30
Permits, 24 months
81 on record
60
Roofing permits
Sep 15, 2026
Last permit issued
68
Addresses with a page

Roofing: 60 permits

From Jun 22, 2020 to Sep 15, 2026. Across 21 roofing permits since October 2, 2024, most declared values run from $2,000 to $9,400 (the middle 80%); the median is $5,000 and half fall between $2,800 and $6,300. The lowest on record is $800 and the highest $17,000.

Since October 2, 2024, 22 listed below. Earlier permits, 38, are on their house pages: 2024: 7 · 2023: 17 · 2022: 5 · 2021: 5 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 15, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,100—26016-90000-25077
Apr 13, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—26016-90000-09650
Jan 10, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,600—26016-90000-00849
Jan 9, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$1,800—26016-90000-00826
Jan 8, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,800—26016-90000-00686
Dec 11, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,400—25016-90000-36396
Sep 9, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,800—25016-90000-27268
Jul 31, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—25016-20000-23401
Jul 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___11___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDwelling - Single Family$10,000—25016-30000-21058
Jun 25, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___29___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2BDwelling - Single Family$6,000—25016-10000-20085
Jun 3, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,800—25016-90000-17967
May 29, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___16___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDwelling - Single Family$4,000—25016-10000-17465
May 27, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___17___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BDwelling - Single Family$17,000—25016-70000-17135
Apr 22, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,000—25016-90000-12683
Mar 26, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,300—25016-20000-08975
Mar 18, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _14_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B. HOUSE 14 Sq CRRC 0890-0011Dwelling - Single Family$9,400—25016-10000-07627
Jan 23, 2025Bldg-Alter/Repair: SUPPLEMENTAL TO PERMIT #25016-90000-00898 TO CHANGE WORK DESCRIPTION FROM OVER EXISTING SHEATHING TO NOW READ Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___4___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2BDwelling - Single Family——25016-10001-00898
Jan 13, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 4 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$800—25016-90000-00898
Dec 5, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,000—24016-90000-38525
Nov 14, 2024Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO 23014-20000-04332 FOR ROOF TRUSSESDwelling - Single Family$2,000—23014-20001-04332
Nov 6, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing__13____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2BDwelling - Single Family$7,150—24016-10000-35604
Oct 22, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __23__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$8,050—24016-10000-33645

Heating and cooling: 18 permits

From Feb 26, 2020 to Jul 29, 2026. Across 6 heating and cooling permits since October 2, 2024, most declared values run from $752 to $32,500 (the middle 80%); the median is $6,376 and half fall between $1,502 and $21,188. The lowest on record is $501 and the highest $40,000.

Since October 2, 2024, 6 listed below. Earlier permits, 12, are on their house pages: 2024: 3 · 2023: 3 · 2022: 3 · 2021: 2 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 29, 2026Bldg-Alter/Repair: 3 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.1 bathroom .Bathroom remodel for residential buildings .2 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Kitchen remodel for residential buildingsDuplex$9,751—26016-90000-20023
Sep 16, 2025Bldg-Alter/Repair: 10 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.1 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$3,001—25016-90000-27988
May 21, 2025Bldg-Alter/Repair: 1 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.2 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$1,002—25016-90000-16748
Mar 13, 2025Bldg-Alter/Repair: WINDOW change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Dwelling - Single Family$501—25016-10000-07085
Feb 26, 2025Bldg-Alter/Repair: 9 Window and 2 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24Dwelling - Single Family$40,000—25016-10000-05221
Nov 8, 2024Bldg-Alter/Repair: Kitchen/ bathroom remodel for residential buildings . MEPS INCLUDED. Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24."COMPLY WITH DEPARTMENT ORDER effective date 02/09/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Dwelling - Single Family$25,000—24016-10000-35863

Plumbing: 3 permits

From May 31, 2022 to Sep 18, 2025. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 2 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 18, 2025Bldg-Demolition: EPLAN.DEMO EXISTING OFFICE BUILDING. SEWER CAP AND PEDESTRIAN PROTECTION FENCE REQUIREDOffice$20,000—25019-10000-00035
Sep 9, 2025Bldg-Alter/Repair: 1 Kitchen/1 bathroom remodel for residential buildings MECHANICAL, ELECTRICAL, AND PLUMBING INCLUDEDDwelling - Single Family$9,000—25016-70000-27257

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.