Permits Index
6
Permits, 24 months
31 on record
22
Roofing permits
Sep 16, 2026
Last permit issued
24
Addresses with a page

Roofing: 22 permits

From Jan 16, 2015 to Jul 29, 2026. Fewer than 5 roofing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 4 listed below. Earlier permits, 18, are on their house pages: 2024: 1 · 2023: 1 · 2022: 1 · 2021: 3 · 2020: 1 · 2019: 1 · 2018: 4 · 2017: 1 · 2016: 1 · 2015: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 29, 2026otc alterations permit: construction revision @ permit# 201701177299. revised 3 rd floor plan layout per inspector requested. revised roof deck railing to woodoffice$1—202607145010
Oct 31, 2025otc alterations permit: comply with nov 2025-34272. minor interior alteration. adding new half bath, relocating bedroom closets, opening kitchen to dining room, redesign kitchen layout, modify stairs for headroom clearance, replace windows and doors in-kind at existing openings, new roof to replace existing1 family dwelling$125,000—202510177627
Mar 31, 2025ReRoof: reroof torch down1 family dwelling$10,800—202503313356
Dec 6, 2024ReRoof: re-roofing: remove and replace roofing material / existing roofing material2 family dwelling$28,800—202412066289

Plumbing: 3 permits

From Aug 8, 2019 to May 12, 2021. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 3, are on their house pages: 2021: 2 · 2019: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Solar: 2 permits

From May 19, 2022 to Sep 16, 2026. Fewer than 5 solar permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 16, 2026solar permit: installing 12 solar pv modules, 440 watts per module, total no. of rating 5.28 kw. mounted: roof, ballasted: n | install a 5.28 kw roof-mounted photovoltaic solar system consisting of 12 seg-440-btd-bg modules with enphase iq8ac microinverters, qbase2 family dwelling$7,500—S20260806705

Electrical: 2 permits

From Jun 28, 2017 to Mar 3, 2026. Fewer than 5 electrical permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2017: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 3, 2026otc alterations permit: reference to pa#202110291497 to revise ground floor adu/ garagae. internal entrance. cancel gas meter to have full electric for the entire house2 family dwelling$1—202603036813

Water heater: 1 permit

From Feb 14, 2022 to Feb 14, 2022. Fewer than 5 water heater permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 1 permit

From Feb 7, 2019 to Feb 7, 2019. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2019: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.