Mullen Ave, San Francisco: permits on record
31 home-service permits on record on Mullen Ave since September 16, 2015, 5 of them since October 2, 2024, at 24 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 25 permits
From Aug 12, 2016 to Jun 24, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 3 listed below. Earlier permits, 22, are on their house pages: 2024: 2 · 2023: 9 · 2022: 1 · 2021: 2 · 2019: 1 · 2018: 3 · 2017: 1 · 2016: 3.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jun 24, 2026 | otc alterations permit: 4x8 roof section repair due to fire damage. repairs to framing and sheathing in kind. reroof under seperate permit 202606113041 | 1 family dwelling | $2,000 | — | 202606243804 |
| Jun 11, 2026 | ReRoof: re-roofing: remove and replace roofing material / existing roofing material | 2 family dwelling | $13,000 | — | 202606113041 |
| Apr 8, 2025 | additions alterations or repairs: add 95 sq ft bedroom to the rear of the home with the replacement of the adjacent membrane roof.home is 925 sq ft,2 bed/1bath.no changes are proposed to the basement or detached garage.addition will not be visible from the public right of way,no changes to front or overall bldg height | 1 family dwelling | $54,069 | — | 202212299434 |
Electrical: 4 permits
From Sep 16, 2015 to Nov 17, 2025. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 3, are on their house pages: 2022: 1 · 2017: 1 · 2015: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Nov 17, 2025 | otc alterations permit: interior remodel of 1st and 2nd floor. reconfigure interior walls and layout . add full bathroom relocate laundry add gas fau, electrical main panel upgrade, lighting, repalce windows visible from street | 1 family dwelling | $475,959 | — | 202508294187 |
Heating and cooling: 1 permit
From Sep 11, 2025 to Sep 11, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 11, 2025 | otc alterations permit: interior renovation of bathroom area, laundry area, and bedroom closet on 2nd floor. repair hvac | 1 family dwelling | $40,000 | — | 202508082670 |
Plumbing: 1 permit
From Nov 24, 2021 to Nov 24, 2021. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.