9
Permits, 24 months
28 on record
20
Roofing permits
Sep 15, 2026
Last permit issued
27
Addresses with a page

Roofing: 20 permits

From Jan 15, 2020 to Sep 15, 2026. Across 7 roofing permits since October 2, 2024, most declared values run from $3,440 to $7,860 (the middle 80%); the median is $5,600 and half fall between $4,300 and $7,250. The lowest on record is $2,600 and the highest $8,400.

Since October 2, 2024, 7 listed below. Earlier permits, 13, are on their house pages: 2024: 3 · 2023: 3 · 2022: 1 · 2021: 2 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 15, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,600—26016-90000-24963
Apr 27, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,000—26016-90000-11065
Apr 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,600—26016-90000-08563
Feb 27, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$8,400—26016-90000-05455
Feb 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—26016-90000-04825
Jan 14, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 13 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,600—26016-90000-01197
Jul 31, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing_26_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDwelling - Single Family$7,500—25016-10000-23400

Heating and cooling: 7 permits

From Jan 7, 2020 to Jul 25, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 2 listed below. Earlier permits, 5, are on their house pages: 2024: 1 · 2022: 1 · 2021: 1 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 25, 2025Bldg-Alter/Repair: Window Residential Only change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windowsreplaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Condo-Single Family$3,400—25016-20000-22800
Dec 2, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.27 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$11,950—24016-90000-38103

Plumbing: 1 permit

From Mar 3, 2022 to Mar 3, 2022. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.