Presidio Trl, San Francisco: permits on record
23 home-service permits on record on Presidio Trl since March 29, 2016, 7 of them since October 3, 2024, at 17 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 15 permits
From Jul 24, 2018 to Jul 2, 2026. Fewer than 5 roofing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 3, 2024, 4 listed below. Earlier permits, 11, are on their house pages: 2024: 3 · 2023: 1 · 2022: 2 · 2021: 1 · 2019: 2 · 2018: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jul 2, 2026 | additions alterations or repairs: interior alteration of sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade foundation, exterior work to include: install new site drainage, replace skylight with new. repair roof & gutters, provide new egress | 1 family dwelling | $1,500,000 | — | 202506037782 |
| Jul 11, 2025 | ReRoof: reroofing - tear off. apply one layer of diamond deck underlayment, install composition shingle in kind. pitch roof. no hot work. no work to roof structural sheathing | 1 family dwelling | $66,000 | — | 202507110636 |
| Feb 7, 2025 | otc alterations permit: voluntary replacement in kind of existing dryrotted roof deck guard railing with new structural steel reinforced guard railing with exterior cladding to match existing exactly | 1 family dwelling | $20,000 | — | 202502079935 |
| Oct 16, 2024 | ReRoof: re-roofing | 1 family dwelling | $75,750 | — | 202410163019 |
Plumbing: 4 permits
From Dec 16, 2022 to Jul 15, 2025. Fewer than 5 plumbing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 3, 2024, 2 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2022: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jul 15, 2025 | otc alterations permit: bathroom remodel to include removal of vanity, plumbing fixtures and light fixtures at 1st floor. install vanity , light and plumbing fixtures in kind no wall removal or layout change | 1 family dwelling | $70,000 | — | 202507150844 |
| Mar 28, 2025 | additions alterations or repairs: excavate existing crawl spaces withink existing bldg basement garage to match existing garage floor level. new foundation and structural framing as reqiuired. no change to the conditioned spaces or exterior of the residence. mech, elect and plumb under sep permit | 1 family dwelling | $300,000 | — | 202403157975 |
Heating and cooling: 3 permits
From May 6, 2024 to Sep 23, 2026. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 3, 2024, 1 listed below. Earlier permits, 2, are on their house pages: 2024: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 23, 2026 | otc alterations permit: revision to 202606042559, int remodel @ all floors. add bathroom @ 2nd fl, remodel primary closet. add laundry room @ 2nd flr. new lighting & electrical throughout. remove 2 interior stairs. new hvac @ 3rd floor. also, revise scope of work for pa 202606042559 to: remodel of 6 bathrooms 1 kitcen | 1 family dwelling | $905,000 | — | 202608196823 |
Electrical: 1 permit
From Mar 29, 2016 to Mar 29, 2016. Fewer than 5 electrical permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 3, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2016: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.