Permits Index
5
Permits, 24 months
29 on record
20
Roofing permits
Sep 3, 2026
Last permit issued
27
Addresses with a page

Roofing: 20 permits

From Jan 6, 2020 to Sep 3, 2026. Fewer than 5 roofing permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 4 listed below. Earlier permits, 16, are on their house pages: 2023: 8 · 2022: 6 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing ___12___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$7,000—26016-10000-23787
Feb 4, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 36 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$7,200—26016-90000-03332
Nov 26, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 37 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BApartment$21,000—24016-10000-37633
Oct 21, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 13 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$2,600—24016-90000-33681

Plumbing: 6 permits

From Feb 6, 2020 to Jun 9, 2023. Fewer than 5 plumbing permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 0 listed below. Earlier permits, 6, are on their house pages: 2023: 1 · 2022: 1 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 2 permits

From Nov 2, 2022 to Oct 9, 2025. Fewer than 5 heating and cooling permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Oct 9, 2025Bldg-Alter/Repair: 1 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$1,500—25016-10000-30103

Electrical: 1 permit

From May 8, 2020 to May 8, 2020. Fewer than 5 electrical permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 5, 2026. Storm dates touching this street will appear here once the hail record is attached.