Permits Index
6
Permits, 24 months
29 on record
21
Roofing permits
Jul 16, 2026
Last permit issued
22
Addresses with a page

Roofing: 21 permits

From Oct 15, 2015 to Feb 25, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 17, are on their house pages: 2024: 4 · 2023: 1 · 2022: 1 · 2021: 4 · 2019: 2 · 2018: 3 · 2015: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Feb 25, 2026ReRoof: re-roofing: remove and replace roofing material / existing roofing material2 family dwelling$12,000—202602256452
Feb 25, 2025ReRoof: re-roofing: remove and replace roofing material / existing roofing material2 family dwelling$30,000—202502251069
Dec 10, 2024ReRoof: re-roofing: remove and replace roofing material / existing roofing material2 family dwelling$10,000—202412106561
Oct 11, 2024ReRoof: reroofing1 family dwelling$14,000—202410082590

Plumbing: 2 permits

From Jan 24, 2019 to Sep 27, 2024. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2024: 1 · 2019: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Electrical: 2 permits

From Aug 11, 2021 to Nov 30, 2021. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2021: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Water heater: 2 permits

From Jan 31, 2018 to Jul 1, 2019. Fewer than 5 water heater permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2019: 1 · 2018: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Solar: 1 permit

From Jul 16, 2026 to Jul 16, 2026. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 16, 2026solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of ess paired with existing pv system. energy storage system includes: tesla backup switch, tesl2 family dwelling$19,000—S20260622658

Heating and cooling: 1 permit

From Jul 6, 2026 to Jul 6, 2026. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 6, 2026otc alterations permit: revision to #20210819674: convert closet into bath & reconfigure kitchen, fmaily room on 2/f. reconfigure staircase between 1/f & 2/f. add family room w/ wetbar on 1/f. relocate laundry, furnace, wh, & sump pumps. update applicable building code from 2019 to 2025.extr stucco 50%<s/ly facade1 family dwelling$1—202602236348

Addresses on this street with a page

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.