Permits Index
6
Permits, 24 months
17 on record
15
Roofing permits
Sep 25, 2026
Last permit issued
14
Addresses with a page

Roofing: 15 permits

From Sep 7, 2020 to Sep 25, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 11, are on their house pages: 2024: 4 · 2023: 1 · 2021: 5 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 25, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __52__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$26,500—26016-10000-26349
Jan 5, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—26016-90000-00220
Mar 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_75_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BApartment$49,000—25016-30000-06362
Oct 7, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$5,000—24016-90000-32130

Heating and cooling: 2 permits

From Feb 3, 2025 to Jan 29, 2026. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jan 29, 2026Bldg-Alter/Repair: 2 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$501—26016-90000-02686
Feb 3, 2025Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$1,000—25016-30000-02905

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.