17
Permits, 24 months
46 on record
33
Roofing permits
Oct 2, 2026
Last permit issued
41
Addresses with a page

Roofing: 33 permits

From Sep 8, 2020 to Oct 2, 2026. Across 14 roofing permits since October 6, 2024, most declared values run from $2,980 to $63,000 (the middle 80%); the median is $21,000 and half fall between $6,475 and $28,525. The lowest on record is $1,800 and the highest $99,800.

Since October 6, 2024, 15 listed below. Earlier permits, 18, are on their house pages: 2024: 6 · 2023: 4 · 2022: 5 · 2021: 2 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Oct 2, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_86_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$22,500—26016-10000-27204
Oct 2, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_86_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$22,500—26016-10000-27203
Sep 29, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,400—26016-90000-26652
Sep 25, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___82__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$19,500—26016-10000-26343
Sep 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __160__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BRetail$75,000—26016-10000-25953
Sep 9, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___40___Squares. Class A roof covering is required within Very High Fire Hazard SeverityZone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BRetail$30,000—26016-30000-24267
Jul 11, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,800—26016-90000-18312
Apr 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$35,000—26016-20000-10737
Jan 28, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing __49____Squares. Class A roof covering is required withinVery High Fire Hazard Severity Zone . For residential roof replacement >50% of the total roof area, apply Cool Roof Product labeled and certified by Cool RoofRating Council . Cool Roof may be required for non-residential buildings perTitle 24, Part 6, Section 141.0 2BApartment$18,000—26016-20000-02603
Jan 8, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$1,800—26016-90000-00596
Aug 20, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___94___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BChurch$99,800—25016-10000-25106
Aug 19, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over NEW solid sheathing __14__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B. **DETACHED GARAGE INCLUDED**Dwelling - Single Family$8,500—25016-10000-25132
Jun 3, 2025Bldg-Alter/Repair: Supplemental permit to 21016 - 10000 - 07120 for transfer of permit from ACE ROOFING SYSTEMS, license #646787 to BRANDI LYNN POWELL ROOFING, license #1059295Apartment——21016-20001-07120
May 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 29 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,800—25016-90000-15351
May 6, 2025Bldg-Alter/Repair: units: 201,208,209,212,213,214,215-Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _41_ squares. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$24,100—25016-20000-14685

Heating and cooling: 7 permits

From Sep 8, 2021 to Dec 4, 2024. Fewer than 5 heating and cooling permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 1 listed below. Earlier permits, 6, are on their house pages: 2024: 2 · 2023: 1 · 2021: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Dec 4, 2024Bldg-Alter/Repair: 2 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24Apartment$2,412—24016-10000-38286

Plumbing: 5 permits

From Mar 31, 2021 to Sep 10, 2026. Fewer than 5 plumbing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 1 listed below. Earlier permits, 4, are on their house pages: 2023: 1 · 2022: 2 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 10, 2026Bldg-Demolition: DEMO OF EXISTING DETACHED GARAGE. SEWER CAP AND PEDESTRIAN PROTECTION FENCE REQUIREDDemolition$4,000—26019-30000-02323

Solar: 1 permit

From Feb 2, 2022 to Feb 2, 2022. Fewer than 5 solar permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page