Permits Index
4
Permits, 24 months
13 on record
10
Roofing permits
Sep 25, 2026
Last permit issued
13
Addresses with a page

Roofing: 10 permits

From Jan 9, 2020 to Sep 25, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 6, are on their house pages: 2024: 2 · 2023: 1 · 2021: 1 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 25, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—26016-90000-26326
Aug 20, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over NEW solid sheathing ___4__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,500—26016-10000-22235
Jan 31, 2025Bldg-Alter/Repair: Re-stucco for residential buildings. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing __10__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDuplex$5,000—25016-10000-02843
Nov 13, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Replacement of damaged framing members for single family dwellings and duplexDwelling - Single Family$5,701—24016-90000-36336

Heating and cooling: 2 permits

From Dec 21, 2020 to Oct 25, 2023. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Plumbing: 1 permit

From Jan 17, 2020 to Jan 17, 2020. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.