33
Permits, 24 months
88 on record
64
Roofing permits
Sep 9, 2026
Last permit issued
77
Addresses with a page

Roofing: 64 permits

From Jan 17, 2020 to Sep 9, 2026. Across 26 roofing permits since October 3, 2024, most declared values run from $2,851 to $39,850 (the middle 80%); the median is $7,500 and half fall between $5,050 and $25,183. The lowest on record is $1,000 and the highest $100,000.

Since October 3, 2024, 27 listed below. Earlier permits, 37, are on their house pages: 2024: 2 · 2023: 15 · 2022: 9 · 2021: 5 · 2020: 6.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 9, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,000—26016-90000-24381
Jul 31, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 100 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$20,000—26016-90000-20254
Jul 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$26,910—26016-20000-19637
Jul 15, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 13 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$2,600—26016-90000-18664
Mar 17, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,200—26016-90000-07232
Mar 5, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,400—26016-90000-05936
Feb 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$36,700—26016-10000-04851
Dec 22, 2025Bldg-Alter/Repair: Supplemental to permit 25016-70000-37019 & 25016-20001-37019 to transfer contractor from Peraza Roofing Services Inc, 1019312 to Ecomax Builders, 1125832Apartment——25016-20002-37019
Dec 8, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 31 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,200—25016-90000-35864
Sep 18, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very HighFireHazard Severity Zone . For residential roof replacement > 50% of the total roof area,apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roofmay be required for non-residential buildings per Title 24, Part 6, Section141.0 2BApartment$99,500—25016-20000-28194
Aug 6, 2025Bldg-Alter/Repair: SUPPLEMENTAL TO 24014-20000-05748. TO REVISE ROOF PITCHDwelling - Single Family$1,000—24014-20002-05748
Jul 25, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 5 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$1,000—25016-90000-22932
Jul 25, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—25016-90000-22931
Jun 19, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,200—25016-90000-19585
May 12, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _28_ squares. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$8,000—25016-20000-15469
Mar 19, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _55_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Apartment$41,700—25016-40000-07858
Jan 28, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very HighFireHazard Severity Zone . For residential roof replacement > 50% of the total roof area,apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roofmay be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$38,000—25016-20000-02399
Jan 22, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 2 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Replace existing siding with new stucco for single family dwellings and duplex only. Area = 160 sqft.Replacement of damaged framing members for single family dwellings and duplex .Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildingsMiscellaneous Bldg/Structure$3,102—25016-90000-01889
Jan 6, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,600—25016-90000-00262
Dec 31, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$100,000—24016-20000-40571
Nov 21, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 170 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BWarehouse$34,000—24016-90000-37176
Nov 13, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___30___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BApartment$9,500—24016-30000-36337
Nov 11, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,600—24016-90000-36008
Nov 6, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—24016-90000-35630
Oct 23, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$14,000—24016-20000-33863
Oct 4, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 41 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$8,200—24016-90000-31829
Oct 4, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 41 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$8,200—24016-90000-31828

Heating and cooling: 14 permits

From Jan 7, 2020 to Jul 17, 2025. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 3 listed below. Earlier permits, 11, are on their house pages: 2024: 2 · 2023: 3 · 2022: 4 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 17, 2025Bldg-Alter/Repair: 3 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$750—25016-90000-22100
Jun 16, 2025Bldg-Alter/Repair: 11 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$2,750—25016-90000-19223
Apr 30, 2025Bldg-Alter/Repair: 16 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$4,000—25016-90000-13905

Plumbing: 7 permits

From Feb 5, 2020 to May 1, 2025. Fewer than 5 plumbing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 1 listed below. Earlier permits, 6, are on their house pages: 2024: 2 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
May 1, 2025Bldg-Demolition: DEMO THE SFD AND DETACHED GARAGE. SEWER CAP AND FENCE REQUIREDDwelling - Single Family$4,000—25019-20000-01457

Electrical: 3 permits

From Dec 11, 2023 to Nov 7, 2025. Fewer than 5 electrical permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 2 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Nov 7, 2025Bldg-Alter/Repair: EPLAN SUPPLEMENTAL PERMIT TO 25010-20000-00920 TO REVISE TITLE 24 CALCULATIONS AND REMOVE THE ALL ELECTRIC REQUIREMENTAccessory Dwelling Unit$5,000—25010-20001-00920
Jun 12, 2025Bldg-Alter/Repair: ePlan: supplemental to 24010-10000-04655 to revise title 24 to remove all electric fuel type and use as natural gasAccessory Dwelling Unit$501—24010-10002-04655