Permits Index
3
Permits, 24 months
5 on record
3
Roofing permits
Aug 27, 2026
Last permit issued
4
Addresses with a page

Roofing: 3 permits

From Aug 31, 2020 to Nov 21, 2024. Fewer than 5 roofing permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 1 listed below. Earlier permits, 2, are on their house pages: 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Nov 21, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMiscellaneous Bldg/Structure$1,200โ€”24016-90000-37184

Heating and cooling: 2 permits

From Mar 3, 2026 to Aug 27, 2026. Fewer than 5 heating and cooling permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 27, 2026Bldg-Alter/Repair: Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDuplex$8,000โ€”26016-20000-22947
Mar 3, 2026Bldg-Alter/Repair: Window and Door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24.Re-stucco for residential buildingsCondo-Multi Family$20,349โ€”26016-10000-05717

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 5, 2026. Storm dates touching this street will appear here once the hail record is attached.