N Haverford Ave, Los Angeles: permits on record
24 home-service permits on record on N Haverford Ave since June 8, 2020, 6 of them since October 6, 2024, at 22 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 18 permits
From Aug 12, 2020 to Aug 17, 2026. Fewer than 5 roofing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 6, 2024, 4 listed below. Earlier permits, 14, are on their house pages: 2024: 1 · 2023: 2 · 2022: 2 · 2021: 8 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 17, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 59 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $48,000 | — | 26016-30000-21762 |
| Jun 12, 2026 | Bldg-Alter/Repair: **2025 Wildfire**Supplemental to 24014-10000-03190. Add roof deck over first-floor area | Dwelling - Single Family | $15,000 | — | 24014-10003-03190 |
| Apr 7, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___24___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B | Duplex | $83,000 | — | 26016-10000-09081 |
| Mar 12, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 60 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $50,000 | — | 25016-10000-06868 |
Plumbing: 4 permits
From Jun 8, 2020 to Aug 31, 2022. Fewer than 5 plumbing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 6, 2024, 0 listed below. Earlier permits, 4, are on their house pages: 2022: 2 · 2021: 1 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Heating and cooling: 2 permits
From Aug 13, 2025 to May 4, 2026. Fewer than 5 heating and cooling permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| May 4, 2026 | Bldg-Alter/Repair: Units 305,306,405,406,505,506: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B. Re-stucco for residential buildings | Apartment | $14,500 | — | 26016-20000-11743 |
| Aug 13, 2025 | Bldg-Alter/Repair: 5 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $1,250 | — | 25016-90000-24538 |
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 6, 2026. Storm dates touching this street will appear here once the hail record is attached.