IssuedWorkBuildingDeclared valueContractor as filedPermit
Feb 20, 2026Roof/Re-Roof: RE-ROOF PER CMC FEB 2026 PERMIT REPORTResidential$15,000NOT GIVEN26-02-00912
Apr 1, 2025Miscellaneous: ROOF, PER APRIL 2025 CMC PERMIT REPORTResidential$37,550NOT GIVEN25-04-01570
Oct 28, 2024Roof/Re-Roof: REROOF PER 10/24 PERMIT REPORTResidential$41,883NOT GIVEN24-10-05506

Heating and cooling: 10 permits

From Jun 11, 2024 to Jul 30, 2026. Across 5 heating and cooling permits since October 3, 2024, most declared values run from $8,200 to $17,147 (the middle 80%); the median is $11,750 and half fall between $8,500 and $13,900. The lowest on record is $8,000 and the highest $19,312. Filed by NOT GIVEN (9), NOT LISTED.

Since October 3, 2024, 5 listed below. Earlier permits, 5, are on their house pages: 2024: 5.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 30, 2026Miscellaneous: HVAC PER CMC JULY 2026 PERMIT REPORTResidential$8,500NOT GIVEN26-07-04052
Jun 10, 2026Miscellaneous: REPLACE 4 TON GAS HVAC UNIT PER CMC JUNE 2026 PERMIT REPORTResidential$19,312NOT GIVEN26-06-03130
Mar 24, 2026Miscellaneous: INSTALLATION OF HVAC SYSTEM PER CMC MAR 2026 PERMIT REPORTResidential$13,900NOT GIVEN26-03-01481
May 22, 2025Miscellaneous: PER MAY 2025 MCKINNEY PERMIT REPORT: CHANGE OUT HVAC EQUIPMENTResidential$11,750NOT LISTEDRES2025-05-02548
Apr 4, 2025Miscellaneous: CHANGE OUT EXISITNG INDOOR COOLING COIL AND OUTSIDE CONDENSING UNIT, PER APRIL 2025 CMC PERMIT REPORTResidential$8,000NOT GIVEN25-04-01627

Plumbing: 3 permits

From Dec 18, 2023 to Jan 22, 2025. Fewer than 5 plumbing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN (3).

Since October 3, 2024, 2 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jan 22, 2025Miscellaneous: PLUMBING- 10FT INSIDE TUNNEL THROUGH CONCRETE IN GARAGE TO REPAIR A WATER LEAK PER CMCM 1/25 PERMIT REPORTResidential$7,755NOT GIVEN25-01-00292
Jan 21, 2025Miscellaneous: PLUMBING- 1 STORY HOT WATER RE-ROUTE PER CMC 1/25 PERMIT REPORTResidential$4,000NOT GIVEN25-01-00245

Solar: 1 permit

From Dec 6, 2023 to Dec 6, 2023. Fewer than 5 solar permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below. Filed by NOT GIVEN.

Since October 3, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Collin Central Appraisal District building permits, Texas open data, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.