235 Pine St, San Francisco
43 home-service permits on record at 235 Pine St, San Francisco; no roofing permit on record.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Apr 24, 2026 | otc alterations permit: safe off controls vavs and ddc controls. reconfigure duct work to match new partition plan. furnish and install galvanized steel duct distribution. furnish and install grilles, registers, diffusers. carry controls subcontractor to provide, install, and commision ddc controls. air balance. provide | Heating and cooling | $232,000 | — | issued | 202604099170 |
| Apr 25, 2023 | otc alterations permit: suite 1800: rebalance existing boxes ref 202301301010. elec/plumbing under sep cover unit 0 | Plumbing | $15,000 | — | Finaled Aug 22, 2024 | 202304185969 |
| Apr 17, 2023 | otc alterations permit: suite 1800 - title 24 compliant electrical drwgs ref pa 2023-0130-1010 | Electrical | $108,000 | — | Finaled Aug 22, 2024 | 202304065139 |
| Feb 18, 2021 | otc alterations permit: hvac modifications to support interior tenant improvements. ref pa# 202008061204 | Heating and cooling | $71,280 | — | issued | 202012140931 |
| Nov 30, 2020 | otc alterations permit: 17/f: electrical buildout including plugs, light fixtures and controls. reference t.i pa# 202008061204 | Electrical | $118,651 | — | issued | 202011179101 |
| Jan 2, 2019 | otc alterations permit: ste 100: duct work modifications to support interior tenant improvement | Heating and cooling | $20,000 | — | Finaled Jul 8, 2019 | 201901029443 |
| Nov 9, 2018 | otc alterations permit: on the 14th fl to include new non-structural partitions, new or revised hvac, electrical and plumbing. n/a for maher | Heating and cooling | $780,000 | — | Finaled Apr 10, 2019 | 201810163347 |
| Jun 1, 2018 | otc alterations permit: suite 700: the extent of the mechanical work for this project includes: the modification of hvac systems to match new arch layout. the replacement of 1 vav box wit ne box. air balance | Heating and cooling | $32,500 | — | Finaled Oct 1, 2018 | 201806010779 |
| May 3, 2018 | otc alterations permit: revision to pa 2017-1220-6999 add 1 water cooled air condition unit for it room. n/a for maher | Heating and cooling | $17,400 | — | Finaled Oct 4, 2018 | 201805038133 |
| May 3, 2018 | otc alterations permit: suite 2300: revision to existing fire alarm ti permit #20171214503. install new addressable in-duct smoke detector, new speaker/strobes. relocate existing speaker/strobes, existing smoke detectors. ref pa #201710302665 | Heating and cooling | $500 | — | Finaled Jun 6, 2018 | 201805038089 |
| Apr 13, 2018 | otc alterations permit: ste 1200 - modification of existing hvac systems to match new architectural layout. the addition of 2 new vav boxes with controls. air balance. ref pa 2018-0302-2706 unit 0 | Heating and cooling | $20,000 | — | issued | 201804065704 |
| Mar 23, 2018 | otc alterations permit: suite 1200: title_24 electrical and new emergency lighting | Electrical | $4,400 | — | issued | 201803234401 |
| Dec 20, 2017 | otc alterations permit: 23rd flr:replace terminal boxes, ducting and air outlets in the hvac system maher na ref 201710302165 | Heating and cooling | $110,339 | — | Finaled Oct 4, 2018 | 201712206999 |
| Dec 20, 2017 | otc alterations permit: 22nd flr:replace terminal boxes, ducting and air outlets in the hvac system maher na ref 201710302663 | Heating and cooling | $98,400 | — | Finaled May 24, 2018 | 201712206998 |
| Nov 21, 2017 | otc alterations permit: tenant improvement to 22nd flr. #2200, 9 new notification appliances, 4 new smoke sensor heads, 1 new in duct smoke sensor, 1 new relay for fsd control, 2 new door holders, slavage and reinstall 7 smoke sensors in plenum ref 201710302663 maher not req | Heating and cooling | $13,800 | — | Finaled Mar 1, 2018 | 201711214508 |
| Oct 10, 2017 | otc alterations permit: 12th floor, ste. 1200 & 1225: the modification of existing hvac systems to match new architectural layout. the addition of 3 new vav boxes with controls. the replacement of 6 vav boxes w/new of eqval size including controls air balance. ref #2017-08-17-5101. maher n/a | Heating and cooling | $88,616 | — | issued | 201710100767 |
| Aug 18, 2017 | otc alterations permit: 18th floor suite 1850 -the modification of existing hvac systems to match new architectural layout. the addition of one vav box with ddc controls. air balance. ref pa #201707121663. n/a maher ordinance unit 0 | Heating and cooling | $17,600 | — | Finaled Sep 25, 2017 | 201708185280 |
| Jul 27, 2017 | otc alterations permit: suite #1475: the modification of existing hvac systems to match new arch layout. the replacement of 5 vav boxes with vav boxes + ddc controls. air balance. maher na unit 0 | Heating and cooling | $40,000 | — | Finaled Nov 21, 2017 | 201707273097 |
| Jul 11, 2017 | otc alterations permit: 12th floor suite 1250 - modification to existing hvac. ref #201706230205. n/a maher ordinance | Heating and cooling | $5,000 | — | Finaled Aug 29, 2017 | 201707111455 |
| May 26, 2017 | otc alterations permit: modification of hvac system to match new arch layout. add 4 new vav boxes with new duct work & dcc controls. air balance | Heating and cooling | $40,000 | — | Finaled Aug 29, 2017 | 201705267749 |
| May 26, 2017 | otc alterations permit: add of 1 return grille with duct & fsd to match new arch layout. these is no new mech equip being installed within project scope. the supply grille to be connected for future ti project ti | Heating and cooling | $6,000 | — | Finaled Sep 25, 2017 | 201705267748 |
| May 12, 2017 | otc alterations permit: 21st floor:fire alarm t.i.: 10 smoke detectors, 1 duct smoke detector, 1 relay, 4 door holders, & 10 notification appliances. ref app#201702270143 | Heating and cooling | $17,000 | — | Finaled Jun 8, 2017 | 201705126465 |
| May 9, 2017 | otc alterations permit: fire alarm system ti, 24th fl. 2 new duct smoke detectors, 2 new relays, relocate and reinstall 4 existing notification appliance. ref 201703222090 | Heating and cooling | $5,200 | — | Finaled Jul 7, 2017 | 201705096095 |
| Apr 20, 2017 | otc alterations permit: 24th floor: duct distribution modified per new space plan. 11 new vav boxes being added. 1 new transfer fan is being added. new heat pumps added. new fsds added; n/a maher | Heating and cooling | $260,000 | — | issued | 201704204469 |
| Apr 20, 2017 | otc alterations permit: mechanical work includes modification of existing hvac systems to match new architectural layout. addition of 3 vav boxes with new duct work and ddc controls. air balance. n/a maher | Heating and cooling | $152,000 | — | issued | 201704204468 |
| Apr 14, 2017 | otc alterations permit: ref to app#: 2017-03-24-2269. 1 new duct smoke sensor, 1 new smoke sensor with relay at extg fsd's in floor 7 corridor | Heating and cooling | $1,500 | — | Finaled Jun 8, 2017 | 201704143992 |
| Apr 7, 2017 | otc alterations permit: the modification of hvac systems to match new architectural layout. the replacement of 16 vav boxes with new vav boxes of equal size and configuration. the addition of 1 new vav box with 7th floor: new controls. air balance | Heating and cooling | $120,000 | — | issued | 201704033004 |
| Apr 7, 2017 | otc alterations permit: 13th floor - the modification of hvac systems to match new architectural layout. air balance. maher na | Heating and cooling | $20,000 | — | Finaled May 11, 2017 | 201704033002 |
| Dec 23, 2016 | otc alterations permit: revision to 201611223312 modification of hvac system to match new arch layout. the replacement of 6 vav box with new vav box & ddc controls. air balance suite 1250 maher na | Heating and cooling | $35,000 | — | Finaled Mar 16, 2017 | 201612225770 |
| Dec 23, 2016 | otc alterations permit: suite 850 revision to 201611223311 maher na modifiication of hvac system to match new arch layout. the replacement of 6 vav box with new vav box & ddc controls. air balance | Heating and cooling | $24,000 | — | Finaled Mar 16, 2017 | 201612225769 |
| Oct 24, 2016 | otc alterations permit: 23rd floor fire alarm tenant improvement - new smoke detectors, new in-duct smoke detectors, speaker/strobes. ref #2016-0712-2162. n/a maher ordinance unit 0 | Heating and cooling | $4,000 | — | Finaled Jan 19, 2017 | 201610170468 |
| Sep 30, 2016 | otc alterations permit: 19th fl fire alarm ti - 4 new smoke detectors, 3 duct smoke detectors, 1 relay, 12 speaker/strobes, 4 door holds. ref #201607111985. maher not req | Heating and cooling | $14,000 | — | Finaled Mar 14, 2017 | 201609076966 |
| Sep 14, 2016 | otc alterations permit: 20th floor fire alarm tenant improvement - 4 new smoke detectors, 2 duct smoke detectors, 1 relay, 10 speaker/strobes, 4 door holds. ref pa #201607122162. n/a maher ordinance unit 0 | Heating and cooling | $12,500 | — | Finaled Mar 14, 2017 | 201609076931 |
| Aug 26, 2016 | otc alterations permit: 19th floor - revision to permit # 2016-0711-1985. revised title 24 calc. revised vav box schedule, zoning diagram, duct layout & pipe layout | Heating and cooling | $1 | — | issued | 201608225685 |
| Feb 23, 2016 | additions alterations or repairs: 24th floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance unit 0 | Plumbing | $31,000 | — | Finaled Jan 4, 2017 | 201512175429 |
| Feb 23, 2016 | additions alterations or repairs: 23rd floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all existing fsd's and mechanical duct mains to remain in place per architect unit 0 | Heating and cooling | $37,000 | — | Finaled May 11, 2017 | 201512175428 |
| Feb 23, 2016 | additions alterations or repairs: 22nd floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all existing fsd's and mechanical duct mains to remain per architect unit 0 | Heating and cooling | $37,000 | — | Finaled Jan 4, 2017 | 201512175427 |
| Feb 23, 2016 | additions alterations or repairs: 21st floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all fsd's and mechanical duct mains to remain per architect unit 0 | Heating and cooling | $31,000 | — | Finaled Jan 4, 2017 | 201512175426 |
| Feb 23, 2016 | additions alterations or repairs: 20th floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all existing fsd's and mechanical duct mains to remain per architect unit 0 | Heating and cooling | $38,000 | — | Finaled Jan 4, 2017 | 201512175425 |
| Feb 23, 2016 | additions alterations or repairs: 19th floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinanceall existing fsd's and mechanical duct mains to remain per parchitect unit 0 | Heating and cooling | $31,000 | — | Finaled Jan 4, 2017 | 201512175423 |
| Dec 22, 2015 | otc alterations permit: 11th floor: demolition of non-load bearing partitions office doors and frames as well as associated electrical, data and finishes. per ab-017 | Electrical | $3,000 | — | Finaled Jan 26, 2016 | 201512114910 |
| Oct 6, 2015 | otc alterations permit: 13th floor: ref pa 2015 0819 4740: modify low pressure ducting,install ducts downstream of vav's. install ddc controls. maher na | Heating and cooling | $112,800 | — | Finaled Apr 21, 2016 | 201510058754 |
| Feb 9, 2015 | otc alterations permit: 13th flr: demolition of existing non-structual interior partitions, doors/frames/hardware, millwork, finishes, mechanical, electrical and plumbing; maher n/a | Plumbing | $66,478 | — | Finaled Apr 21, 2016 | 201502047549 |
On Pine St
530 permits on record on Pine St.
| Trade | Permits | Since Oct 2, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 118 | 23 | $22,850 | $9,320–$71,200 | Jun 17, 2026 |
| Plumbing | 207 | 39 | $80,000 | $61,924–$89,600 | Sep 10, 2026 |
| Heating and cooling | 98 | 6 | $8,635 | $2,001–$161,000 | Apr 24, 2026 |
| Electrical | 96 | 10 | $71,394 | $18,000–$383,156 | Nov 21, 2025 |
| Water heater | 8 | 2 | — | under 5 | Apr 6, 2026 |
| Solar | 3 | 1 | — | under 5 | Mar 26, 2025 |
Roof replacement cost in San Francisco
Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 2, 2026. Owner names are not shown on any page.