Permits Index
6
Permits, 24 months
11 on record
8
Roofing permits
Aug 26, 2026
Last permit issued
10
Addresses with a page

Roofing: 8 permits

From Nov 24, 2020 to Aug 26, 2026. Fewer than 5 roofing permits since October 7, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 7, 2024, 5 listed below. Earlier permits, 3, are on their house pages: 2023: 1 · 2021: 1 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 26, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—26016-90000-22880
Jul 11, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,600—26016-90000-18303
Feb 5, 2026Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO CHANGE WORK DESCRIPTION TO: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family——26016-20001-02578
Jan 28, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,600—26016-90000-02578
Feb 17, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$4,400—25016-90000-04347

Heating and cooling: 3 permits

From May 22, 2024 to Sep 23, 2025. Fewer than 5 heating and cooling permits since October 7, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 7, 2024, 1 listed below. Earlier permits, 2, are on their house pages: 2024: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 23, 2025Bldg-Alter/Repair: 1 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$501—25016-90000-28532

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 7, 2026. Storm dates touching this street will appear here once the hail record is attached.