555 Pine St, San Francisco
9 home-service permits on record at 555 Pine St, San Francisco; the roof was last permitted on Oct 13, 2016 at a declared value of $50,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Aug 26, 2025 | additions alterations or repairs: install clip-lv devices in the basement electrical space. replace existing panel boards and existing motor control center with new. all misc. electrical work | Electrical | $1,250,000 | — | issued | 202503242877 |
| Apr 16, 2018 | otc alterations permit: built for 201711083448. demo partial sprinkler branch line lateral @ future outside location. extend pre-action system to cover i.t equip. room. demo 4" ground 90 elbow install new ground tee fitting to feed new installed system. install upright sprink under ducts. 95 new sprink | Heating and cooling | $1 | — | Finaled Apr 24, 2018 | 201804166427 |
| Nov 8, 2017 | otc alterations permit: demo partial sprinkler branch line located @ future outside location. extend preaction system to cover i.t. equipment space.demo 4" grooved 90 elbow install new grooved 4" tee fitting to feed new installed sys.install new upright sprinklers under new hvac ducts.total 95 new sprinkler | Heating and cooling | $52,000 | — | Finaled Apr 20, 2018 | 201711083448 |
| Oct 26, 2017 | additions alterations or repairs: 1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, new batteries . n/a for maher ordinance | Heating and cooling | $4,700,000 | — | Finaled Nov 29, 2018 | 201706098944 |
| Jul 24, 2017 | otc alterations permit: add 1 new vespa unit,control relays for fan/fsd shutdown, 2 m\new smoke detectoers, 2 new duct detectors, add 1 replace 1 speaker strobe maher not req | Heating and cooling | $6,401 | — | Finaled Nov 6, 2017 | 201707242698 |
| Jun 23, 2017 | otc alterations permit: architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada work | Plumbing | $139,000 | — | Finaled Jul 30, 2018 | 201704184183 |
| Oct 13, 2016 | otc alterations permit: add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher na | Roofing | $50,000 | — | issued | 201609167930 |
| Sep 7, 2016 | otc alterations permit: install cooling tower side stream filter. install condenser water bypass at cooling towers. modify blowdown piping and add strainer at multistack chiller. maher na | Heating and cooling | $150,000 | — | Finaled Jan 19, 2017 | 201602099095 |
| Aug 2, 2016 | ReRoof: reroofing | Roofing | $921,842 | — | Finaled Dec 14, 2016 | 201608023940 |
On Pine St
530 permits on record on Pine St.
| Trade | Permits | Since Oct 2, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 118 | 23 | $22,850 | $9,320–$71,200 | Jun 17, 2026 |
| Plumbing | 207 | 39 | $80,000 | $61,924–$89,600 | Sep 10, 2026 |
| Heating and cooling | 98 | 6 | $8,635 | $2,001–$161,000 | Apr 24, 2026 |
| Electrical | 96 | 10 | $71,394 | $18,000–$383,156 | Nov 21, 2025 |
| Water heater | 8 | 2 | — | under 5 | Apr 6, 2026 |
| Solar | 3 | 1 | — | under 5 | Mar 26, 2025 |
Roof replacement cost in San Francisco
Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 2, 2026. Owner names are not shown on any page.