Permits Index
27
Permits, 24 months
107 on record
89
Roofing permits
Sep 1, 2026
Last permit issued
84
Addresses with a page

Roofing: 89 permits

From May 8, 2020 to Aug 3, 2026. Across 23 roofing permits since October 3, 2024, most declared values run from $1,200 to $8,760 (the middle 80%); the median is $4,200 and half fall between $2,700 and $6,950. The lowest on record is $501 and the highest $29,000.

Since October 3, 2024, 24 listed below. Earlier permits, 65, are on their house pages: 2024: 9 · 2023: 22 · 2022: 9 · 2021: 17 · 2020: 8.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,800—26016-90000-20410
Aug 2, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,400—26016-90000-20313
May 5, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 145 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$29,000—26016-90000-11846
Feb 6, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 7 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$1,400—26016-90000-03563
Jan 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$5,700—26016-90000-00087
Nov 12, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,400—25016-90000-33525
Oct 31, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,200—25016-90000-32687
Oct 23, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 38 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,600—25016-90000-31767
Oct 20, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,800—25016-90000-31205
Sep 13, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$1,200—25016-90000-27685
Sep 13, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,200—25016-90000-27684
Sep 3, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,700—25016-90000-26642
Aug 26, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 43 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$8,600—25016-90000-25807
Aug 12, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___30___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDwelling - Single Family$14,000—25016-70000-24455
Jun 27, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 44 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$8,800—25016-90000-20441
Jun 4, 2025Bldg-Alter/Repair: SUPPLEMENTAL PERMIT FOR 22016-20000-35501 TO REMOVE 800SF RECREATION ROOM ADDT'N FROM SCOPE OF WORK & REVISE ROOF **Duplex$501—22016-10002-35501
May 19, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 11 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,200—25016-90000-16411
May 13, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,200—25016-90000-15695
May 13, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 4 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$800—25016-90000-15694
Apr 18, 2025Bldg-Alter/Repair: Supplemental permit to 25016 - 90000 - 11387 to revise work description to read: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over _NEW_ solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family——25016-20001-11387
Apr 11, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,600—25016-90000-11387
Jan 27, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMiscellaneous Bldg/Structure$6,400—25016-90000-02285
Nov 20, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,500—24016-90000-37142
Nov 13, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 3 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Remove existing roof tiles, apply new underlayment and reset roof tilesApartment$1,200—24016-90000-36252

Heating and cooling: 14 permits

From Feb 27, 2020 to Sep 1, 2026. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 2 listed below. Earlier permits, 12, are on their house pages: 2024: 2 · 2023: 4 · 2022: 2 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 1, 2026Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24.Replacement of damaged framing members for houses andduplexesDwelling - Single Family$3,000—26016-10000-23495
Jan 3, 2026Bldg-Alter/Repair: 14 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Replacement of damaged framing members for single family dwellings and duplexDwelling - Single Family$4,100—26016-90000-00089

Plumbing: 3 permits

From Mar 24, 2021 to Feb 28, 2023. Fewer than 5 plumbing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 0 listed below. Earlier permits, 3, are on their house pages: 2023: 1 · 2021: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Water heater: 1 permit

From Apr 2, 2025 to Apr 2, 2025. Fewer than 5 water heater permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 2, 2025Bldg-Alter/Repair: EPLAN Supplemental to 24014-10000-03484 to revise plans and title 24. Change the gas water heater to electric from the original approved planAccessory Dwelling Unit$501—24014-10001-03484

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.