Permits Index
6
Permits, 24 months
13 on record
11
Roofing permits
Sep 1, 2026
Last permit issued
12
Addresses with a page

Roofing: 11 permits

From Oct 27, 2020 to Sep 1, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 7, are on their house pages: 2024: 2 · 2023: 3 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$10,500—26016-90000-23405
May 13, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing_4_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149 . FOR DETACHED GARAGEDwelling - Single Family$1,200—26016-10000-12727
Aug 22, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overnew solid sheathing Squares. Class A roof covering is required within Very HighFireHazard Severity Zone . For residential roof replacement > 50% of the total roof area,apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roofmay be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$10,900—25016-20000-25486
Aug 13, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _80_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDuplex$7,600—25016-10000-24365

Heating and cooling: 2 permits

From May 14, 2025 to Jun 20, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 20, 2025Bldg-Alter/Repair: Kitchen/bathroom remodel for residential buildings . Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24. Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$11,800—25016-20000-19409
May 14, 2025Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings . Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24. Kitchen/ bathroom remodel for residential buildingsDuplex$11,800—25016-10000-14835

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.