Permits Index
5
Permits, 24 months
9 on record
2
Roofing permits
Apr 28, 2026
Last permit issued
6
Addresses with a page

Roofing: 2 permits

From Jan 7, 2025 to Mar 16, 2026. Fewer than 5 roofing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 16, 2026ReRoof: reroofing; tear off to deck replace with 1/4 densdeck- no hot worksapartments$12,688—202603167587
Jan 7, 2025ReRoof: re-roofing: remove and replace roofing material / existing roofing material2 family dwelling$26,400—202501077814

Solar: 2 permits

From Jan 20, 2026 to Apr 28, 2026. Fewer than 5 solar permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 28, 2026solar permit: installing 22 solar pv modules, 410 watts per module, total no. of rating 9.02 kw. mounted: roof, ballasted: n | revision to : s20251223411 residential roof mount pv system. system size: 9.020 kwp. 22 modules. 1 solaredge inverter. 22 optimizers2 family dwelling$34,144—S20260414564
Jan 20, 2026solar permit: installing 22 solar pv modules, 410 watts per module, total no. of rating 9.02 kw. mounted: roof, ballasted: n | revision to e20250902524. system size: 9.020 kwp. 22 modules. 1 solaredge inverter. 22 enphase optimizers—$34,144—S20251223411

Plumbing: 2 permits

From Sep 9, 2016 to Jan 28, 2026. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2016: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jan 28, 2026otc alterations permit: remodel condo to include change of front entry door, add custom window at rear, replace interior plumbing and electrical fixtures in kind. add window at rear to replace sliding door. no structural changes1 family dwelling$135,291—202601123647

Electrical: 1 permit

From Mar 23, 2023 to Mar 23, 2023. Fewer than 5 electrical permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 1 permit

From Jun 7, 2022 to Jun 7, 2022. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Water heater: 1 permit

From Jun 7, 2021 to Jun 7, 2021. Fewer than 5 water heater permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.