201 Spear St, San Francisco
52 home-service permits on record at 201 Spear St, San Francisco; the roof was last permitted on Dec 19, 2024 at a declared value of $750,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Sep 1, 2026 | otc alterations permit: level 1- 980 sf ti from office to gym to include minor non structrual demo with space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permits | Electrical | $135,915 | — | issued | 202511129401 |
| Jan 28, 2026 | otc alterations permit: g/f -ste 1650: demolition of interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017 | Heating and cooling | $15,000 | — | issued | 202601274642 |
| Dec 18, 2025 | otc alterations permit: 17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642 | Heating and cooling | $170,000 | — | Finaled Apr 6, 2026 | 202511210171 |
| Oct 31, 2025 | otc alterations permit: 17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit | Electrical | $800,000 | — | Finaled Apr 6, 2026 | 202509054642 |
| Aug 22, 2025 | otc alterations permit: electrical t.i. for level 18 t.i. ref pa #202412025941. work includes new lighting and branch circuiting to existing panel. new panel boards, new power and signal branch circuiting to new panel. t-24 compliance forms | Electrical | $1 | — | Finaled Oct 3, 2025 | 202508183253 |
| Aug 15, 2025 | otc alterations permit: floor 18 floor. revision to pa#: 202503192579. install duct detector. install control relay. install speaker strobes. mech revision ref 202508153120 | Heating and cooling | $5,201 | — | Finaled Aug 22, 2025 | 202508153177 |
| Apr 14, 2025 | otc alterations permit: unit 100: removal of cabinets & counters. cap off all abandoned plumbing & electrical | Plumbing | $5,000 | — | Finaled Apr 22, 2025 | 202504144317 |
| Mar 25, 2025 | otc alterations permit: 18/f: install 12 ceiling mount speaker strobes, 2 duct detectors, 2 wall mount speaker strobes, 3 control relays, 2 wp wall mount speakers, 3 pull stations, install 2 wp wall mount strobe, install 3 pull stations, install 7 smoke detectors. arch ref# 202412025941 mech ref# 202503111972 | Heating and cooling | $21,312 | — | Finaled Aug 22, 2025 | 202503192579 |
| Dec 19, 2024 | otc alterations permit: 18/f: ti for building and amentity spaces for conferencing and break area. work includes partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes planting area, pedestal pavers, roofing, decorative. electrical deferred | Roofing | $750,000 | — | Finaled Oct 3, 2025 | 202412025941 |
| Mar 21, 2023 | additions alterations or repairs: demolition of existing partitions and act ceiling for reinforcement of window washing system on roof above | Roofing | $245,000 | — | issued | 202209283319 |
| Jan 19, 2021 | otc alterations permit: modification to telecom facility: add 3 new antennas per sector . r/r 3 antennas. add 3 radios. add 6x12 hybrid cable. add battery enclosures | Solar | $30,000 | — | Finaled Mar 14, 2022 | 202010176710 |
| Jun 29, 2020 | otc alterations permit: unit 2f: modification to existing hood and duct fire suppression system. ref t.i. 202001212356. maher n/a | Heating and cooling | $21,122 | — | issued | 202006128603 |
| Jan 24, 2020 | otc alterations permit: 17th floor: t-24 mechanical and electrical for work under app#201909090998 | Electrical | $12,000 | — | Finaled Jun 1, 2020 | 202001222528 |
| Nov 25, 2019 | otc alterations permit: roof - replace supply fan with new unit of identical capacity and reconnect existing duct work | Heating and cooling | $199,000 | — | Finaled Aug 10, 2020 | 201911258132 |
| Nov 18, 2019 | otc alterations permit: 4th flr. installation of interior partitions, door and celings. non-prep micro kitchen millwork and supporting equipment, lighting, plumbing fixtures | Plumbing | $94,500 | — | Finaled Oct 1, 2020 | 201907307272 |
| Oct 9, 2019 | otc alterations permit: rev to pa201812198821: removal of duct wrap in exposed area/foh restaurant | Heating and cooling | $1 | — | Finaled Oct 31, 2019 | 201906284719 |
| Aug 27, 2019 | otc alterations permit: 4 ceiling speaker strobes, 1 wall speaker strobe, 6 duct det, 5 control relays, 2 monitor modules. ref 201812198821 | Heating and cooling | $12,000 | — | Finaled Oct 2, 2019 | 201908279903 |
| Aug 15, 2019 | sign - erect: install non-electrical single faced wall sign "gozu" | Electrical | $2,000 | — | Finaled Sep 23, 2019 | 201908158831 |
| May 9, 2019 | otc alterations permit: 15th flr. plumbing and electrical to support architectural. install plumbing fixtures, sinks, water heaters, vent and piping. ref pa 201903044308 | Water heater | $30,000 | — | issued | 201905080086 |
| May 8, 2019 | otc alterations permit: 15th flr - mechnical only permit to support arch set. demo ductwork, install new vav ductwork, heatpump and pipework. ref 201903044308 | Heating and cooling | $100,000 | — | Finaled Feb 16, 2021 | 201904269044 |
| Apr 25, 2019 | otc alterations permit: at&t wireless remove & replace 3 antennas swap out equipment, swap 3 rrus-11 +a2 w/3 rrus-32 b66. remove 6 rrus, remove cabinet, install 6 diplexers, install 1 battery rack & 3 strings of 155ah batteries, install 1 gps lte antenna, rmeove dus41 unit, remove xmu | Solar | $25,000 | — | Finaled Mar 9, 2020 | 201803305154 |
| Apr 12, 2019 | otc alterations permit: mechanical, electrical and plumbing work to facilitate architecrural revisions to existing office | Plumbing | $100,000 | — | Finaled Oct 16, 2019 | 201903296598 |
| Apr 25, 2018 | otc alterations permit: installation of electrical outlets, lighting fixtures and lighting controls to meet title 24 requirements. alterations to previously approved pa 2017-0808-4144 | Electrical | $1 | — | Finaled Nov 5, 2018 | 201803214278 |
| Apr 25, 2018 | otc alterations permit: 13th fl - installation of new partitions, doors & frames associated with 2 new rooms. existing lighting & power/date to remain. mechanical & electrical under separate permit, no demolition of nay wall | Electrical | $36,000 | — | Finaled Nov 5, 2018 | 201803133500 |
| Jan 18, 2018 | otc alterations permit: fire alarm tenant improvement, install 30 ceiling mount speaker strobes, 1 wall mount speaker strobe, replace 5 smoke detectors, replace pull stations, replace 1 duct dectector. ref 201707242796. maher n/a | Heating and cooling | $18,500 | — | Finaled Apr 30, 2018 | 201801188945 |
| Nov 14, 2017 | otc alterations permit: 10th fl mep demo of ductwork, elocate 1 vav 9install low pressure duct work relocate thermostats. new outlets in offices modify e lighting within office ref 201709269534 | Heating and cooling | $52,000 | — | Finaled May 2, 2018 | 201711063182 |
| Oct 16, 2017 | otc alterations permit: 10/f- add offices & conference rooms to space, new partitions, 3 doors, all floor & ceiling remain existing. new paint. mechanical, electrical & fire safety under separate permit. n/a ordinance #155-13 | Electrical | $35,000 | — | Finaled May 2, 2018 | 201709269534 |
| Sep 20, 2017 | otc alterations permit: 13th fl - installation of electrical outlets devices and lighting controls to meet title 24. installation of new supply duct branches and wshp for it rooms. installation of insta hot water htr & associated new piping. reference app# 201707242796. n/a for maher | Water heater | $1,400,000 | — | Finaled Nov 5, 2018 | 201708084144 |
| Jul 24, 2017 | sign - erect: non electric wall sign | Electrical | $150 | — | issued | 201707242749 |
| Jul 21, 2017 | otc alterations permit: 5th & 6th floor fire alarm t.i. - as built to reference #201706219939 - install ceiling mount speaker/strobe. install wall mount speaker/strobe; delete installation of duct detectors & control relay modules . n/a maher ordinance | Heating and cooling | $1 | — | Finaled Nov 25, 2019 | 201707192385 |
| Jul 13, 2017 | otc alterations permit: revision to 201702018435, revised heat pumps for revised it rooms, update vav zones and boxes, relocated elec devices based on updated room layouts, it room updates maher not req | Heating and cooling | $1 | — | Finaled Nov 5, 2018 | 201705237331 |
| Jul 13, 2017 | otc alterations permit: revision to 201702018438, revised heat pumps for revised it rooms, relocate devices based on updated room layouts, it room updates maher not req | Heating and cooling | $1 | — | Finaled Oct 25, 2018 | 201705237330 |
| Jul 13, 2017 | otc alterations permit: revision to 201703080990 revised heat pumps for revised it rooms and relocate elec devices based on updated room layouts, it room updates | Heating and cooling | $1 | — | Finaled Oct 25, 2018 | 201705237329 |
| Jul 7, 2017 | otc alterations permit: 2/f: f/a t.i. full floor replacement of all existing initiating devices: r/r 7 smoke detectors w/ bases, r/r 3 pull stations, r/r 1 duct detector w/ sampling tube, r/r 4 monitor modules | Heating and cooling | $7,500 | — | Finaled Aug 15, 2017 | 201707061148 |
| Jun 21, 2017 | otc alterations permit: 5th & 6th floors - fire alarm ti - install 60 ceiling mount speaker-strobes; install 4 control relay modules, install 6 smoke detectors with base and 2 duct smoke detectors. ref pa 201702018381. m/a maher | Heating and cooling | $37,440 | — | Finaled Jul 31, 2017 | 201706219939 |
| May 16, 2017 | otc alterations permit: electrical installation of new lighting and lighting controls, power devices, emergency egress lighting, branch circuit wiring ref 201612124690. n/a maher | Electrical | $40,000 | — | Finaled Aug 28, 2017 | 201705116395 |
| May 16, 2017 | otc alterations permit: 2nd floor -suite 220: electrical installation for lighting, lighting controls, power devices, emergency egress lighting and branch circuit wiring. maher not req. ref # 201612124688 | Electrical | $84,000 | — | Finaled Aug 28, 2017 | 201705116392 |
| Mar 23, 2017 | otc alterations permit: ref app#201703070829: mech: base bldg ahu to serve new terminal units to conditioned occupied area, new heat pump for it. electrical: new panel boards, transformers and associated elec. infrastructure, lighting constrols.power to mech & plmg. plmg: sanitary drainage , venting system, hot/cold water | Heating and cooling | $634,987 | — | Finaled Dec 10, 2018 | 201703080990 |
| Mar 23, 2017 | otc alterations permit: 4th flr - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378 | Heating and cooling | $634,987 | — | Finaled Oct 25, 2018 | 201702018438 |
| Mar 23, 2017 | otc alterations permit: 5th,6th flr -m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381 | Heating and cooling | $1,269,974 | — | Finaled Nov 6, 2018 | 201702018435 |
| Mar 17, 2016 | otc alterations permit: install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinance | Electrical | $5,000 | — | Finaled Sep 1, 2016 | 201602028580 |
| Aug 3, 2015 | otc alterations permit: 16th floor suite 1600 & 1650 spec suites - mechanical & electrical work. ref #2015.0520.6818. n/a maher ordinance | Electrical | $242,000 | — | Finaled Nov 20, 2015 | 201507161734 |
| Jun 4, 2015 | otc alterations permit: 10th flr: re-route hvac ducts to new locations. reference application # 201505206817. n/a maher ord. # 155-13 | Heating and cooling | $10,000 | — | Finaled Nov 30, 2017 | 201506048080 |
| Jun 4, 2015 | otc alterations permit: 10th fl: remote hvac duct to new locations. reference # 201505206817. maher not req | Heating and cooling | $10,000 | — | Finaled Dec 30, 2015 | 201505085759 |
| May 8, 2015 | otc alterations permit: 13th floor: reroute hvac duct to new locations. na maher ord. # 155-13 | Heating and cooling | $8,000 | — | Finaled Nov 30, 2017 | 201505085763 |
| Apr 7, 2015 | otc alterations permit: revision to 201410158952. interior wall reconfiguration. mech, electrical under sep permit | Electrical | $42,000 | — | Finaled Dec 2, 2015 | 201504032758 |
| Apr 7, 2015 | otc alterations permit: tenant improvement 13th fl demo of e offices, conference rooms. installation of millwork and fixtures and finishes. new walls and doors. ceiling to remain existing, new and relocate lights. elec and mechanical, plumbing sep permit | Plumbing | $150,000 | — | Finaled Nov 30, 2017 | 201504032756 |
| Mar 12, 2015 | otc alterations permit: 11th floor - electrical t-24 for work done under pa #2014.12.03.2946. n/a maher ordinance | Electrical | $13,500 | — | Finaled Apr 13, 2015 | 201503120646 |
| Mar 9, 2015 | otc alterations permit: electrical t24 for work done under 201408224521. compliance with maher ordinance no 155-13 not required | Electrical | $38,500 | — | Finaled Mar 16, 2015 | 201503090295 |
| Feb 24, 2015 | otc alterations permit: hvac 12 th floor for remodel under 201501216280 | Heating and cooling | $15,000 | — | Finaled Feb 7, 2018 | 201502198709 |
| Feb 24, 2015 | otc alterations permit: 1st floor, selective demo and restroom remodel. include altration to existing exhaust and duct work. n/a for the maher | Heating and cooling | $25,000 | — | Finaled Sep 24, 2015 | 201502057568 |
| Jan 30, 2015 | otc alterations permit: revision to 201410158954. partial demo of offices, installation of new millwork, new finishes throughout space, floor and walls, ada upgrade at restrooms. mech, elec, plumbing sep permit | Plumbing | $51,556 | — | Finaled Nov 30, 2017 | 201501216280 |
On Spear St
317 permits on record on Spear St.
| Trade | Permits | Since Oct 2, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 16 | 3 | — | under 5 | Mar 19, 2026 |
| Heating and cooling | 119 | 15 | $36,526 | $10,000–$854,800 | Sep 22, 2026 |
| Electrical | 119 | 17 | $190,000 | $15,000–$1,599,099 | Sep 2, 2026 |
| Plumbing | 57 | 13 | $28,526 | $6,200–$884,221 | Sep 21, 2026 |
| Water heater | 4 | 0 | — | under 5 | Sep 2, 2022 |
| Solar | 2 | 0 | — | under 5 | Jan 19, 2021 |
Roof replacement cost in San Francisco
Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 2, 2026. Owner names are not shown on any page.