Permits Index
5
Permits, 24 months
13 on record
7
Roofing permits
Aug 24, 2026
Last permit issued
11
Addresses with a page

Roofing: 7 permits

From Jan 27, 2021 to Aug 24, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 3, are on their house pages: 2024: 1 · 2021: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_257_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Miscellaneous Bldg/Structure$270,000—26016-10000-22457
Nov 24, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overEXISTING solid sheathing 310 Squares. Class A roof covering is required within Very HighFireHazard Severity Zone . For residential roof replacement > 50% of the total roof area,apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roofmay be required for non-residential buildings per Title 24, Part 6, Section141.0 2BManufacturing$133,000—25016-40000-33919
Aug 28, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very High FireHazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council .Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section141.0 2B."COMPLY WITH DEPARTMENT ORDER effective date12/25/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Miscellaneous Bldg/Structure$60,000—25016-20000-26180
Nov 5, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMiscellaneous Bldg/Structure$1,130,000—24016-20000-33720

Electrical: 3 permits

From Feb 22, 2021 to Jun 11, 2024. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 3, are on their house pages: 2024: 1 · 2022: 1 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Plumbing: 1 permit

From Aug 12, 2025 to Aug 12, 2025. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 12, 2025Bldg-Demolition: DEMOLITION OF EXISTING OFFICE BUILDING BY HANDWRECK METHOD.FENCE AND SEWER CAP REQUIREDOffice$12,000—25019-10000-02223

Heating and cooling: 1 permit

From Jun 15, 2022 to Jun 15, 2022. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Solar: 1 permit

From Sep 15, 2021 to Sep 15, 2021. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.