Permits Index
3
Permits, 24 months
4 on record
4
Roofing permits
Sep 6, 2026
Last permit issued
3
Addresses with a page

Roofing: 4 permits

From Oct 21, 2020 to Sep 6, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 3 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 6, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 36 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,200—26016-90000-23981
Aug 12, 2026Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO #26016-90000-20474 TO REVISE WORK DESCRIPTION TO READ:Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing 46 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Replacement of damaged framing members for single family dwellings and duplex .Remove existing roof tiles, apply new underlayment and reset roof tilesDwelling - Single Family——26016-20001-20474
Aug 4, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 4 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Replacement of damaged framing members for single family dwellings and duplex .Remove existing roof tiles, apply new underlayment and reset roof tilesDwelling - Single Family$9,200—26016-90000-20474

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.