ti lighting, power and signal, wiring, lighting controls. ref pa 2018-0508-8456 | Electrical | $40,000 | — | expired | 201808278383 |
| Sep 12, 2018 | otc alterations permit: 50th fl - electrical work for ti lighting power and signal, wiring, lighting and controls. plumbing work. ref pa 2018-0430-7753 | Plumbing | $40,000 | — | expired | 201808278382 |
| Sep 11, 2018 | otc alterations permit: 61st fl - fire alarm work for the "salesforce" remodel on floor 61; additions are 4 smoke detectors, 31 duct detectors, 15 modules, 6 speakers. and 28 speaker/strobes. ref pa 2017-1219-6851. maher na | Heating and cooling | $80,720 | — | Finaled Sep 21, 2018 | 201809119624 |
| Aug 10, 2018 | otc alterations permit: bring electrical power from main level up to level 5 for future tenants. install transformer | Electrical | $75,000 | — | issued | 201808106999 |
| Aug 10, 2018 | otc alterations permit: 33rd fl - fire alarm work for the "accenture" remodel on floor 33 including work at the fire shutter on floor 34 and 35 tenant stairwell; additions are 36 smoke detectors, 22 duct detectros, 1 strobe power supply, 60 modles, 51 speaker/strobes and 2 speakers & 1 beam detector. ref pa 2017-1102-2971 | Heating and cooling | $126,900 | — | Finaled Dec 12, 2018 | 201808106981 |
| Aug 7, 2018 | otc alterations permit: floor 3 - fire alarm work for the "salesforce" phase 3 remodel on fl.3, additions are 33 smoke detectors, 30 duct detectors, 1 strobe power supply, 83 modules, 4 speakers, and 38 speaker /strobes | Heating and cooling | $138,260 | — | Finaled Apr 30, 2019 | 201808076569 |
| Aug 1, 2018 | otc alterations permit: 1st flr - "front lobby entrance" add 8 smk det, 11 duct det, 5 speajer/strobes maher na | Heating and cooling | $25,670 | — | Finaled Sep 18, 2018 | 201808016075 |
| Jul 31, 2018 | otc alterations permit: 32nd flr - fire alarm work "accenture" remodel. add 3 smk dets, 12 duct dets, 13 modules, 1 strobe power supply, 16 speakers and 59 speaker/strobes ref 201809259414. n/a for maher | Heating and cooling | $77,050 | — | Finaled Dec 11, 2018 | 201807315962 |
| Jul 31, 2018 | otc alterations permit: 31st flr - fire alarm work "accenture" remodel. add 3 smk dets, 9 duct dets, 10 modules, 1 strobe power supply, 17 speakers and 61 speaker/strobes ref 201709259412. n/a for maher | Heating and cooling | $72,625 | — | Finaled Dec 11, 2018 | 201807315960 |
| Jul 25, 2018 | otc alterations permit: fire alarm work for the prime remodel on floor 59. additoins are 11 smoke detectors, 15 duct detectors, 25 modules, 1 strobe power supply, 4 speakers, 45 speaker/strobes, 3 strobes. under separate appl.-smoke det under raised flr and access panels required for 2 uft units located under raised flr | Heating and cooling | $78,170 | — | issued | 201807255460 |
| Jul 20, 2018 | otc alterations permit: 55th floor fire alarm work for the mubalda partial area remodel., additions are 1 smoke detector, 6 duct detectors, 19 speaker strobes, and 6 speakers | Heating and cooling | $26,020 | — | Finaled Aug 22, 2018 | 201807194908 |
| Jul 17, 2018 | otc alterations permit: 59th fl - revision to pa 2018-0222-1805 to add conference room to previously approved scope of work including addition of a new operable partition and mechanical/electrical changed | Electrical | $1 | — | issued | 201807134532 |
| Jul 17, 2018 | otc alterations permit: 6th flr fa - salesforce - add 20 smk dets, 11 duct dets, 47 modules, 1 strobe supply, 5 speakers and 49 speakers/strobes. ref 201711204451 maher na | Heating and cooling | $90,920 | — | Finaled Sep 24, 2018 | 201807114260 |
| Jul 17, 2018 | otc alterations permit: 5th fl - fire alarm work for the "salesforce: remodel. additions are 8 smoke detectors, 31 duct detectors, 1 strobe power supply, 28 modules and 30 speaker/strobes. ref pa 2018-0122-9186 | Heating and cooling | $89,610 | — | Finaled Aug 13, 2018 | 201807114211 |
| Jul 17, 2018 | otc alterations permit: 4th fl - fire alarm for the "salesforce" remodel. additions are 10 smoke detectors, 34 duct detectors, 17 modules, 1 strobe power supply, 4 speakers, and 44 speaker/strobes. ref pa 2017-1120-4447 | Heating and cooling | $101,315 | — | Finaled Sep 24, 2018 | 201807114210 |
| Jun 27, 2018 | otc alterations permit: 50th flr - mechanical work for ti. new exhaust fans, new fsd, low pressure duct work. ref 201804307753 maher na | Heating and cooling | $150,000 | — | expired | 201806273080 |
| Jun 18, 2018 | otc alterations permit: fire alarm work for the "salesforce" phase 1.4 remodel on 18th fl; additions are 3 smoke detectors, 9 duct detectors, 1 strobe power supply, 11 speakers, & 44 speaker/strobes. ref pa #201712156680. maher na | Heating and cooling | $55,000 | — | Finaled Apr 30, 2019 | 201806182090 |
| Jun 18, 2018 | otc alterations permit: fire alarm work for the "salesforce" phase 1.4 remodel on 17th fl; additions are 2 smoke detectors, 9 duct detectors, 1 strobe power supply, 11 speakers, & 45 speaker/strobes. ref pa #201712156678. maher na | Heating and cooling | $55,000 | — | Finaled Apr 30, 2019 | 201806182088 |
| Jun 18, 2018 | otc alterations permit: fire alarm work for the "salesforce" phase 1.4 remodel on 16th fl; additions are 2 smoke tetectors, 9 duct detectors, 1 strobe power supply, 11 speakers, & 45 speaker/strobes. ref pa #201712156679. maher na | Heating and cooling | $55,000 | — | Finaled Apr 30, 2019 | 201806182085 |
| Jun 11, 2018 | otc alterations permit: fire alarm work for the "bain & company" remodel on floor 50; additions are 3 smoke detectors, 6 duct detectors, 22 speakers, and 19 speaker/strobes. ref pa #201802272306. maher na | Heating and cooling | $36,835 | — | Finaled Jul 2, 2018 | 201806081335 |
| Jun 1, 2018 | otc alterations permit: 50th fl - mep for ti to include heating, ventilation and air conditioning, new lighting and electrical work. ref pa 2018-0227-2306 | Heating and cooling | $250,000 | — | issued | 201805159088 |
| May 24, 2018 | otc alterations permit: fire alarm work for the "cbre" remodel on floor 46; additions are 4 smoke detectors, 23 duct detectors, 1 strobe power supply, 13 speakers, and 72 speaker/strobes. ref #201805169224. maher na | Heating and cooling | $96,650 | — | Finaled Jun 27, 2018 | 201805249978 |
| May 24, 2018 | otc alterations permit: fire alarm work for the "cbre" remodel on floor 45; additions are 3 smoke detectors, 16 duct detectors, 5 speakers, and 43 speaker/strobes. ref #201805169226. maher na | Heating and cooling | $58,000 | — | Finaled Jun 27, 2018 | 201805249976 |
| May 24, 2018 | otc alterations permit: 45th flr - mechanical and electrical elevator corridor. ref 201805148993 maher na | Electrical | $55,000 | — | issued | 201805240115 |
| May 16, 2018 | otc alterations permit: 34th fl - fire alarm work for the "accenture" remodel. additions are 5 smoke detectors, 1 duct detectors, 1 strobe power supply and 60 speaker/strobes. ref pa 2017-0913-7868. n/a for maher | Heating and cooling | $63,400 | — | Finaled Dec 11, 2018 | 201805169209 |
| May 16, 2018 | otc alterations permit: 13th flr - fire alarm: add 2 smk det. 9 duct det, 1 smk power supply, 44 speaker/strobes and 11 speakers maher na | Heating and cooling | $45,000 | — | Finaled Apr 30, 2019 | 201805148957 |
| May 16, 2018 | otc alterations permit: 15th flr - fire alarm: add 3 smoke det. 9 duct det, 1 strobe power supply, 44 speaker/strobes and 11 speakers maher na | Heating and cooling | $45,600 | — | Finaled May 24, 2021 | 201805148956 |
| May 16, 2018 | otc alterations permit: 14th flr - fire alarm: add 2 smk det. 9 duct det, 1 smk power supply, 44 speaker/strobes and 11 speakers maher na | Heating and cooling | $45,000 | — | Finaled Sep 19, 2019 | 201805148953 |
| Mar 29, 2018 | otc alterations permit: 35th floor. fire alarm work for the "accenture" remodel on 35th floor; additions are 4 smoke detectors, 8 duct detectors, 1 strobe power supply, 15 speakers and 60 speaker/strobes | Heating and cooling | $62,900 | — | Finaled Dec 11, 2018 | 201803274679 |
| Feb 9, 2018 | sign - erect: electric wall sign for salesforce tower; installed atop canopy | Electrical | $5,000 | — | issued | 201709209077 |
| Feb 6, 2018 | otc alterations permit: flr 12 - fire alarm for salesforce. add 2 smk det, 9 duct det, 1 strobe power supply, 11 speaker and 43 speaker/strobes ref 201708144791 maher na | Heating and cooling | $50,460 | — | Finaled Mar 27, 2018 | 201802050312 |
| Feb 6, 2018 | otc alterations permit: flr 11 - fire alarm for salesforce. add 2 smk det, 9 duct det, 1 strobe power supple, 11 speaker and 43 speaker/strobes ref 201708144793 maher na | Heating and cooling | $50,460 | — | Finaled Mar 27, 2018 | 201802050311 |
| Jan 17, 2018 | otc alterations permit: fire alarm work for the "bain & company" remodel on floor 47; additions are 3 smoke detectors, 13 duct detectors, 1 strobe power supply, 53 spakers, and 38 speaker/strobes. ref pa 2017-0517-6809. maher na | Heating and cooling | $78,900 | — | Finaled Sep 10, 2019 | 201801168628 |
| Jan 17, 2018 | otc alterations permit: fire alarm work for the "bain & company" remodel on floor 49; additions are 3 smoke detectors, 122 duct detectors, 1 strobe power supply, 55 speakers, and 33 speaker/strobes. ref pa 2017-0517-6810. maher na | Heating and cooling | $75,880 | — | Finaled Sep 11, 2019 | 201801168627 |
| Jan 17, 2018 | otc alterations permit: fire alarm work for the "bain & company" remodel on floor 48; additions are 5 smoke detectors, 22 duct detectors, 1 strobe power supply, 21 spakers, and 38 speaker/strobes. ref pa 2017-0517-6807. maher na | Heating and cooling | $75,440 | — | Finaled Sep 11, 2019 | 201801168624 |
| Jan 11, 2018 | otc alterations permit: 31st fl - mep to support approved ti new ducts, lighting & plumbing. mep fees paid with arch. ref pa 2017-0925-9412 | Heating and cooling | $1 | — | Finaled Jun 20, 2025 | 201801118379 |
| Jan 11, 2018 | otc alterations permit: 32nd fl - mep to support approved ti new ducts, lighting & plumbing. ref pa 2017-0925-9414 mep fees paid with arch | Heating and cooling | $1 | — | Finaled Jun 20, 2025 | 201801118376 |
| Dec 20, 2017 | sign - erect: install electric wall "sales force" sign | Electrical | $35,000 | — | issued | 201712126201 |
| Dec 18, 2017 | otc alterations permit: 45th floor - mep to support approved ti. new fan coil units, terminal units, transfer fans, lighting & plumbing. ref:#2017-1030-2599. total fees paid with ti. maher n/a | Plumbing | $1 | — | Finaled Apr 8, 2019 | 201711174322 |
| Dec 18, 2017 | otc alterations permit: 46th floor - mep to support approved ti. new fan coil units, terminal units, transfer fans, lighting & plumbing. ref:#2017-1020-1783. total fees paid with ti. maher n/a | Plumbing | $560,000 | — | Finaled Apr 8, 2019 | 201711174320 |
| Nov 16, 2017 | additions alterations or repairs: 10th fl. fire alarm work for the "salesforce" remodel on floor 10; additions are 2 smoke detectors, 13 duct detectors, 1 storage power supply, 11 speakers and 43 speaker/strobes. ref pa #2017-0531-8065 | Heating and cooling | $60,000 | — | Finaled Nov 20, 2017 | 201711103699 |
| Nov 16, 2017 | additions alterations or repairs: 9th fl. fire alarm work for the "salesforce" remodel on floor 9; additions are 2 smoke detectors, 14 duct detectors, 1 storage power supply, 11 speakers and 43 speaker/strobes. ref pa #2017-0530-7940 | Heating and cooling | $60,000 | — | Finaled Nov 20, 2017 | 201711103697 |
| Nov 16, 2017 | additions alterations or repairs: 8th fl. fire alarm work for the "salesforce" remodel on floor 8; additions are 2 smoke detectors, 14 duct detectors, 1 strobe power supply, 11 speakers, and 43 speaker/strobes. ref pa 2017-0530-7943. maher na | Heating and cooling | $60,000 | — | Finaled Nov 20, 2017 | 201711083428 |
| Nov 16, 2017 | additions alterations or repairs: fire alarm work for the "salesforce" remodel on floor 7; additions are 2 smoke detectors, 13 duct detectors, 1 strobe power supply, 11 speakers, and 43 speaker/strobes. ref pa 2017-0525-7696. maher na | Heating and cooling | $60,000 | — | Finaled Nov 20, 2017 | 201711083426 |
| Sep 29, 2017 | otc alterations permit: 35 floor - mep to provide mechanical & electrical systems to meet design criteria for tenant buildout. ref pa 2017-0908-7306; maher ord 155-13 na | Electrical | $1 | — | Finaled Jun 20, 2025 | 201709229378 |
| Sep 26, 2017 | sign - erect: erect 1 electric single faced wall signs for "salesforce". n/a ordinance #155-13 | Electrical | $60,000 | — | issued | 201504234433 |
| Jun 2, 2017 | otc alterations permit: main distribution frame room onm 4th/5th flrs & temp enclosures for cabl routing on flrd 5 & 6 scope includes new access flooring, partitions, electrical/telecom, lighting, mech, plumb, structural, finishes. maher na | Plumbing | $25,000 | — | Finaled Jun 18, 2019 | 201705257694 |
On Mission St
1,222 permits on record on Mission St.
| Trade | Permits | Since Oct 4, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 291 | 52 | $19,800 | $5,000–$47,200 | Sep 30, 2026 |
| Heating and cooling | 413 | 34 | $59,458 | $1,045–$1,040,000 | Sep 16, 2026 |
| Electrical | 324 | 48 | $45,125 | $1–$271,641 | Sep 24, 2026 |
| Plumbing | 166 | 27 | $176,752 | $12,300–$2,079,600 | Sep 2, 2026 |
| Water heater | 16 | 6 | $36,500 | $5,000–$471,400 | Mar 2, 2026 |
| Solar | 12 | 1 | — | under 5 | Jan 15, 2025 |
Roof replacement cost in San Francisco
Across 5,889 one- and two-family reroof permits since October 4, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,760. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 4, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 4, 2026. Owner names are not shown on any page.