| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Feb 14, 2025 | otc alterations permit: 10th flr: t.i. improvement of tenant space. minor demo and construction of non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg | Plumbing | $905,276 | — | Finaled Aug 13, 2025 | 202501249050 |
| Nov 5, 2024 | otc alterations permit: installation of new lobby hidden door, new finishes and required restroom upgrades electrical will be trade permit path of travel previously approved pa# 2023-0223-2487 | Electrical | $25,000 | — | Finaled Feb 18, 2025 | 202410283838 |
| Oct 26, 2023 | otc alterations permit: 15/f: restroom upgrades on floor includes replaceing interior restroom finishes, new lighting, toilet partitions, sinks, and fixtures electrical and life safety under seperate permit path of travel approved per permit 202302232487 | Electrical | $70,000 | — | Finaled May 29, 2024 | 202305177927 |
| Oct 18, 2023 | otc alterations permit: revision to pa# 202305188090. install electrical single faced wall sign "databrick" revised to mount sign on 2" deep 0.80 alliminum wireway cabinet to exterior | Electrical | $6,405 | — | Finaled May 14, 2024 | 202309126395 |
| Oct 5, 2023 | otc alterations permit: 3/f: existing fire sprinkler system-tenant improvements relocate 4 and change out 2 pendent sprinklers | Heating and cooling | $4,000 | — | Finaled Nov 21, 2023 | 202310058125 |
| May 31, 2023 | sign - erect: install 1 electric single faced wall sign "databricks" | Electrical | $14,085 | — | Finaled May 14, 2024 | 202305188090 |
| May 16, 2023 | otc alterations permit: mechanical work to tenant improvement, electrical to show documentation of existing electrical, lighting controls. new return air wall opening added. ref 202304206101 | Electrical | $20,000 | — | Finaled Sep 18, 2024 | 202305097353 |
| Nov 29, 2022 | otc alterations permit: 4th floor: mechanical and electrical to pa#202209152537 | Electrical | $1 | — | Finaled Feb 9, 2023 | 202211156559 |
| Aug 10, 2022 | otc alterations permit: 12/f: hvac modifications to support interior t.i., electrical power, lighting & signal. t.i. pa202204051553 | Heating and cooling | $250,000 | — | issued | 202208029702 |
| Nov 15, 2021 | otc alterations permit: 10th floor: suite 1020: revision to 202106293445. adding mech/electrical t the project | Electrical | $175,000 | — | issued | 202111102181 |
| Jun 28, 2021 | otc alterations permit: 15th floor: add , relocate and change out sprinklers per t.i. ref # : 2020-1031-7929, job #: 21-604 | Heating and cooling | $5,486 | — | Finaled Jul 20, 2021 | 202105110173 |
| Feb 3, 2020 | otc alterations permit: t-24 electrical for work under pa# 201911137131 | Electrical | $1 | — | Finaled Oct 27, 2020 | 202002033327 |
| Jan 31, 2020 | otc alterations permit: soft demo removal of existing walls, floor, and wall finishes plumbing and ceiling to remain | Plumbing | $20,000 | — | Finaled Nov 17, 2020 | 202001313279 |
| Sep 20, 2019 | otc alterations permit: 2nd fl - fire alarm ref pa 2019-0722-6552. install 169 ceiling mount speaker strobes; install 3 duct detectors w/sampling tub; install 3 control relay; relocate 1 smoke detector w/base | Heating and cooling | $15,000 | — | issued | 201909202202 |
| Aug 24, 2018 | otc alterations permit: 14th fl: electrical upgrade: new lighting & power for new break area. new break room equip. new power for conference, team room, open offices, and furniture feed | Electrical | $15,000 | — | Finaled Nov 1, 2018 | 201808248252 |
| Aug 22, 2018 | otc alterations permit: electrical - maintain some lighting. 2nd fl. & 16th fl. restroom only. title 24 ref 201807063910 & 2018.07.06.3909 | Electrical | $10,000 | — | issued | 201808177662 |
| Aug 22, 2018 | otc alterations permit: 1/f: sales center - relocate 1 panel board to new electrical closet, install new receptacles for connection, install new luminars w/assoc controls maher na. ref pa#201805169218 | Electrical | $250,000 | — | Finaled Mar 11, 2019 | 201808066463 |
| Jul 20, 2018 | otc alterations permit: ref pa# 201804247138; install ceiling mount strobes, install ceiling mount speaker strobes, install duct detector w/housing, install control relay module | Heating and cooling | $12,250 | — | Finaled Jul 31, 2018 | 201807205053 |
| Jul 2, 2018 | otc alterations permit: work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferred | Plumbing | $379,000 | — | Finaled Mar 11, 2019 | 201805169218 |
| May 9, 2018 | additions alterations or repairs: 2 door lock release pull stations; 5 wall speaker-strobes; 63 ceiling speaker strobe, install 1 facu w/ annuciator, 1 network node; 1 remote ann; 1 smoke control panel; 1 printer; 1 2-way comm panel; power supply; 6 call stations; 170 smoke detectors; 63 duct detectors; 26 iso modulers; cont remarks | Heating and cooling | $300,000 | — | Finaled May 10, 2019 | 201803274717 |
| Apr 4, 2018 | otc alterations permit: ground flr. minimal ceiling demolition. demolition of gyp soffit, turning sprinkler heads up. safetying off electrical elements and painting new exposed ceiling to match existing. ref. sprinkler permit #201803264548 | Electrical | $30,000 | — | Finaled Apr 25, 2018 | 201804025294 |
| Feb 6, 2018 | otc alterations permit: 11th flr - electrical work for ti ref 201801088016 maher na | Electrical | $3,000 | — | Finaled Jun 27, 2018 | 201802060477 |
| May 18, 2017 | otc alterations permit: 12/f-mechanical, electrical & plumbing for ti @ suite 1230. ref pa 201703272364 | Plumbing | $15,000 | — | Finaled May 23, 2017 | 201705166660 |
| Apr 19, 2017 | otc alterations permit: suite 1230, 12th floor - minimal demolition/construction of new walls, glazing & door. ceiling & lighting to remain. no plumbing. mep under separate permit | Plumbing | $150,000 | — | Finaled May 31, 2017 | 201703272364 |
| Apr 12, 2017 | otc alterations permit: suite 230 - new millwork counter, new sink and new electrical | Electrical | $2,000 | — | Finaled May 18, 2017 | 201704103588 |
| Apr 6, 2017 | otc alterations permit: provide & install 4 ton system for supplemental system. off hours use. install ductwork | Heating and cooling | $14,000 | — | issued | 201704043085 |
| Aug 25, 2016 | otc alterations permit: mechanical & electrical work for ti on the 3rd floor. ref pa 2016-0725-3579 | Electrical | $108,000 | — | issued | 201608255977 |
| Aug 10, 2016 | otc alterations permit: demolition and construction of new partitions, glazing, doors ceiling, lighting and plumbing mep, life safety, and sprinkler is under separate permit | Plumbing | $350,000 | — | Finaled Nov 28, 2016 | 201607283579 |
| Jul 20, 2016 | otc alterations permit: 12th flr, #1220 - ref. to pa#201605036421. electrical-to provide new lighting & branch circuiting to existing panel, maintain some power & signal outlet & provide additional new power. n/a ordinance #155-13 | Electrical | $30,000 | — | Finaled Oct 25, 2016 | 201607202866 |
| Jul 20, 2016 | otc alterations permit: 4/f #405 - ref. to pa#201605036423, electrical to provide new lighting & branch circuiting to existing panel, maintain some power & signal outlet & provide additional new power. n/a ordinance #155-13 | Electrical | $10,000 | — | Finaled Oct 25, 2016 | 201607202861 |
| Jun 14, 2016 | otc alterations permit: 4th floor ste 405 - demolition and construction of partitions, glazing & door. no elec or plumbing work, exist ceiling, grid, lighting to remain. mech, l/s and sprinkler under sep permit. n/a maher ordinance | Plumbing | $10,000 | — | Finaled Oct 25, 2016 | 201605036423 |
| Jun 14, 2016 | otc alterations permit: 12th floor suite 1220 -construction of new partitions, glazing, door, and minimal lighting. existing ceiling tile and grid to remain. no plumbing work. code upgrade to main elevator lobby corridor doors. mech, ele, l/s, sprinkler uunder sep permit. n/a maher ordinance | Plumbing | $80,000 | — | Finaled Oct 25, 2016 | 201605036421 |
| May 24, 2016 | otc alterations permit: 2nd floor #230- construction of partition, glazing, door and lighting. no plumbing work, existing ceiling grid and tile to remain. mechanical, electrical, modification is under seperate permit. n/a ordinance #155-13 | Plumbing | $15,000 | — | Finaled Oct 17, 2016 | 201604285903 |
| Apr 21, 2016 | otc alterations permit: electrical work for bathroom remodel, title 24, ref pa 2016-0203-8736 | Electrical | $6,045 | — | Finaled Aug 2, 2016 | 201604184967 |
| Apr 20, 2016 | otc alterations permit: electrical lighting to pa#201603283239. title 24 compliance. n/a ordinance #155-13 | Electrical | $10,000 | — | Finaled May 24, 2016 | 201604205219 |
On Spear St
317 permits on record on Spear St.
| Trade | Permits | Since Oct 2, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 16 | 3 | — | under 5 | Mar 19, 2026 |
| Heating and cooling | 119 | 15 | $36,526 | $10,000–$854,800 | Sep 22, 2026 |
| Electrical | 119 | 17 | $190,000 | $15,000–$1,599,099 | Sep 2, 2026 |
| Plumbing | 57 | 13 | $28,526 | $6,200–$884,221 | Sep 21, 2026 |
| Water heater | 4 | 0 | — | under 5 | Sep 2, 2022 |
| Solar | 2 | 0 | — | under 5 | Jan 19, 2021 |
Roof replacement cost in San Francisco
Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 2, 2026. Owner names are not shown on any page.