Permits Index
78
Permits, 24 months
229 on record
192
Roofing permits
Sep 24, 2026
Last permit issued
207
Addresses with a page

Roofing: 192 permits

From Mar 1, 2020 to Sep 24, 2026. Across 69 roofing permits since October 4, 2024, most declared values run from $3,200 to $71,482 (the middle 80%); the median is $6,400 and half fall between $4,400 and $19,500. The lowest on record is $1,500 and the highest $800,000.

Since October 4, 2024, 71 listed below. Earlier permits, 121, are on their house pages: 2024: 15 · 2023: 39 · 2022: 21 · 2021: 24 · 2020: 22.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 24, 2026Bldg-Alter/Repair: DEFERRED SUBMITTAL TO 23010-10000-02585. Roof Access LadderApartment——23010-20009-02585
Sep 21, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solidsheathing __15____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BDwelling - Single Family$15,000—26016-20000-25591
Sep 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—26016-90000-25517
Sep 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$3,400—26016-90000-25500
Sep 5, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—26016-90000-23962
Aug 25, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BChurch$3,200—26016-90000-22669
Aug 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,200—26016-90000-21907
Aug 16, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Replacement of damaged framing members for single family dwellings and duplexDwelling - Single Family$17,600—26016-90000-21704
Aug 10, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,200—26016-90000-21113
Jul 28, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 12 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,400—26016-90000-19920
Jul 28, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __40_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B. With attached carportApartment$14,000—26016-30000-19896
Jun 30, 2026Bldg-Alter/Repair: TENANT IMRPOVEMENT TO EXPAND PHARMACY SECTION WITH NEW RACKING, CONVERT SMILE DIRECT ROOM TO CONSULT ROOM, REPLACE RTU ON ROOFRetail$186,879—26016-30000-02714
Jun 3, 2026Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO #26016-90000-12722 TO REVISE WORK DESCRIPTION TO: "Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over NEW solid sheathing __27__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B. "Dwelling - Single Family——26016-10001-12722
May 13, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 27 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,400—26016-90000-12722
May 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing 14 Squares. Class A roof covering is required withinVery High Fire Hazard Severity Zone . For residential roof replacement >50% of the total roof area, apply Cool Roof Product labeled and certified by Cool RoofRating Council . Cool Roof may be required for non-residential buildings perTitle 24, Part 6, Section 141.0 2BApartment$71,482—26016-30000-11553
May 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing __14____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BDwelling - Single Family$71,482—26016-20000-11556
May 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$71,482—26016-10000-11577
May 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$71,482—26016-10000-11575
May 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$71,482—26016-10000-11566
May 1, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$71,482—26016-10000-11561
Apr 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—26016-90000-10974
Apr 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing 14 Squares. Class A roof covering is required withinVery High Fire Hazard Severity Zone . For residential roof replacement >50% of the total roof area, apply Cool Roof Product labeled and certified by Cool RoofRating Council . Cool Roof may be required for non-residential buildings perTitle 24, Part 6, Section 141.0 2BApartment$71,482—26016-30000-10870
Apr 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$71,482—26016-20000-10746
Apr 21, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—26016-90000-10520
Apr 21, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_120_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Apartment$170,000—26016-70000-10448
Mar 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,200—26016-90000-07776
Feb 20, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares . Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Apartment$10,000—26016-10000-03901
Feb 10, 2026Bldg-Alter/Repair: T. I. TO 1,400 SF RESTAURANT: CONSIST OF REMOVAL & INSTALL OF NON-BEARING WALLS AND T-BAR CEILINGS, INSTALL BATHROOM, KITCHEN, NEW WALK-IN FREEZER AND COOLER, ANCHORAGE FOR NEW HOOD AND ROOF EQUIPEMENT _Restaurant$134,000—25016-20000-23951
Feb 4, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 29 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,800—26016-90000-03344
Feb 2, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 38 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BManufacturing$7,600—26016-90000-02944
Jan 27, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGas Station$2,800—26016-90000-02477
Jan 22, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___120___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BApartment$110,000—26016-30000-02036
Jan 5, 2026Bldg-Alter/Repair: Exterior Alteration to remove unenclosed roof canopy and exterior patch and repair at canopy removal . **see comments**Bank$10,000—25016-20000-35961
Dec 26, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$8,000—25016-90000-37671
Dec 25, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—25016-90000-37645
Dec 9, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGas Station$6,400—25016-90000-36075
Dec 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,400—25016-90000-35811
Dec 2, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—25016-90000-35364
Oct 17, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$1,800—25016-90000-31011
Oct 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$1,800—25016-90000-30040
Oct 1, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$8,000—25016-90000-29449
Sep 19, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$36,000—25016-20000-28320
Sep 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 41 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGas Station$8,200—25016-90000-27417
Aug 13, 2025Bldg-Alter/Repair: TENANT IMPROVEMENT & CHANGE OF USE OF EXISTING RETAIL TO RESTAURANT & ADD OPEN PATIO SEATING AREA ; ADD NEW ROOF EQUIPMENTRestaurant$450,000—23016-20000-37656
Aug 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,200—25016-90000-24089
Jul 28, 2025Bldg-Alter/Repair: <ePLAN>TENANT IMPROVEMENT TO BANK LOCATION INCLUDING, SEISMIC UPGRADE, UPDATED ROOF, STOREFRONT ENTRY MODIFICATION, AND ACCESSIBILITY UPGRADES AT RESTROOMS."COMPLY WITH DEPARTMENT ORDER effective date10/08/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Bank$800,000—24016-20000-10922
Jul 23, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—25016-90000-22598
Jul 18, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,200—25016-90000-22241
Jun 24, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 27 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,400—25016-90000-20029
Jun 4, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—25016-90000-18136
May 15, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BRetail$29,750—25016-10000-16053
May 12, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,200—25016-90000-15436
Apr 23, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,600—25016-90000-13008
Apr 11, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$7,000—25016-90000-11446
Apr 8, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,600—25016-90000-10305
Apr 5, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,600—25016-90000-10464
Apr 5, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,600—25016-90000-10462
Mar 28, 2025Bldg-Alter/Repair: Supplemental to 22016-10000-35374 to change the mailroom to a part of the reception area, to change the double doors near stair #2 & 3 to a signle doors, to remove the proposed roof access ladder near stair #3, and to relocate the door #117 & 157. No exterior changesMotion Picture Studio$5,000—22016-20006-35374
Mar 18, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _18_ squares. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$19,500—25016-20000-07648
Mar 17, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BOffice$4,000—25016-90000-07433
Mar 8, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 5 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$1,500—25016-90000-06464
Mar 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,600—25016-90000-06430
Mar 5, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMedical Office$2,800—25016-90000-06153
Jan 20, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,400—25016-90000-01513
Jan 20, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,400—25016-90000-01512
Dec 26, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 27 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$8,100—24016-90000-40398
Dec 4, 2024Bldg-Alter/Repair: ePlan. Repair roof mansard at apartment buildingApartment$10,000—24016-20000-35705
Nov 28, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,200—24016-90000-37888
Nov 20, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—24016-90000-37052
Nov 14, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 39 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BChurch$7,800—24016-90000-36573
Oct 28, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very High FireHazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council .Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section141.0 2BApartment$30,000—24016-20000-34331

Heating and cooling: 17 permits

From Jan 23, 2020 to Mar 4, 2026. Across 6 heating and cooling permits since October 4, 2024, most declared values run from $3,250 to $24,150 (the middle 80%); the median is $4,460 and half fall between $4,001 and $7,455. The lowest on record is $2,500 and the highest $40,000.

Since October 4, 2024, 6 listed below. Earlier permits, 11, are on their house pages: 2023: 4 · 2022: 1 · 2021: 1 · 2020: 5.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 4, 2026Bldg-Alter/Repair: Window and door change-out (same size & type) for residential buildings. Dual glazing,labeled and certified by National Fenestration Rating Council , is required for doorsand windows replaced in all residential buildings, three stories or less, per Title 24, Part 6,Section 150.2 1B. "COMPLY WITH DEPARTMENT ORDER effective date 03/02/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Dwelling - Single Family$4,000—26016-20000-05831
Feb 11, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 13 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.10 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.1 bathroom .Bathroom remodel for residential buildings .Kitchen remodel for residential buildingsDwelling - Single Family$8,300—26016-90000-03913
Feb 9, 2026Bldg-Alter/Repair: 7 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Sandblast/restucco over existing stucco to remain. Area = 1056 sqftDwelling - Single Family$4,918—26016-90000-03656
Jan 9, 2026Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BApartment$2,500—26016-20000-00781
Mar 21, 2025Bldg-Alter/Repair: Supplemental permit to 24016-20000-14534 to add HVAC unit to the roofRetail$40,000—24016-20001-14534
Jan 7, 2025Bldg-Alter/Repair: 1 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Re-stucco for residential buildings. Area = 160 sqft.1 bathroom .Bathroom remodel for residential buildings .Kitchen remodel for residential buildingsDwelling - Single Family$4,002—25016-90000-00457

Solar: 11 permits

From Aug 18, 2020 to Jun 3, 2026. Fewer than 5 solar permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 1 listed below. Earlier permits, 10, are on their house pages: 2022: 4 · 2021: 3 · 2020: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 3, 2026Bldg-Alter/Repair: eplan: ATT is proposing a modification to an existing wireless facility: REMOVE AIR6449 B77D INSTALL NEW AIR6472 B77M B77G ANTENNAS REMOVE EXISTING RRUS-32 B66A INSTALL NEW RRU 4890 ALPHA RRU 32 B30 RELOCATE TO SXK1255394_2 BETA AND GAMMA FRP REDESIGN INSTALL -58v CONVERSION KIT FOR NS7100 BATTERY DISCONNECT BREAKERS AT 100 AMPS;UPGRADE TO 200AMPS INSTALL COMMSCOPE 48v/24v DC CONVERTOR/PS-CONV-48-24 REMOVE R48-2000e3 13 TOTAL INSTALL C48/58-2000P3 REMOVE C48/24-1500 REMOVE UP-CONVERTORSTelecommunication Transmitter - wireless$30,000—25016-20000-27669

Plumbing: 8 permits

From Mar 9, 2020 to Apr 12, 2024. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 8, are on their house pages: 2024: 2 · 2022: 3 · 2020: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Electrical: 1 permit

From Dec 2, 2022 to Dec 2, 2022. Fewer than 5 electrical permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.