Bartlett St, San Francisco: permits on record
51 home-service permits on record on Bartlett St since February 4, 2015, 10 of them since October 2, 2024, at 42 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 29 permits
From Feb 4, 2015 to Apr 29, 2026. Across 7 roofing permits since October 2, 2024, most declared values run from $8,600 to $35,680 (the middle 80%); the median is $15,989 and half fall between $10,000 and $24,400. The lowest on record is $8,000 and the highest $47,500.
Since October 2, 2024, 7 listed below. Earlier permits, 22, are on their house pages: 2024: 2 · 2023: 2 · 2022: 2 · 2021: 4 · 2020: 2 · 2019: 2 · 2018: 2 · 2017: 2 · 2016: 2 · 2015: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Apr 29, 2026 | ReRoof: re-roofing: shingle roof replacement of 11 sq tear off, replace wood as needed synthetic underlayment, no hot works | 2 family dwelling | $9,000 | — | 202604290334 |
| Nov 14, 2025 | ReRoof: reroofing, no torch down | 2 family dwelling | $8,000 | — | 202511149614 |
| Aug 12, 2025 | ReRoof: re-roof. hot work. tear off and disposal of existing roofing material. install 20 sq. ft. of roof using torch down | apartments | $11,000 | — | 202508122804 |
| May 27, 2025 | ReRoof: re-roofing with hot works | apartments | $21,000 | — | 202505096135 |
| Mar 19, 2025 | ReRoof: reroofing-no hot works/torch down | apartments | $47,500 | — | 202503192561 |
| Dec 5, 2024 | ReRoof: reroofing | apartments | $15,989 | — | 202412046139 |
| Nov 15, 2024 | ReRoof: re-roofing: remove and replace roofing material / existing roofing material | 1 family dwelling | $27,800 | — | 202411155157 |
Electrical: 8 permits
From Apr 29, 2015 to Jan 30, 2025. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 7, are on their house pages: 2022: 2 · 2020: 1 · 2019: 1 · 2017: 1 · 2015: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jan 30, 2025 | otc alterations permit: install ev chargers for assigned parking , install 50a/240v two pole circuit breakers on 125 amp house panel. install concrete wheel stops, bollards, or other ah requried protection for evse | apartments | $13,000 | — | 202501289218 |
Plumbing: 6 permits
From Nov 30, 2017 to Sep 17, 2025. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 5, are on their house pages: 2024: 2 · 2018: 2 · 2017: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 17, 2025 | otc alterations permit: unit 202: bathroom remodel to include electrical and plumbing. hoa will complete drywall, waterproofing, subfloors and flooring install | apartments | $30,192 | — | 202509165411 |
Water heater: 3 permits
From Apr 14, 2015 to Jan 24, 2022. Fewer than 5 water heater permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 3, are on their house pages: 2022: 1 · 2019: 1 · 2015: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Heating and cooling: 3 permits
From Mar 31, 2017 to Apr 16, 2021. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 3, are on their house pages: 2021: 1 · 2018: 1 · 2017: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Solar: 2 permits
From Nov 4, 2020 to Mar 11, 2026. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Mar 11, 2026 | solar permit: installing 20 solar pv modules, 440 watts per module, total no. of rating 8.8 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 15 kwh each in capacity, ess units will not be closer than 3 feet | residential roof-mount solar pv | — | $24,000 | — | S20260224486 |
Addresses on this street with a page
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.